PE DC 411 510 E004 R0 - Relay Setting Chart
PE DC 411 510 E004 R0 - Relay Setting Chart
Page 2 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
INPUT
Generator Home
Parameters Value Unit
Rated power 270 MW Bottom
Rated voltage 16.5 kV
Power factor 0.85
Rated MVA 317.65 MVA
Rated current 11115.1 A
Frequency 50 Hz
Xd" 16.8 %
Xd' 24.7 %
Xd 170 %
Tolerance ±15 %
I2 8 %
I22t 8
Overload capability 50 %
Overload duration 15 sec
Page 3 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Grid data
Rated voltage 400 kV
Fault level 40 kA
MVAsc 27712 MVA
Unit Transformer
Power rating 20 MVA
HV voltage 16.5 kV
LV voltage 6.9 kV
Impedance 10 %
Tolerance 10 %
Vendor group Dyn1
Page 4 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
GR2- G60
Settings Group 2
UNDERVOLTAGE Parameters
UV1 FUNCTION Enabled
UV1 MODE Phase-Phase
UV1 PICKUP 0.7 pu
CURVE DT
UV1 DELAY 0s
UV1 MIN VOLTAGE 0.6 pu
Note : U/V function shall be used in conjuction with Field failure protection to trip in class A.
Page 5 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
GR2- G60
Settings Group 2
OVERVOLTAGE Parameters
OV1 FUNCTION Enabled
Element 1 OV1 PICKUP 1.1 pu
OV1 DELAY 6s
OV1 FUNCTION Enabled
Element 2 OV1 PICKUP 1.3 pu
OV1 DELAY 0s
Page 6 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Rated frequency: 50 Hz
GR2- G60
Settings Group 2
UNDER FREQUENCY Parameters
FUNCTION Enabled
MIN VOLT 0.65 pu
Element 1
PICKUP 48.5 Hz Alarm
DELAY 2.5 s
FUNCTION Enabled
MIN VOLT 0.65 pu
Element 2
PICKUP 47.5 Hz Trip
DELAY 2.0 s
Page 7 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Rated frequency: 50 Hz
GR2- G60
Settings Group 2
OVER FREQUENCY Parameters
FUNCTION Enabled
Element 1 PICKUP 51.5 Hz Alarm
DELAY 2s
Element 2 FUNCTION Disabled
Page 8 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Current Set: 0.823 In A
Time Delay: 2 sec
Action : Alarm
GR2- G60
Settings Group 2
PHASEIOC1 Parameters
FUNCTION Enabled
Element 1 PICKUP 1 pu Alarm
DELAY 2s
RESET DELAY 2s
Page 9 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Trip stage setting: 100 % of Gen. max. negative phase sequence current
Page 10 of 41
GENERATOR NEGATIVE SEQUENCE PROTECTION (46 G2)
Trip stage setting: 100 % of Gen. max. negative phase sequence current
Action (Class C): Trip
STG1 PICKUP = 90 % x 8
STG1 K VALUE 7.2 %
GR2- G60
Settings Group 2
GENERATOR UNBALANCE Parameters
FUNCTION Enabled
INOM 0.823 pu
STG1 PICKUP 8
STG1 K VALUE 7.2
STG1 TMIN 3s
STG1 TMAX 600 s
STG1 K RESET 240 s
STG2 PICKUP 5.2%
STG2 PKP DELAY 2s
46Q2
soft timer
46Q.2T
& Trip (Class A1)
GT HV CB OPEN
Page 11 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Page 12 of 41
GR2- G60
Settings Group 2
PHASE DISTANCE Z1 Parameters
FUNCTION Enabled
DIR Forward
XFMR VOL CONNECTION None
XFMR CUR CONNECTION None
REACH 2.0 ohm
RCA 90
COMP LIMIT 90
DIR RCA 90
DIR COMP LIMIT 90
SUPV 0.9 pu
VOLT LEVEL 0
DELAY 2.5 s *
PHASE DISTANCE Z2 Parameters
FUNCTION Enabled
DIR Forward
XFMR VOL CONNECTION None
XFMR CUR CONNECTION None
REACH 1.4 ohm
RCA 90
COMP LIMIT 90
DIR RCA 90
DIR COMP LIMIT 90
SUPV 0.9 pu
VOLT LEVEL 0
DELAY 2s *
* To be coordinated at site based on downstream me se ngs
Page 13 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
GR2- G60
Settings Group 2
SENSITIVE DIRECTIONAL
Parameters
POWER> Directional power 1
FUNCTION Enabled
RCA 180.00
