Pondosi Sumuran 1
Pondosi Sumuran 1
1 Dimensi
M.T
Dimensi
Kolom
H1 Kp = 40 cm
Kl = 40 cm
Sumuran
T
D = 70 cm
Luas = 3848 cm2
Keliling = 219,9 cm'
H2
Dimensi pile cab
L B = 100 cm h.1 = 150 cm
L = 100 cm h.2 = 500 cm
f2
kb
C
x = 0 cm t= 30 cm
B
ka
a = 45 cm e= 35 cm
D
C
c = 50 cm
f2
f1 D f1 f1 = 10 cm
Data Tanah (hasil soundir ) f2 = 10 cm
Keterangan
qc = 250 kg/cm2
fs = 0 kg/cm2
Data bahan
fc' = 18 Mpa
fy = 300 Mpa
beton = 0,0024 kg/cm3
tanah = 0,0015 kg/cm3
2 Load (dari Out Put reakasi joint base analisis struktur dengan ETABS V.09)
Pu = 31.000,0 kg FZ MX MY
Mx = - kg.cm ##### 0 0
My = - kg.cm
P=
Sengkang
Asspiral = 50,26548246 mm2 tulangan dia 8 mm
Jarak sengkang maksimal 48*D.Sengkang
S= 384 mm
Dipasang sekang dia 8-300 mm
4 Analisa Poer
a. Check terhadap geser
Ukuran Poer
B = 100 cm
L = 100 cm
t = 30 cm
d' = 7 cm
d (t-d') = 23 cm
Beban Poer = 3,42 kg/cm2
bo =2* (ka+d)+2*(kb+d) = 252 cm
Vu = 20.623 kg
Vc = 2.459.035 N
= 245.903 kg
= 147.542 > Vu, aman
Geser 1 arah x
bo = 7
Vu = 2.394 Kg
Vc = 1/6*√fc'*bo*d
4.950 kg > Vu, aman
Geser arah Y
bo = 7
Vu = 2.394 kg
Vc = 1/6*√fc'*bo*d
= 4.950 kg > Vu aman
b Check terhadap Momen
z = 30
Mu = 153.878 kg.cm
= 15.387.750 N.mm
Mu+My = 15.387.750 N.mm
min = 0,0047
Asmin = 1073,3 mm2
As pakai = 12 Ø 6
= 339,3 mm2
a = 0,024586377
Mr = 18.727.918 N.mm
187.279,18 kg.cm
Dipasang Ø = 12-15
Tulangan susut = 0,002.b.d
= 140
As pakai = 5 Ø 10
= 392,7 mm2
Jarak Tulangan susut 20 cm