1. ABOUT THE PROGRAM
With the massive target of the Solar Rooftop in the state of Rajasthan, the state Government has
recently launched a rooftop solar subsidy program of 18 MW capacity through Rajasthan
Renewable energy Limited. Firstgreen has been selected as successful bidder for
implementation of the proposed solar rooftop program in the state of Rajasthan.
Under the scheme the consumer has to pay only 70% of the project cost and balance 30% is paid
directly by RREC as subsidy for the solar system. Also we are providing 5 year free operation and
maintenance of the project. .
This is the lifetime opportunity to reduce your electricity bill by more than 50% without any
upfront investment at your end.
2. ABOUT FIRSTGREEN
Firstgreen Consulting is a leading solar PV EPC service provider. We have executed over 5 MW of
solar rooftop systems on pan India basis. We have a team of highly qualified and experienced
professionals of the solar industry. We have extensive experience in solar PV ranging from kW
scale project to MW scale solar project. Our activities in Solar Projects‐ have been related to
identification of site, land procurement, assessment of power evacuation feasibility, technology
selection, detailed engineering design, finalizing contracts for supply and implementation,
Project identification and development support, etc. We also provide our services during
implementation phase (Owner’s Engineer), as quality management, site management,
expediting and staff training
Key Strengths
1. Successfully handled over 500 MW of solar advisory projects to various projects to some of the
leading solar project developers.
2. In‐house capacity of conducting the detailed engineering and design of solar power projects
with strong team of over 30 design experts.
3. Over 5 years of experience in design, engineering and project management of large solar power
projects as well as solar rooftop projects.
4. Project management expertise and strong technological knowhow on handling the solar power
projects.
5. Successful track record of executing large solar rooftop project up to capacity of 3 MW under
challenging climatic conditions.
6. Firstgreen blog is one of the largest technological know‐how resources to solar professionals
(www.firstgreen.co/blog). Our daily footfall is over 11000.
7. MNRE Channel partnership for new entrepreneurs. Firstgreen is also a SETNET partner to
National Institute of Solar Energy (NISE) for conducting the solar PV training programs to the
solar professionals.
8. Excellent relationship with the financial institutions and Banks for arranging the financial
closure to our clients.
3. System Overview
This Project is under the RREC Roof Top SPV program as per the Rate Contract issued by RREC
vides No: RREC/SPV RT Prg./18MW/2017‐18/D738 dated 24.05.2018. The Project confirm to
the guidelines of the RREC SPV program.
The proposed 100 KWp Solar Grid Connect Power Plant at factory roofs will consist of crystalline
solar modules arranged in series and parallel combination meeting PCU/Inverter voltage and
current requirement.
The DC output from the solar Panel is directly converted to Grid Compatible AC Output using
Grid Tied String Inverters which is synchronized with the LT side of the Distribution Panel. All the
energy generated through solar panels will be fed to the building load on real time basis as it is a
Grid Tied system.
4. RREC SUBSIDY SCHEME
Capacity 50 kW‐500 kW
RREC approved rate as per
Rs 46.80/Wp
Rate Contract
RREC Subsidy* Rs 14.04/Wp
Beneficiary Cost/Wp Rs 32.76/Wp
Note: ‐ Subsidy is available to institutions registered as Non for Profit
5. SPV POWER PLANT OUTLOOK
PV Module Type Poly Crystalline
Tilt Angle As per Site
Performance Ratio 75% ( 1st Year)
Inverters String Inverters
Project Completion Time 2 ‐ 3 Months
6. PRICE SCHEDULE
S. No. Description System Price ( INR)
1 Design , Engineering and Supply 100 KWp Rooftop PV Rs. 46,80,000
Plant for Captive Consumption
2 Cost after RREC Subsidy 30% (Rs1404000) Rs 3276000
Note:‐The additional cost payable by beneficiary.
7. BILL OF QUANTITY
S.No. Component Specification Make
1 Modules‐320Wp As per Design Vikram Solar/Sova Solar
2 Inverters As per Design Delta/Phocos/INVT
3 Monitoring System 1 Set Delta/Phocos/Fronius
4 Mounting System 1 set GI
5. DC Cables As per Design Siechem Technologies
6. AC Cables As per Design Polycab
7. Lugs and Glands As per Design Reputed Make
8. ACDB for Protection purposes As per Design Onexis Automation
9. Earthing As per Design Traditional/JMV
10. Cable Tray As per Design Armored Flexi/GI
11. Lighting Arrestor 1 set Cu Traditional
Note: ‐ Cable Length and BOS mentioned above are used as per actual site conditions. This BOQ may
be used for reference but actual BOQ may differ as per the detailed engineering.
8. TERMS & CONDITIONS
Price Basis: The quoted price is for at site, including Freight & Transit Insurance.
Tax & Duties: Duties and Taxes are inclusive.
System Warranty: Solar PV Modules shall carry a warranty of 25 years from the date of
supply by manufacturer and the same would be passed on to the customer at the end of
5 years
9. Payment Terms
S.NO Milestone
1. Issue of Purchase Order – 30%
3. Supply of Modules – 40%
4. Supply of Inverter – 20%
5. Power Injection to LT – 10%
10. Delivery and Execution Period
2 ‐ 3 months as per submitted schedule subject to force majeure conditions from the date of
technically and commercially clear order along with advance & handing over the site to us and
RREC approval.
11. Assumptions Made
Power from Solar Plant is being fed to existing LT Panels (415V, 3 Phase).
Building Load is greater than Units generated by Solar Power.
The power generation would be subject to grid availability during solar hours and in the
absence of grid power the plant does not work as per DISCOM guidance.
12. Scope of work
For Firstgreen Consulting Pvt Ltd
Design, Engineering, Procurement &Supply of Solar power system as per specification & BOM
given in our offer.
Installation & Commissioning of Solar Power Plant up to LT Panel including synchronization with
Grid supply.
Supply of Solar Meter, Net Meter are in the scope of supplier while all fees and deposits and
electrical components required for Net Metering would be paid by customer
Providing after sales service during warranty period.
For Customer
The Design, Fabrication and Installation of the Super Structure will be in the scope of the client.
Providing shadow free area on roof on each Roof for installation of solar modules as proposed
in layout
Providing safe Storage place for Material during installation & Commissioning period
Providing water and temporary electricity connection during execution and CMC period.
Providing PC and Internet connection for online monitoring of Plant Performance.
Customer will provide necessary documentation for Net Metering.
The regular cleaning of SPV during 5 years CMC period.
13. Offer Validity
The offer is valid for your acceptance for a period of 30 days from the date of submission of Bid.
Buildings In Rajasthan
Monthly Bill Monthly Unit Existing Electricity Recommended Solar Generation
Amount (Rs.) Consumed Tariff Solar System per Month
100000 Approx. 8 Size 100 kW Approx.
12500 12500 Unit
Monthly Bill Monthly Solar System Cost Payback Period Return On
With Solar Shaving(Rs.) (Rs.) 16 Month Investment
0 100000 1600000 30-40 % p.a