CALIBRATION 0
STG1 SMIN 0.004 pu
STG1 DELAY 0s
STG2 SMIN 0.004 pu
STG2 DELAY 0s
Page 14 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
GR2- G60
Settings Group 2
SENSITIVE DIRECTIONAL
Parameters
POWER> Directional power 2
FUNCTION Enabled
RCA 0
CALIBRATION 0
STG1 SMIN 0.004 pu
STG1 DELAY 0s
STG2 SMIN 0.004 pu
STG2 DELAY 0s
Page 15 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Dead mach I> 0.8 In A
Dead mach V< 77 V
Dead mach tPU 1 sec
Dead mach tDO 1 sec
Action Trip (Class A)
GR2- G60
Settings Group 2
ACCIDENTAL ENERGIZATION Parameters
FUNCTION Enabled
ARMING MODE UV and Offline
OC PICKUP 1.0 pu
UV PICKUP 0.7 pu
OFFLINE OFF
BLOCK OFF
Page 16 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Offset setting: = 0.5 x Xd' Ohm (For both Stage I & Stage II)
1.9 Ohm
Stage I Stage II
Circle diameter: = Xd Ohm = Zb Ohm
26.22 Ohm 15.43 Ohm
Recommended setting:
Alarm stage
FFail Alarm Angle: 25 deg
FFail Alarm delay: 5 sec
Page 17 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
GR2- G60
Settings Group 2
LOSS OF EXCITATION Parameters
FUNCTION Enabled
CENTRE 1 9.5 ohm
RADIUS 1 7.5 ohm
V SUPV 1 Enabled
PKP DELAY 1 0s
CENTRE 2 15.0 ohm
RADIUS 2 13.0 ohm
V SUPV 2 Disabled
PKP DELAY 2s
UV SUPV 0.7 pu
BLOCK OFF
Page 18 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
P Slip Za Forward: 13 /In Ohm
P Slip Zb Reverse: 43.5 /In Ohm
P Slip Zc 11 /In Ohm
P Slip Timer T1: 0.015 sec
P Slip Timer T2: 0.015 sec
Lens Angle: 90 deg
Blinder Angle: 80 deg
Action Trip(Class C)
Page 19 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
GR2- G60
Settings Group 2
POWER SWING DETECT Parameters
FUNCTION Enabled
SOURCE SRC1
SHAPE Mho shape
MODE Two step
SUPV 0.050 pu
FWD REACH 8.8 ohms
FWD RCA 90 deg
REV REACH 8.8 ohms
REV RCA 90 deg
OUTER LIMIT ANGLE 120 deg
MIDDLE LIMIT ANGLE 90 deg
INNER LIMIT ANGLE 60 deg
DELAY 1 PICKUP 0.020 s
DELAY 1 RESET 0.050 s
DELAY 2 PICKUP 0.015 s
DELAY 3 PICKUP 0.008 s
DELAY 4 PICKUP 0.015 s
SEAL-IN DELAY 0.400 s
TRIP MODE EARLY
BLOCK OFF
Page 20 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Pickup setting, Is1: 0.2 In
Initial slope, k1: 0 %
Bias pickup setting, Is2: 1 In
Second slope, k2: 20 %
Recommended setting:
Pickup setting: 0.2 In
Slope 1: 20 %
Break 1: 1.2 pu
Slope 2: 80 %
Break 2: 7 pu
GR2- G60
Settings Group 2
STATOR DIFFERENTIAL Parameters
FUNCTION Enabled
LINE END SOURCE SRC 1* *Source to be selected as entered in
NEUTRAL END SOURCE SRC 2* system setup>source menu
PICKUP 0.2 pu
SLOPE1 20%
BREAK1 1.2 pu
SLOPE2 80%
BREAK2 7 pu
Page 21 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Generator transformer(GT) & Generator Overfluxing withstand capability is tabulated below (Derived from Over
Fluxing curves obtained from Generator manufacturer and GT manufacturer:
Recommended setting:
Alarm stage
Alarm setting: 1.05 pu
2.31 V/Hz
Alarm delay: 10 sec
Trip stage
V/Hz>1 Trip setting-1: 1.08 pu
IDMT Equation: TMS/[(V/F) / (Vn/ Fn) -1 ]2
V/Hz> 1 Trip Set: 2.38 V/Hz
V/Hz> 1Trip TMS: 0.4
Page 22 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Combined 3 definite time and single IDMT characteristics is been used in line with relay manual.
Important
Refer multistage over fluxing characteristics as per Areva Manual P34x section (AP)6-66 figure 18
Note:
& 19. Logic indicated in fig 19 to be implemented in relay.
