Building Design 2 Final Examination: Load Schedule
Building Design 2 Final Examination: Load Schedule
2
+3.5 mm THHN Copper 2 x 3.5 mm2 THHN 20mm Diameter
4 7 CONVENIENCE OUTLET @180 VA 1260 50 230 5.48 20 50 2 wire Copper wire uPVC PIPE
45.39
TOTAL CONNECTED LOAD (VA) 10440 DEMAND FACTOR ( DF ), % 76.67 FEEDER PROTECTION
TOTAL LINE CURRENT ( IL ), AMPS 36.30 MOTOR LOAD CONTRIBUTION (AMPS) 6.00 FEEDER CONDUCTOR
\Users\neilmadelo\Desktop\E1.png
\Users\neilmadelo\Desktop\E2.png
\Users\neilmadelo\Desktop\E4.png
3
MANGALINO, KENT ALDWIN ENGR. FELIX C. ALINDADA
BACHELOR OF SCIENCE IN CIVIL ENGINEERING BUILDING DESIGN 2 FINAL EXAMINATION PROFESSOR
4TH YEAR - A-2
New Buncag, Bgy. Mandaragat, Puerto Princesa City