This document provides a risk assessment for air conduction and mechanical ventilation work at OT2 Parcel C in KL EcoCity. It identifies several hazards for activities like material delivery, lifting, stacking, erecting working platforms, fabrication, installation, and painting. Potential risks include injuries from falling or moving objects, slips and falls, being struck by tools or materials, ergonomic injuries, electric shock, and inhalation of dust or chemicals. Control measures recommended include using proper lifting techniques, supervision, designated walking areas, well-maintained tools and equipment, appropriate PPE, adequate rest breaks, and dust collection systems. The risk assessment was prepared by the safety officer and approved by the project manager.

Uploaded by

nara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
508 views2 pages

Air Conditional & Mechanical Ventilation (ACMV)

This document provides a risk assessment for air conduction and mechanical ventilation work at OT2 Parcel C in KL EcoCity. It identifies several hazards for activities like material delivery, lifting, stacking, erecting working platforms, fabrication, installation, and painting. Potential risks include injuries from falling or moving objects, slips and falls, being struck by tools or materials, ergonomic injuries, electric shock, and inhalation of dust or chemicals. Control measures recommended include using proper lifting techniques, supervision, designated walking areas, well-maintained tools and equipment, appropriate PPE, adequate rest breaks, and dust collection systems. The risk assessment was prepared by the safety officer and approved by the project manager.

Uploaded by

nara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Company IREKA ENGINEERING AND CONSTRUCTION Prepared by : Mohd NOORHISHAM BIN MOHD RAMLI

SDN BHD. (Safety and Health Officer).

Process / Location OT2 PARCEL C


Approved by: MR CHAN HUAN CHOONG Date: 20 SEPTEMBER 2016
(Name , designation) Project Manager
Date 20 SEPTEMBER 2016 Reviewed date: Rev. :

WORKPLACE : OT2 PARCEL C KL ECOCITY

ACTIVITY : AIR CONDUCTIONING & MECHANICAL VENTILATION (ACMV)

RISK RATING
SEQUENCE OF JOB HAZARD POTENTIAL RISK CONTROL MEASURE/
GROUP & POTENTIAL HAZARD Prob Sev. Total RECOMMENDATION
(P x S)
Delivery of Material * Mechanical -Minor injury -Workers stay away from moving vehicle/ lorry.
Loading and unloading material Struck by moving part of vehicle. -Damage to property 2 2 4

* Physical -Minor injury -Supervised by designated person during shifting of


Struck/ hit by moving part of 2 2 4 material.
material during shifting activity
(manual handling)

*Physical (Ergonomic) -Negligible injury -Manual handling/lifting should be carry out with
Spine injury - Improper method 2 2 4 correct method.
of handling (refer to method statement)

* Physical -Minor injury -Supervised by designated person during lifting of


Struck/ hit by moving part of 2 2 4 material.
material during lifting activity
(by tower crane)

Stacking/ Storing material. * Physical -Fatality/serious injury -Workers stay away from lifting area.
Falling object (during lifting of -Damage to property 2 4 8
material)

* Physical -Fatality/serious injury -Supervised by designated person during stacking of


Slip/ fall/ collapse of material due -Damage to property 2 4 8 material.
to poor material arrangement. - Routine checking to ensure stability of material.
-To ensure material not obstructing any access way.
-To provide wedge.
Erection of working platform *Physical (Ergonomic) -Negligible injury -Manual handling/lifting should be carry out with
Improper method of handling 2 2 4 correct method.
activity -Scaffolding for working platform are erecting by
experience workers.
-Proper mobile scaffold i.e. stopper for tyre, G.I pipe
for mobile support.

* Physical -Serious injury -Provide proper working platform for workers.


Workers slip and fall 2 3 6 -Plank min. 600mm wide/ cat walk.

Fabrication of pipe * Physical -Serious injury -To ensure hand-tool in good condition.
(Ducting work) Hit by hand-tool 2 3 6

Installation of support bracket and pipe * Physical -Fatality/ serious injury -Provide proper working platform for workers.
Workers slip and fall 2 4 8 -No worker shall be allowed to be on the working
platform while shifting/ mobilise the mobile scaffold.

* Physical -Fatality/ serious injury -To ensure power tool in good condition before used.
Electrical shock (drilling activity) 2 4 8 -Electrical wire shall hang-up and not obstruct
walkway.

* Chemical -Serious injury (long term -Provide dust collector/ dust mask
Inhalation of cement dust during can impair workers lung) 3 3 9
drilling activity.

Painting work * Chemical -Serious injury -Workers must wear suitable PPE i.e air protector etc.
Inhalation (long term can effect 3 3 9
human respiration system)
* Chemical -Serious injury (long tern -Workers must wear suitable PPE i.e glove.
Skin contact with paint/ thinner can impair worker skin/ 3 3 9
dermatitis)

* Physical (Ergonomic) -Negligible injury -Material handling should be carried out with correct
Redundant repeated working 3 1 3 method.
behavior. -Take a 2-3 minutes rest after every 2(two) hours.