Generator transformer(GT) & Generator Overfluxing withstand capability is tabulated below (Derived from Over
Fluxing curves obtained from Generator manufacturer and GT manufacturer:
Rated Freq: 50 Hz
Rated Voltage: 16.5 kV
PT Primary: 16.5/sqrt(3) kV
PT Secondary: 110/sqrt(3) V
Page 23 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
GR2- G60
Settings Group 2
VOLTS PER HERTZ 1 Parameters
FUNCTION Enabled
SOURCE SRC1
PICKUP 1.1 pu
CURVE INVERSE CURVE A
MULTIPLIER 5.5
T RESET 0s
BLOCK SRC1 VT FUSE FAIL OP
VOLTS PER HERTZ 2 Parameters
FUNCTION Enabled
SOURCE SRC1
PICKUP 1.3 pu
CURVE DT
MULTIPLIER 2
T RESET 0s
BLOCK SRC1 VT FUSE FAIL OP
Page 24 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Voltage setting : 0.04 pu
Time setting : 0.2 sec
Action: Trip (class A)
GR2- G60
Settings Group 2
AUXILIARY OV1 Parameters
FUNCTION Enabled
SOURCE SRC1
PICKUP 0.04 pu
PICKUP delay 0.2 s
BLOCK OFF
Page 25 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Pick up value of the current = 0.2 x NGT secondary voltage/(R) x ICT ratio
tripping: 0.91
Recommended setting:
Alarm stage
Alarm setting: 111 Ohm*
Alarm delay: 10 sec
Final settings shall be done during commissioning based on primary tests to determine values under normal
condition. To be carried out at site as per operating instruction of the relay
Page 26 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Page 27 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
GR2- G60
Recommended setting:
Alarm stage
Alarm setting: 5000 ohm
Alarm delay: 10 sec
Settings Group 2
SH STATOR GROUND Parameters
FUNCTION Enabled
STG1 PICKUP 5 kohms *
STG1 DELAY 10 s
STG2 PICKUP 2 kohms *
STG2 DELAY 1s
CT ANGLE COMPEN 0 degrees *
OC PICKUP 0.2 pu *
OC DELAY 3s
Vsupv 0.002 pu
Isupv 0.002 pu
BLOCK OFF
* Final settings shall be done during commissioning based on primary tests to determine values
under normal
Page 28 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Alarm stage
Alarm setting: 80000 Ohm
Alarm delay: 10 sec
Trip stage
Trip setting: 5000 Ohm
Trip delay: 1 sec
Action Trip (Class A)
GR2- G60
Settings Group 2
FIELD GROUND PROTECTION Parameters
FUNCTION Enabled
INJECTION FREQ 1.00 Hz
INJ CONNECTION TYPE Single point
STG1 PICKUP 80 kohms Alarm
STG1 DELAY 10.0 s
STG2 PICKUP 5 kohms Trip
STG2 DELAY 1.0 s
UC PICKUP 1.00 mA
UC DELAY 1.0 s
BLK OFF
Page 29 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Current Set: 0.1 In A
Time Delay: 1.5 sec*
*: The above time setting shall be coordinated at site with line side protection.
Page 30 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
In case of single turn inter turn fault, unbalance produced in faulty phase leads to a voltage 0.8976 p.u. in the faulty
phase, with other two phase voltages being normal.
N (110/sqrt(3)) / (61)
V 110 / sqrt(3)
VOD 6.25 V
Recommended setting:
Voltage setting : 6 V
Time setting : 0.2 sec
Action: Trip (Class A)
Page 31 of 41
Document No: PE-
4X270 MW BHADRADRI TPS
DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Pickup setting, Is1>: 0.2 pu
High set setting, Is-HS1>>: 8 pu
Initial slope, k1: 20%
Second slope,k2: 80%
Action Trip (class A)
Page 32 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Relay Input:
Recommended setting:
Pickup setting, Idiff>: 0.2 pu
High set setting, Idiff>>: 8 pu
Initial slope, k1: 20%
Second slope, k2: 80%
Action Trip (Class A)
Page 33 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Current Seting: 1.0 In A
Time Delay: 2 sec*
Action Trip (Class A)
*Time setting shall be co-ordinated at site such that 51GT shall operate after setting of distance protection.
Page 34 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Rct 2 Ohm*
MVA 1000
Maximum fault current (HV side):
3 HV VOLTAGE Z(min.)
320 1000
3 420 0.145 0.95
3193.458 A
Where, RL 8.87 x 0.20 [For 2.5 sq. mm cable of 200 meter length]
Page 35 of 41
Document No: PE-
4X270 MW BHADRADRI TPS
DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
320 1000
3 420 0.145 0.95
3193.36 A
Where, RL 8.89 x0 [CT shall be shorted at UT marshalling box using 2.5 sq mm cable]
Page 36 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
201000
3 16.5 0.085 0.9
7775.99
A
Corresponding CT secondary current
= 7775.99 x (1/800)
(If):
If= 9.72 A
Recommended setting :
Current Setting: 10 In A
Action Trip (Class A)
Page 37 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Load details on 11kv unit bus during starting of CWP are tabulated below:
S. No. Load description MW MVAr Remarks
Starting load for Refer pg 93 of 125 of doc. PE-DC-411-565-
1 17.666 26.716
BFP E002, Rev 04
Page 38 of 41
Document No: PE-
4X270 MW BHADRADRI TPS
DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
20 1000
3 6 .9 0.1 0.9
18594.76 A
Where, RL 8.89 x0 [CT shall be shorted at UT marshalling box using 2.5 sq mm cable]
Page 39 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Pickup setting, Is1>: 0.2 pu
High set setting, Is-HS1>>: 12 pu
Initial slope, k1: 20%
Second slope, k2: 80%
Action Trip(Class A)
Page 40 of 41
Document No:
4X270 MW BHADRADRI TPS
PE-DC-411-510-E004
RELAY SETTING CALCULATIONS Revison: 00
FOR GENERATOR, GT & UAT PROTECTION
Date: 08-11-2018
Recommended setting:
Current Set: 0.1 In A
Time Delay: 1 sec
Action Trip (Class A)
Page 41 of 41