Fire Pump Check List

This inspection checklist summarizes the findings of a fire pump system inspection conducted at Cotton Clothing Ltd. on November 4, 2019. The inspector found that as-built drawings and most required documentation were available, but individual fire pump acceptance test reports and manufacturer curves were missing. Visual inspection found that the isolation valve, flow meter, and pressure gauges met requirements, but the diesel pump controller had an abnormal condition. The factory was asked to provide missing documentation and address deficiencies including supervision of closed valves and a missing reservoir level gauge.

Uploaded by

Arafat Robin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
487 views1 page

Fire Pump Check List

This inspection checklist summarizes the findings of a fire pump system inspection conducted at Cotton Clothing Ltd. on November 4, 2019. The inspector found that as-built drawings and most required documentation were available, but individual fire pump acceptance test reports and manufacturer curves were missing. Visual inspection found that the isolation valve, flow meter, and pressure gauges met requirements, but the diesel pump controller had an abnormal condition. The factory was asked to provide missing documentation and address deficiencies including supervision of closed valves and a missing reservoir level gauge.

Uploaded by

Arafat Robin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Inspection Checklist

Factory: Cotton Clothing Ltd. Date of Inspection: 4-Nov-2019

Accord ID: 12051 Inspector(s): Safawan Abyaz

Fire Pump System


Pre-T&CVI Documentation and Equipment Review
Document Review
Yes x No Approved as-built drawings are available and on-site, including:
Pump Room Detail Fire Water Storage Tank Detail
Yes x No Required documentation is available and on-site, including:
Pump Acceptance Testing x Product Information Sheets and Listing Information
x Third Party Listing Certificates Manufacturer's Fire Pump Test Curve
Pump and Driver Information
Model Number: NF-S-150-100 Suction/Discharge Diameter: 6X4 Rated Flow/Pressure: 750/116 psi
Diesel Pump Impeller Diameter: 248 mm Rated Speed (RPM): 2900 Maximum Operating Pressure: 127 psi
Churn Pressure: _____________ Head at 150% Capacity: 88 psi
Diesel Motor Model Number: FD140H Rated Power (HP): 127 Rated Speed (RPM): 2900
Model Number: NF-S-150-100 Suction/Discharge Diameter: 6X4 Rated Flow/Pressure: 750/116 psi
Electric Pump Impeller Diameter: 248 mm Rated Speed (RPM): 2900 Maximum Operating Pressure: 125 psi
Churn Pressure: _____________ Head at 150% Capacity: 87 psi
Electric Motor Model Number: NMCM501002PO Rated Power (kW): 75 Rated Speed (RPM): 2940
Visual Pre-Inspection
X Yes No Isolation valve provided for pump room test header line
X Yes No Fire pump room test header line flow meter listed and calibrated
X Yes No Pressure gauge provided on suction and discharge sides of fire pump(s)
Yes X No Fire pump controllers free of abnormal system conditions
Pre T&C Inspection notes
* Disel pump controller was not free of abnormal condition.
* Normally closed valves shall be supervised. (Flow Testlines)
* Reservoir level gauge is missing.
* factory has to provide invidual fire pump acceptance test report.
* factory has to provide invidual fire pump manufacturer curve.
* PS lines, Fuel Lines, Flow test line, anti-vortex plates details required.
* Provide reservoir details with section drawing.