110KV CABLE TRENCH NEW Old
110KV CABLE TRENCH NEW Old
2 Page 5 of Page 38 Grade of Concrete and steel We have Considered M20 and Fe - 415 only
as per Indian Standard IS - 456 - 2000 &
IS 1786 - 2008
4 Page 8 of Page 38 Load details not clear Load details are given in table - 1
en in table - 1
of various forces
the drawing attached.
CIVIL DESIGN REPORT
REVISION NO :
REVISI
ORIGINATOR CHECKED APPROVED REMARKS
ON
Design Methodology
Limit state Design as per IS-456 -2000, SP-16-1980. Other relevant standards have been specified in
DESIGN DETAILS
1. GENERAL
1 Reference :IS456 -2000 (Hand Book )
2 Ties Cl : 26.5.3.2
3 Shear considaration Cl : 22.6.2.1
4 Footing Cl : G .1.1
5 Reinforcement Cl : 34.3.1 / 34.1.2
6 One way shear Cl : 40.2.1.1 / Table 19
7 Two way shear Cl : 31.6.1
8 Permissible Shear Cl : 40.1
9 Permissible Stress Cl : 31.6.3.1 40.4
10 Stirrups(Sr) Cl : 26.5.1.3
11 All foundation shall be R.C.C and shall be conventional pad and pedestal type in general
12 All foundation shall be R.C.C and shall be conventional pad and pedestal type in general
13 Minium depth of foundation shall be 1.0 M for equipments and 2..0 M for towers from NGL
14
SBC Considered as 20T / m2 (Minimum ) as referred to P(3) of 50 - [ Amendments to the TENDER & Clarification to
15
a Density of soil : 1700 kg /m3
b Density of Cone : 2500 kg /m3
c
Angle of internal friction repose of soil :20 0 deg (280 for Transformer )
16 Pages : 41- 46 to 48 to 50 of IS456 -2000
17
F.O.S has been considered under clauses 17.1.1, 17.2 of IS 1904/1986. for respective civil foundation.
1 M20 Concrete shall be used for all St load bearing members as per IS456 -2000 & Reinforcement bars confirming to
considered
2
75 mm thick P.C.C 1:4:8 (nominal mix ) using 40 mm HBG metal shall be provided below all underground structures
3
The plinth height of equipment &towers shall be 400mm above GL
4
Foundation shall be designed for a factor of safety 1.50 for equipments and Transformer( As per IS-1891)
5 All foundation shall rest on virgin soil only
CIVIL DESIGN REPORT
6
For open foundation,the minimum width of the foundation shall be 1.0m and minimum depth of 1.0 mtr as per design
7 As the equipments are STATIC in nature and no rotating parts are involved, we have not used IS -2974
8 a) Minimum Depth of excavation for all types of cables trenches is 1.0m from existing ground level.
b) Where depth of foundation is less than 1.0meter, compacted sand shall be provided to fill the excavated pit upto re
c) Soil bearing capacity at the foundation depth is 29.56 kN/m 2 (minimum of all bore holes results.
d) The top of cover slab of all cable trenches is 50mm above the finished swithyard surface level.
CIVIL DESIGN REPORT
3. DESIGN
SOIL PARAMETERS
Allowable bearing capacity of soil
a is considered 20 kN/m2
b Unit weight of soil 17 kN/cum
c Unitfrom surcharge pressure 20 kN/m2
d Earth pressure co-eff at rest 1
e Ground water table 3 m
1 Material Properties:-
a Concrete - fc 20 N/mm2
b Reinforcing steel - fy 415 N/mm2
Main reinforcement:-
Diameter of reinf. Steel 12 mm
Effective Depth (d) 115 - 30 - 6 79 mm
Assuming depth of stress block,
(a) 7.00 mm
Area of steel, As M x 1000000 /(0.9 x fy x (d-a / 2)) 108.92 mm2
CIVIL DESIGN REPORT
Distribution reinforcement:-
Min. Reinforcement 0.0018 x bxt = 0.0018 x 2000 x 115 414 mm2
Provide 10Nos dia 8mm bars as
main reinf. Ast provided 500 mm2
Check for shear:
Shear force (Case 1: for point
load) 0.79 x 2.079 x / 2 + 2.50 / 2 2.07 kN
Vertical Reinforcement:-
Diameter of reinf. Steel 12 mm
Effecctive depth (d) 150 - 66 84 mm
Assuming depth of stress block,
(a) 29.61 mm
Area of steel, As M x 1000000 /(0.9 x fy x (d-a / 2)) 1860.90 mm2
Check for stress block, a a = 1860.9 x 415/(0.85x20x1500) 30.29 mm
Consideration is NOT OK, so Ast, should be more than 109mm 2 1213.03 mm2
Minimum reinf. 0.18% 270.00 mm2
so spacing is = 93mm say 90mm.
Distribution reinforcement.
CIVIL DESIGN REPORT
SIGN REPORT
FOR
WITCHYARD
E TRENCH
CIVIL DESIGN REPORT
NT NO: ED - 001B
VISION NO :
D DESIGN METHODOLOGY
ncrete
978
GN DETAILS
1. GENERAL
nsformer )
ers as per IS456 -2000 & Reinforcement bars confirming to IS 1786 (fe 415)
bove GL
acted sand shall be provided to fill the excavated pit upto required depth of foundation.
CIVIL DESIGN REPORT
3. DESIGN
CIVIL DESIGN REPORT
L/DWG/CVL/114, SVEPL/CSDPL/DWG/CVL/115
TION : CABLE TRENCH
References
RED FOR OTHER SMALLER CABLE TRENCHES ALSO)
CIVIL DESIGN REPORT
CIVIL DESIGN REPORT
CIVIL DESIGN REPORT
So OK
h side wall and bottom slab, i.e dia 12mm @ 100mm c/c
CIVIL DESIGN REPORT