The document provides a checklist for correctly installing a transformer. It lists 9 steps to check, including inspecting the transformer for odd parts, ensuring coils are centered and spaced properly, checking minimum safety distances, verifying cables and connections, testing auxiliary components and ventilation, tightening bolts and screws to the proper torque, ensuring proper connectivity of parts, checking ventilation is not obstructed, and verifying tap changer plate positions. The installer is to check off each step and note any issues requiring re-inspection in the notes section before signing off.

Uploaded by

mig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views2 pages

Installation Checklist - EN

The document provides a checklist for correctly installing a transformer. It lists 9 steps to check, including inspecting the transformer for odd parts, ensuring coils are centered and spaced properly, checking minimum safety distances, verifying cables and connections, testing auxiliary components and ventilation, tightening bolts and screws to the proper torque, ensuring proper connectivity of parts, checking ventilation is not obstructed, and verifying tap changer plate positions. The installer is to check off each step and note any issues requiring re-inspection in the notes section before signing off.

Uploaded by

mig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PARTIAL CHECKLIST FOR CORRECT  

TRANSFORMER INSTALLATION

Client: _________________________________ Plate number: _____________

Instalation site: __________________________ Date:_______________

STEPS TO FOLLOW RESULT


1. Check that there are not odd parts on the transformers or
transformation center (e.g. metal pieces, bolts,etc...). OK NOT OK
2. HV & LV coils have to be concentric, with spacing blocks, centered
and firmly fixed. OK NOT OK
3. Check the distances between live transformer parts and feeding
cables / External metal parts (N.B.: casting coils and triangle
connection cables have to be considered live parts):

3.1. Site: Minimum safety distances between transformer


and its site. (See table A for distances).

OK NOT OK

NOT CHECKED

3.2. How to connect: Minimum distance between LV/HV


cables and the surface of the coil. See table B for OK NOT OK
distances.
NOT CHECKED

TMCE-VPCI Rev.07
1/2
PARTIAL CHECKLIST FOR CORRECT  
TRANSFORMER INSTALLATION

STEPS TO FOLLOW RESULT


4. Check that the cables and bars are in good condition and make
sure that nothing is being pressed onto the bars or connection OK NOT OK
isolators.
5. Check that the auxiliary circuits, protection instruments and
ventilation are all correctly installed and working. OK NOT OK
6. Check the tightness of the connection bolts/screws.

ELECTRICAL FITTINGS
SCREW TYPE TIGHTENING TORQUE (Nm)* OK NOT OK
M6 5
M8 11 NOT CHECKED
M10 25
M12 40
M14 60
M16 85

MECHANICAL FITTINGS
SCREW TYPE TIGHTENING TORQUE (Nm)*
M12 95 OK NOT OK
M14 150
M16 235 NOT CHECKED
M18 320
M20 455
M22 615
M24 790
*1Nm=0.1kgm
7. Check the connectivity between the following parts: transformer
cable-earth connection, transformer armatures and metal boxes OK NOT OK
(if applicable).
NOT CHECKED
8. Check the metal enclosure ventilation is not obstructed.
OK NOT OK
9. Check off load tap changer regulation metal plates are in the
right position (same for all 3 coils). OK NOT OK

Note:This document is a SUMMARY of instructions given in the INSTALATION MANUAL


ATTACHED.

Notes:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

CHECK LIST RESULT:


Correct installation Re-check Installation (according to the notes above)

Sign: _______________________________ Company: ________________________________

TMCE-VPCI Rev.07
2/2

You might also like