Risk Identification ID Description

This document identifies and analyzes risks for a construction project. It lists 14 risks in the design phase, 8 risks in the tender phase, 4 risks in the detailed design phase, 11 risks in the progress/construction phase, and 7 risks for financing the investment. For each risk, it provides a description and evaluates the probability of occurrence, potential impact, risk score, responsibility, and possible preventative actions. The overall document provides a comprehensive risk assessment for all phases of the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views3 pages

Risk Identification ID Description

This document identifies and analyzes risks for a construction project. It lists 14 risks in the design phase, 8 risks in the tender phase, 4 risks in the detailed design phase, 11 risks in the progress/construction phase, and 7 risks for financing the investment. For each risk, it provides a description and evaluates the probability of occurrence, potential impact, risk score, responsibility, and possible preventative actions. The overall document provides a comprehensive risk assessment for all phases of the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Risk Identification

ID Description
0.1 Poorly recognized competition (feasibility study)
Design Phase
Preliminary

0.2 Poorly recognized investors preferences (investment feasibility)


0.3 Self Esteem (presentation skills)
0.4 Poor estimation for the Costs of the Project
1.1 Risk of Corruption
1.2 Tender Cancellation
Tender Risk

1.3 Bad Quote to the Project


1.4 Predatory pricing by competitors
1.5 incurring excessive costs (or too low) for marketing and lobbying
1.6 Client's reability risk
Detailed Design

2.1 Improper Design team selection (human Factor)


2.2 Overestimating the cost of the Project
2.3 Failure to meet the investor preferences
2.4 Improper Technology selection
3.1 Protests
3.2 Employees' sickness
Progress Risk / Construction Risk

3.3 Employee's qualification


3.4 Equipment Failure
3.5 Bad work schedule
3.6 Poor management of material resources and suppliers
3.7 Timely Supply of construction Material
3.8 Maintaining standards
3.9 Insufficient Control on the Project
3.10 Poor work Organisation
3.11 Badly recognized soil structure
3.12 Construction material Quality
3.13 Extended Scope of Work
4.1 Political Instability in the Country
Financing the Investment

4.2 Economic Instability in the Country


4.3 Improper Cost Plan
4.4 Risk of Inflation
4.5 Recession in the industry
4.6 Law enforcement
4.7 Contract Precision
4.8 Client Credibility
Probability
Impact Score Preventive Action
Reponsibility Occurrence
Client 0
Organisation 0
Organisation 0
Organisation 0
Environment 0
Client 0
Environment 0
Organisation 0
Organisation 0
Client 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Environment 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Organisation 0
Client 0
Environment 0
Environment 0
Organisation 0
Environment 0
Environment 0
Environment 0
Organisation 0
Client 0
Client
Organisation
Environment