Project Charter
Project Charter
Contents
Scope ........................................................................................................................ 4
Assumptions .............................................................................................................. 7
Constraints................................................................................................................. 7
1
2
Overview of the Project
calls for smart- phone designs that customers find attractive, and to this
project objectives, and defines the authority of the project manager. It serves
as a reference of authority for the future of the project. The terms of reference
Project Goals The goals of this project is to identify the minimum duration
required to finish the overall production of the new smartphone using new
3
the investment costs and overconsumption of raw materials. Practicing such
improved smartphones that meets customer requirements and needs, with less
defects and losses. The reason for why this project was carried out is mainly
production system and finishing the project without any sensitive issues that
could limit progression of this project, we need to identify some vital steps in
the project that must be managed correctly. 2.2 Objectives The objectives of
this project are; 1) To produce smartphones with features that meets customer
system.
Scope
since it has gradually entered their everyday life. It is a mobile phone with
been used widely and has helped us in many occasions and safe our lives. But
Belkhir L. (2018), smartphones are damaging the environment and will have
the biggest carbon footprint in the tech industry by 2040, meaning that
4
smartphones emit huge amount of carbon dioxide to the environment, from the
atmosphere and cause greenhouse effect, which will then bring other
smartphone production and disposal over the last 10 years is proving to have a
significant impact on our planet. Due to this very reason, many manufacturers
recycled at its end life as well as release less toxic substances, has becomes a
production system that can be used for multiple times is considerably important,
this has led to the decision of choosing smartphone industry as the main topic
Major Milestones
findings
5
Design concept 5 days
Major Deliverables
current trends.
increase productivity.
study the suitability of the process for the design, after prototype testing.
Sometimes, the confirmed detailed designs won’t cope with the current
5) Quality Control/ Testing Quality: control will help us to identify and enable
6
us to serve only quality product. This also will help us to reduce the cost
of manufacturing.
Assumptions
At the end of this project, we expect to get the duration required to complete
the overall project of the new sustainable smartphone with new features and
number of users.
Constraints
3) Be recyclable at end-of-life;
environmental impact;
7
Business Need or Opportunity
production system and finishing the project without any sensitive issues that
could limit progression of this project, we need to identify some vital steps in