JSA-for Lifting Activity by Crane. (11-01-2016)

Uploaded by

Mohammed Minhaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views3 pages

JSA-for Lifting Activity by Crane. (11-01-2016)

Uploaded by

Mohammed Minhaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Doc. No.

: HSE/FRM-22
Rev.: 00
JOB SAFETY ANALYSIS Date: Dec 02, 08
Page: 1 of 3

Project: Gul Ahmed Wind power Project#: 1161 Area: GAWPP-


SITE General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer
Date: 02-02-2016 Supervisor: Muhammad Ali (Mech. Engineer)

Job Description: Lifting & Rigging Activity (Loading/Unloading of the Equipment)


Equipment & Severity
Item Detail of Activity Risk Involved Preventive Measure Responsible Person
Tools used Rating
TRANSPORTATION
 UNEVEN ROAD  CRANE SHOULD BE CHECKED, BEFORE RIGGING 2
1 OF THE MATERIALS
& CRANE TO JOB  CRANE  UNSAFE CONDITIONS TRANSPORTATION TO JOB SITE ON DAILY BASIS. SUPERVISOR 2
SITE.  TRAILER
 PROPER ACCESS (BRIDGES) SHOULD BE USED.
 FLAT BED  CRANE COLLAPSE DURING 3
MATERIAL LOADING /  FLAGMAN WILL BE ASSIGNED WITH THE CRANE & 3
 MULTI AXEL  LIFTING AREA AUTHORIZES
2 UNLOADING HEAVY EQUIPMENT. 2
TRAILER  PERSONAL INJUREY
 MATERIAL MUST BE CHECKED BEFORE LOADING / 3
 LIFTING GEARS  PROPERTY DAMAGE
UNLOADING.
 MATERIAL MUST BE PROPERLY SECURED WITH
(SLINGS,
SETTING UP CRANE  CRANE FAILURE DUE TO SLING & SHACKLES BEFORE LIFTING UP.
FOR LIFTING. SHACKLES,
3 HYDROLIC SYSTEM  CRANE WILL BE SET UP AT LEVEL SURFACE WITH E & P I/C 2
WEB-BELT,
 CAUSE OF SERIOUS OUTRIGGER PADS.
TAG LINE,
 OUTRIGGERS WILL BE FULLY EXTENDED CRANE.
CHAIN BLOCK,
 CRANE MUST BE 3RD PARTY CERTIFIED.
LEVER HOST, FORK HSE INSPECTOR
4 LIFTING WITH CRANE  FIRE DUE TO LOOSE WIRING  ALL LIFTS WILL BE UNDER THE RATED CAPACITY OF 2
LIFTER, PICK WAY
CRANE I.E. LOAD CHART.
TRUCK & ETC).
 CERTIFIED CRANE OPERATOR AND RIGGERS (3RD
INSPECTION OF  FALL OF OBJECT
5 CRANE PARTY CERTIFIED) WILL CARRY OUT THE LIFTING RIGGING ENGINEER 3
& RIGGING GEARS
ACTIVITY.

6 DEMOBILIZATION  ALL LIFTING TACKLES WILL HAVE 3RD PARTY RIGGING 2


CRANES SUPERVISOR
 PERSONNEL INJURY  CERTIFICATIONS & HEALTHY (GOOD CONDITION).
EQUIPMENT’S,
TOOLS AND  SLIPPING  RIGGING PLAN & STUDY REQUIRED FOR HEAVY
WORKER.

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
© Copyrights Ordinance 2002, All Rights Reserved
LIFTING.

 ONLY SINGLE PERSON MUST BE GIVEN SIGNAL TO


CRANE OPERATOR.
 EMPLOYEES SHOULD BE TRAINED ON SAFE
RIGGING TECHNIQUES.

 TRIPPING  TOOLBOX TALK MUST BE CONDUCTED BEFORE


 ELECTRIC SHOCK EACH LIFT.
 DUE TO POWER LINE  LIFTING AREA SHOULD BE BARRICADED WITH
WARNING.
 ALL LOADS WILL BE CONTROLLED BY TAG LINES, IF
LENGTH IS LONG THAN DOUBLE TAG LINE USED.
 LIFTING CREW WILL WORK WITH COMPLETE PPES.
 AREA MUST BE CHECKED & FREE FROM
ELECTRICAL WIRES BEFORE ASSEMBLING TO THE
CRANE.
 TOOL & JOINTS ETC. SHOULD BE LIFT BY ROPE &
BASKET RIGGING
 SCAFFOLDING SHOULD BE ERECTED UNDER SUPERVISOR
 MATERIAL CAN FALL
SKILLED SUPERVISION. 2
7 SCAFFOLDING  PERSONAL FALL
WORK AT HEIGHT
CHARRY PICKLES  FULL BODY HARNESS MUST BE WORN WHILE WORK 3
 IMPROPER SCAFFOLDING
AT HEIGHT 6 FEET & ABOVE. 3
ERECTION
 SCAFFOLDING MUST BE ERRECTED WITH SCAFFOLDING
STANDARD & INSPECTED BY SCAFFOLDING INSPECTOR
INSPECTOR.
 WORK WOULD BE NEVER ALLOWED IN LESS OR
 MANUAL HANDLING 2
LIGHTS & STANDS IMPROPERLY DISPRESSED ILLUMINATION/LIGHTS. RIGGING
8
WORK AT NIGHT (FLOOD LIGHTS  SLIP, TRIP & FALL 2
WHITE)  ALL WORK AT NIGHT ARRANGEMENT MUST BE SUPERVISOR
 POOR ILLUMINATION 2
DONE BEFORE START OF WORK AT NIGHT.

 WASTE MATERIAL SHOULD BE STACKED PROPERLY


WASTE DRUMS  ENVIRONMENT HAZARD RIGGING 1
9 HOUSEKEEPING & DUMPED IN DESIGNATED PLACES.
SHOPPER BAGS  SLIP, TRIP & FALL SUPERVISOR 2
 WASTE MATERIAL SHOULD BE BARRICADED.

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
© Copyrights Ordinance 2002, All Rights Reserved
Severity Rating: (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident

Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?

_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE