OM: Allow Standard ATO Items As PTO/Kit Included Components

This document recommends setting two profile options to YES at the site level: "OM: Schedule ATO Item Without BOM" and "OM: Allow Standard ATO Items as PTO/Kit Included Components". It also states to manually progress something.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

OM: Allow Standard ATO Items As PTO/Kit Included Components

This document recommends setting two profile options to YES at the site level: "OM: Schedule ATO Item Without BOM" and "OM: Allow Standard ATO Items as PTO/Kit Included Components". It also states to manually progress something.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Set the below two profile to YES at Site Level

OM: Schedule ATO Item Without BOM


OM: Allow Standard ATO Items as PTO/Kit Included Components
Manually progress