1) Michael Hailu will install field instruments and supporting materials at a sugar factory by the end of June, depending on when necessary materials are supplied. This includes installing pressure and level transmitters, temperature sensors, and terminating cable terminals. 2) Michael provided necessary documents for a revised invoice for awarded indents from another factory, and is now waiting for an L/C opening. 3) Michael is searching for a supplier for diesel generators for AAWASA this week.

Uploaded by

michael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views1 page

Activity List June2018

1) Michael Hailu will install field instruments and supporting materials at a sugar factory by the end of June, depending on when necessary materials are supplied. This includes installing pressure and level transmitters, temperature sensors, and terminating cable terminals. 2) Michael provided necessary documents for a revised invoice for awarded indents from another factory, and is now waiting for an L/C opening. 3) Michael is searching for a supplier for diesel generators for AAWASA this week.

Uploaded by

michael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Activity List – June 2018

Name: Michael Hailu Job Title: Project Engineer

N Activity Expected Collaborating Remark


o Completion Person
Date
Installation of Field Instruments, accessories and supporting materials Depends on Takele tadesse
at OMO #1 sugar factory. the necessary Kemal Refiso
 Installation of field instruments such as pressure and level materials to
transmitters, RTDs and termination of cable terminals at be supplied
junction boxes of all ion-exchange plant units. by METEC
 Installation of RTDs for all heaters.
 Installation of Junction boxes, as well as cable trays, pipes,
1
conduits and other cable ways from field instruments location
to junction box of 5 FFE (falling Film evaporators).
 Installation of control instruments for the pan section
condensers,
 Installation of all cable and instrument supporting equipment
such as cable tray, junction box, conduit, pipes etc. for 3 CVP
and 2 patch pans,
Providing necessary documents for Revised proforma invoice for the Already Nardos,eyerusale
awarded indents bearing and transformers from fincha sugar factory by finished m ,Jene & Francis
2
contacting the supplier. waiting for
L/C opening
Providing technical spec, and Searching a supplier for AAWASA’s This week Nardos &
3
Diesel generators Eyerusalem
4

Please describe any pending task and related reason in general.

1. Still difficult to find a genuine supplier of Diesel generator due to starting system of
the motors and most of them have agent in Ethiopia.
2. Connecting field instruments to junction box in FFE and non-critical pan plants due
to lack of cable.