Comparison Novec1230 Vs FM 200 Vs CO2

The document compares the properties of three fire suppression gases: FM 200, Novec 1230, and CO2. All three must be located near or within the protected space. FM 200 and Novec 1230 require no ventilation while CO2 requires ventilation if used in a manned area. FM 200 operates at 25-42 bar, Novec 1230 at 42 bar, and CO2 at 150-200 bar. All three have zero ozone depletion and require hydrotesting every 5 years with refilling if gas loss exceeds 10%.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
832 views3 pages

Comparison Novec1230 Vs FM 200 Vs CO2

The document compares the properties of three fire suppression gases: FM 200, Novec 1230, and CO2. All three must be located near or within the protected space. FM 200 and Novec 1230 require no ventilation while CO2 requires ventilation if used in a manned area. FM 200 operates at 25-42 bar, Novec 1230 at 42 bar, and CO2 at 150-200 bar. All three have zero ozone depletion and require hydrotesting every 5 years with refilling if gas loss exceeds 10%.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

FM 200 (HFC227 ea)

Proximity of Cylinders to Protected


Space Must be located very near or within space to be protected
Ventilation Requirements
No ventilation is required
Pressurized
25 Bar to 42 Bar
Environmental damage Zero Ozone Depletion
GWP- 3500
Installation and maintance Costs
Installation cost vary as per Vendor. But lesser than Novec1230.
AS per PESO standards, Cylinder
Hydrotesting every 5 years Yes ( Required in 5 yrs)
Cylinder decaning & Refilling Gas
loss during Hydrotest Yes if gas loss during hydrotesting is more than 10%, then refilling is required
Periodic monitoring &system Please check pressure guage every week.
maintance Mainteinace to be done every 6 months
main system pricing (2600 Cu.
Mtr. ) Depends on OEM
Maximum fill density kg/Ltr
1
Avaiblity
Easily available
Design Concentration at 21 Deg C
7%
Novec 1230

Must be located very near or within space to be protected

No ventilation is required

42 Bar
Zero Ozone Depletion
GWP- 1

No pricing available

Yes (Required in 5 Years)

Yes if gas loss during hydrotesting is more than 10%, then refilling is required
Please check pressure guage every week.
Mainteinace to be done every 6 months

Depends on OEM

120.00%

Easily available

4.50%
CO2

Must be located very near or within space to be protected

Ventilation Required if it is Manned Area

150-200 Bar
Zero Ozone Depletion
GWP-1

High as compared to FM & Novec

Yes (Required in 5 Years)

Yes if gas loss during hydrotesting is more than 10%, then refilling is required
Please check pressure guage every week.
Mainteinace to be done every 6 months

Depends on OEM

68%

Easily available