FM 200 (HFC227 ea)
Proximity of Cylinders to Protected
Space Must be located very near or within space to be protected
Ventilation Requirements
No ventilation is required
Pressurized
25 Bar to 42 Bar
Environmental damage Zero Ozone Depletion
GWP- 3500
Installation and maintance Costs
Installation cost vary as per Vendor. But lesser than Novec1230.
AS per PESO standards, Cylinder
Hydrotesting every 5 years Yes ( Required in 5 yrs)
Cylinder decaning & Refilling Gas
loss during Hydrotest Yes if gas loss during hydrotesting is more than 10%, then refilling is required
Periodic monitoring &system Please check pressure guage every week.
maintance Mainteinace to be done every 6 months
main system pricing (2600 Cu.
Mtr. ) Depends on OEM
Maximum fill density kg/Ltr
1
Avaiblity
Easily available
Design Concentration at 21 Deg C
7%
Novec 1230
Must be located very near or within space to be protected
No ventilation is required
42 Bar
Zero Ozone Depletion
GWP- 1
No pricing available
Yes (Required in 5 Years)
Yes if gas loss during hydrotesting is more than 10%, then refilling is required
Please check pressure guage every week.
Mainteinace to be done every 6 months
Depends on OEM
120.00%
Easily available
4.50%
CO2
Must be located very near or within space to be protected
Ventilation Required if it is Manned Area
150-200 Bar
Zero Ozone Depletion
GWP-1
High as compared to FM & Novec
Yes (Required in 5 Years)
Yes if gas loss during hydrotesting is more than 10%, then refilling is required
Please check pressure guage every week.
Mainteinace to be done every 6 months
Depends on OEM
68%
Easily available
34%