0% found this document useful (0 votes)
84 views

UGC Autonomous III B.Tech - II Sem - I MID Examinations (2017 Batch) Jan-2020 TSSN

This document contains an exam for a telecommunications switching systems course. It has two parts: Part A contains multiple choice and matching questions about switching systems concepts like blocking probability, traffic intensity, and signaling types. Part B asks students to answer two of four short answer questions, including describing step-by-step switching systems, explaining a 100-line switching system, discussing different signaling types, or designing and evaluating a 100 line system using uni selectors. The exam was prepared by Dr. Jana for III B.Tech - II Sem students in the 2017 batch.

Uploaded by

dearprasanta6015
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

UGC Autonomous III B.Tech - II Sem - I MID Examinations (2017 Batch) Jan-2020 TSSN

This document contains an exam for a telecommunications switching systems course. It has two parts: Part A contains multiple choice and matching questions about switching systems concepts like blocking probability, traffic intensity, and signaling types. Part B asks students to answer two of four short answer questions, including describing step-by-step switching systems, explaining a 100-line switching system, discussing different signaling types, or designing and evaluating a 100 line system using uni selectors. The exam was prepared by Dr. Jana for III B.Tech - II Sem students in the 2017 batch.

Uploaded by

dearprasanta6015
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

DOE:

UGC Autonomous
III B.Tech – II Sem - I MID Examinations (2017 Batch) Jan-2020
TSSN
(ECE – A&B)
Time: 1 Hr. 20 Mins. Total Marks: 20
Instructions: 1) Answer Part A & B in Main Answer Booklet only.
2) Answer all Questions in Part-A.
3) Answer any two Questions out of four Questions in Part-B.
Part-A: (20 x 1/2 = 10M)
Choose The Correct Answer:
1. Describe the functions performed by switching systems?
a) Control functions b) establishing c) releasing d) all the above
2. Sharing leads to reduction of____________.
3. Blocking probability can be defined as ____________.
3. Telegraphy introduced in the year ____________.
a)1837 b)1876 C)1846 d)1890
4. Traffic intensity can be measured in _________and_______
5. The control functions are performed by a computer or a processor system are named as,
a) SPC b) step by step c) crossbar d)TDS
6. Which converts electrical signals into audio signals in a telephone set ____________.
7. Signal conditioning includes
a) Amplification b) filtering, band-limiting c) multiplexing and demultiplexing d) all the above
8. Non-blocking switching network can provide_______________ simultaneous paths.
a)N/2 b)N2/2 C)N/4 d)N
9. The probability that a user may get blocked is called______________.
a) blocking probability b)busy hour traffic c)symmetric d)switching network
10.The tone is of 400Hz or 800 Hz named as_______________.
a)routing tone b)busy tone c)dial tone
Match The Following:
1. Subscriber traffic in erlangs a) BHCA*CCR
2. Traffic carried per server b) lost traffic/offered traffic
3. Busy hour calling rate c) busy period/total period
4. GOS d) occupied duration/total duration
5. Average busy hour calls e) average busy hour calls/total number of subscribers
Choose True/False:
1. Space division switching is a variant of Stored Program Control [True/False].
2. The cost capacity index is defined by CRC [True/False].
3. Thyristor is one variant of Electromechanical cross point technology [True/False].
4. Inlets/outlet configuration is one kind of Non-folded network [True/False].
5. Uniselectors are not required for 100 line switching system [True/False].

Answer Any Two Questions: [2*5=10M]


1. Describe step-by-step switching system with a neat diagram.
2. Explain 100-line switching system.
3. Write a short note on the different types of signaling.
4. Design a 100 line switching system using uni selector & then evaluate its performance parameters.
Prepared by
Dr. Jana

You might also like