30 1 Static Equipment Horizontal Erection

This document is an inspection report for the static equipment erection of a horizontal equipment for the MSQ Upgradation Project of IOCL Panipat. It details the inspection checks performed for erection clearance, nuts and washers, sliding plates, nozzles, coordinates, leveling, horizontal alignment, grouting clearance, and final acceptance of the equipment alignment. The report finds the equipment to be within specifications and acceptance is provided by both Larsen & Toubro and Jacobs.

Uploaded by

punitg_2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
224 views2 pages

30 1 Static Equipment Horizontal Erection

This document is an inspection report for the static equipment erection of a horizontal equipment for the MSQ Upgradation Project of IOCL Panipat. It details the inspection checks performed for erection clearance, nuts and washers, sliding plates, nozzles, coordinates, leveling, horizontal alignment, grouting clearance, and final acceptance of the equipment alignment. The report finds the equipment to be within specifications and acceptance is provided by both Larsen & Toubro and Jacobs.

Uploaded by

punitg_2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

FORMAT NO.-LT/MSQ/STAT-EQ-HE/030, Rev.

01
LARSEN & TOUBRO LIMITED
PMC
MSQ UPGRADATION (EPCC-1) PROJECT, IOCL PANIPAT

STATIC EQUIPMENT ERECTION INSPECTION REPORT (HORIZONTAL)

OWNER :-INDIAN OIL CORPORATION LTD. Job No.: 18-3177 REPORT NO.

PMC:- JACOBS ENGINEER INDIA (P) LTD. DATE -

EPCC:- LARSEN & TOUBRO LIMITED UNIT -

EQPT. TYPE & NO. - MANUFACTURER -

LENGTH/HEIGHT - DIAMETER -

DRG.NO.& REV.- WEIGHT -

ACCEPTANCE
S.No. ACTIVITY DESCRIPTION CHECKED REMARKS
L&T JACOBS
ERECTION CLEARANCE (REPORT ENCLOSED
1.0
FORMAT NO……..)

2.0 NUTS TIGHTENED & WASHERS FIXED


3.0 SLIDING PLATE DIMENSION AND GREASING
4.0 C/L OF EQUIPMENT

5.0 NOZZLES, ELEVATION AND ORIENTATION Nozzle No:


As per Drawing Actual
A ELEVATION

B ORIENTATION
6.1 CO-ORIDINATES (FIG. 1&2)

A X W.R.T GRID L1
B Y W.R.T GRID L2
6.2 LEVELING

A AT E1 END
B AT E2 END

7.0 HORIZONTAL ALIGNMENT ( for horizontal eqpt.)

B
E1
E2
X C

B
C

A1
Y A2

G
L2 L1

FIG. 01 FIG. 02

GROUTING CLEARANCE (BASED ON SL. NO.


8.0
01 TO 07)
A CLEANING OF POCKET

B MATERIAL SPECIFICATION
C GROUTING CLEARANCE

9.0 FINAL ACCEPTANCE OF EQUIPMENT ALIGNMENT BASED ON L&T JACOBS REMARKS


A GROUTING CLEARANCE / ACCEPTANCE REPORT (ENCLOSED- YES/NO)
B TIGHTENING OF NUTS OF ANCHOR BOLTS.

CHECKED BY
L&T JACOBS