0% found this document useful (0 votes)
509 views14 pages

Project Schedule Structural

This document provides a monthly schedule for a construction project from July 23, 2018 to August 23, 2018. Key activities include civil works like laying foundations, gravel bedding and backfilling. Foundation works involve rebar installation, formworks and concrete pouring for footings and columns over 11 items. The schedule is broken down week-by-week and identifies the planned duration and dates for each activity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
509 views14 pages

Project Schedule Structural

This document provides a monthly schedule for a construction project from July 23, 2018 to August 23, 2018. Key activities include civil works like laying foundations, gravel bedding and backfilling. Foundation works involve rebar installation, formworks and concrete pouring for footings and columns over 11 items. The schedule is broken down week-by-week and identifies the planned duration and dates for each activity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

PROJECT MONTHLY SCHEDULE

JULY 2 3, 2018 - AUGUST 2 3, 2 1 0 8


PROJECT:
LOCATION:
OWNER:

ITEM DURATI
ACTIVITIES JULY 2018
NO. ON
(DAY/S) WEEK 3 WEEK 4 WEEK 5 WEEK 6
16 17 18 19 20 21 23 24 25 26 27 28 30 31 1 2 3 4 6 7 8 9 10

A.1 CIVIL WORKS


1 Layout & Staking
Foundation Phase 1 9
2 Levelling / Compaction
Foundation Phase 1 12
3 Gravel Bedding
Foundation Phase 1 11
4 Lean Concrete
Foundation Phase 1 12
5 Backfill / Levelling / Compaction
Ground Floor Phase 1 18

A.2 FOUNDATION WORKS

6 Rebar Works Footing (Fabrication & Installation)

Foundation Phase 1
Rebar Works Columns / Shear walls (Fabrication &
7
Installation)
Foundation Phase 1 10
8 Formworks (Footing)
Foundation Phase 1 10
9 Formworks (Column FND-GF)
Foundation Phase 1
10 Concrete Footing (4000 psi)
Foundation Phase 1 3
11 Concrete Column FND-GF (4000 psi)
Foundation Phase 1

note: considering week 1 july 1

PREPARED BY: CHECKED BY: NOTED BY:

NAME NAME NAME


DESIGNATION DESIGNATION DESIGNATION
COMPANY COMPANY COMPANY
E

CONCRETE POURING OF FOOTING RELOCATION OF TEMFACIL

AUGUST 2018 SEPTEMBER 2018


OCTOBER 201
WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11 WEEK 12 WEEK 13 WEEK 14
11 13 14 15 16 17 18 20 21 22 23 24 25 27 28 29 30 31 1 3 4 5 6 7 8 10 #################################24 25 26 27 28 29 1 2 3 4 5
APPROVED BY:

NAME
DESIGNATION
COMPANY
OCTOBER 2018 NOVEMBER 2018 DECEMBER 2018 JANUARY 2019
EEK 14 WEEK 15 WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19
6 8 9 10 11 12 13 15 16 17 18 19 20 22 23 24 25 26 27 29 30
9 FEBRUARY 2019 MARCH 2019 APRIL 2019
EEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20
MAY 2019 JUNE 2019 JULY 2019
EEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17
AUGUST 2019 SEPTEMBER 2019 OCTOBER 2019
EEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 17 WEEK 18 WEEK 19 WEEK 20