Installation Checklist - EN
Installation Checklist - EN
TRANSFORMER INSTALLATION
OK NOT OK
NOT CHECKED
TMCE-VPCI Rev.07
1/2
PARTIAL CHECKLIST FOR CORRECT
TRANSFORMER INSTALLATION
ELECTRICAL FITTINGS
SCREW TYPE TIGHTENING TORQUE (Nm)* OK NOT OK
M6 5
M8 11 NOT CHECKED
M10 25
M12 40
M14 60
M16 85
MECHANICAL FITTINGS
SCREW TYPE TIGHTENING TORQUE (Nm)*
M12 95 OK NOT OK
M14 150
M16 235 NOT CHECKED
M18 320
M20 455
M22 615
M24 790
*1Nm=0.1kgm
7. Check the connectivity between the following parts: transformer
cable-earth connection, transformer armatures and metal boxes OK NOT OK
(if applicable).
NOT CHECKED
8. Check the metal enclosure ventilation is not obstructed.
OK NOT OK
9. Check off load tap changer regulation metal plates are in the
right position (same for all 3 coils). OK NOT OK
Notes:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
TMCE-VPCI Rev.07
2/2