No Worksheet Test Case
1 Create Equipment Record Create Equipment Record
2 Create Service Notification Create Service Notification
3 Create Field Service RRB Create Field Service RRB
4 Create Quote Document Create Quote Document
5 Accept Quote Accept Quote
6 Release Field Service RRB Release Field Service RRB
7 Check Field Service RRB1 Check Field Service RRB1
8 Print Field Serv RRB Outputs1 Print Field Serv RRB Outputs1
9 Create Delivery(KB) Create Delivery(KB)
10 Pick Delivery(KB) Pick Delivery(KB)
11 Pack Delivery(KB) Pack Delivery(KB)
12 Issue Delivery(KB) Issue Delivery(KB)
Test Name
Module
Customer Service Create Equipment Record
Transaction Code Step Name
Description
Used
The objective of this test case is to validate Equipment Record IE08 Step 1
creation using SAP ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite:
Roles: Users
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: IE08
Create Equipment : Initial screen:
Enter the reference Material that the Equipment Record should be
based on:
Material <<<Material_IN>>>
(OR)
User can reference an existing Equipment Record and click /Hit the
Enter
Equipment <<< Equipment Number_IN>>>
Copy Equipment Popup:
Click on " Continue" button located at the bottom of the Popup
Create Equipment : General Data screen:
In the Header section, Update the Equipment Description:
Description: <<< Description _IN>>>
( Note: Description should be uniform and understood by all
relevant Users)
Click on "Enter" Button
Create Equipment : General Data screen:
Select the Organization Tab and make the following entries:
Enter the Company Code under Account Assignment Section
Company Code <<<CompanyCode_IN>>>
Enter the following details under Responsibilities Section:
Planning Plant <<<PlanningPlant_IN>>>
Planner Group <<<PlannerGroup_IN>>>
Main Work Center <<<MainWorkCtr_IN>>>
Plant Associated with the Main Work Centre:
PLANT <<<PLANT_IN>>>
Click on "Enter" Button
Create Equipment : General Data screen:
Select the Partner Data Tab and make the following entries:
Ship-To Party <<<ShipToParty_IN>>>
Sold-To Party <<<SoldToParty_IN>>>
Order Editor <<<OrderEditor_IN>>>
End User <<<EndUser_IN>>>
Create Equipment : General Data screen:
Select the Sales and Distribution Tab and make the following
entries:
Sales Org <<<SalesOrg_IN>>>
Distribution Channel <<<DistributionChannel_IN>>>
DIVISION <<<Division_IN>>>
Sales Office <<<SalesOffice_IN>>>
Create Equipment : General Data screen:
Select the Ser Data Tab and make the following entries:
Enter the Serial Number under General Section
Serial Number<<<SerialNumber_IN>>>
(Ex: REPAIRPUMP)
Create Equipment : General Data screen:
Select the Guarantee Tab and make the following entries:
Warranty Start (Date) <<< WarrantyStartDate_IN>>>
Warranty End (Date) <<< WarrantyEndDate_IN>>>
(This step is Optional)
Create Equipment : General Data screen:
Click on "SAVE" button which is located at the top of the screen
Expected Results
SAP EASY ACCESS screen should be displayed
Create Equipment : Initial screen is displayed
Copy Equipment Popup is opened
Screen is Navigated to Create Equipment: General Data
screen
Data entered is populated without any error
Data entered is populated without any error
Data entered is populated without any error
Data entered is populated without any error
Data entered is populated without any error
Data entered is populated without any error
Equipment Should be Created Successfully.
Success Message will be displayed in the status bar as below:
"Equipment created with the number 1xxxxxxxxxxxx"
Module Test Name
Customer Service CreateService Notification
Description Transaction Step Name
Code Used
The objective of this test case is to Create Service Notification IW56 Step 1
for the relevant Field Service Process and variables using SAP
ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite: Equipment should be created
Roles: Users
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: IW56
Create Service Notification : requests & Claims screen:
In the Header section, Update the Service Notification Description:
Description: <<< Description _IN>>>
( Note: Description should be uniform and understood by all relevant
Users)
Click on "Enter" Button
Create Service Notification : requests & Claims screen:
Select the SPX - Notification Header Tab and make the following entries:
Enter/ Select the Coding reason under Subject Section
Coding <<<Coding_IN>>>
(Note: User can select the Relevant Value from the ValueHelp Button)
Enter the Equipment Number under Reference Object Section
EquipmentNumber <<<EuipmentNumber_IN>>>
(Equipment should be created in the previous step)
Click on "Enter" Button
Warranty Check:
Click on "Continue" button
Create Service Notification : requests & Claims screen:
Click on Partners button which located at the top of the screen
(Note: 5th button from LHS)
Screen is navigated to Create service Request : Partners page:
Validate whether Partner Functions are updated as per the Equipment
Record Used
Create Service Notification : requests & Claims screen:
Select the SPX - Tasks & Causes Tab and Validate the Entries under
Execution Section
Create Service Notification : requests & Claims screen:
Select the SPX - Sales & Location Data Tab and Validate the Entries under
Sales and Distribution Section and Account Assignment Section
Create Service Notification : requests & Claims screen:
Select the SPX Additional Information Tab and make the following entry
under Sales Order Reference :
Sales Order Reference <<<SalesOrderReference_IN>>>
(Value should be N/A)
Create Service Notification : requests & Claims screen:
Click on "SAVE" button which is located at the top of the screen
Expected Results
SAP EASY ACCESS screen should be displayed
Create Service Notification : Requests & Claims screen is displayed
Data entered is populated without any error
Warranty Check Popup should be displayed
The screen should navigate to "Create Service Notification : Requests &
Claims screen" and Validate whether below mentioned Data gets
updated in the screen:
a. Sold To Party
b. Date
c. Serial Number
d. Material
(Note:SAP will use the Equipment Record Number to locate required
Master Data and update the Service Notification.
Including the Serial Number and Material and Partners.)
Screen is navigated to Create service Request : Partners page
Validate whether below mentioned Data gets updated in the screen:
Below mentioned fields are updated with the Values as per the
Equipment Record used
Ship-To Party <<<XXXXXXXX>>>
Sold-To Party <<<XXXXXXXX>>>
Order Editor <<<XXXXXXXX>>>
End User <<<XXXXXXXX>>>
(Note: Partners shown here were taken from the Equipment Record
Number. If they do not exist in the Equipment Record
Number the Service Notification will not be filled. As a minimum these 4
Partner Functions are compulsory)
Below mentioned fields are updated with the Values as per the
Equipment Record used
Main WorkCentre <<<XXXXXXXX>>>
Company Code <<<XXXX>>>
Planner Group <<<XXX/XXXX>>>
Sales Area <<<XXXX/XX/XX>>>
Sales Office <<<XXX>>>
Below mentioned fields are updated with the Values as per the
Equipment Record used
Sales & Distribution Section:
Sales Org. <<<XXXX>>>
Distr. Channel <<<XX>>>
Division<<<XX>>>
Account Assignment Section:
Company Code <<<XXX>>>
Data entered is populated without any error
Service Notification Should be Created Successfully.
Success Message will be displayed in the status bar as below:
"Notification 3XXXXXXXX saved"
Module Test Name
Customer Service Create Field Service RRB
Description Transaction Step Name
Code Used
The objective of this test case is to validate Field Service RRB IW52/IW32 Step 1
Record creation using SAP ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite: Equipment & Service Notification should be created
Roles: Users
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
Step 11
Step 12
Step 13
Step 14
Step 15
Step 16
Step 17
Step 18
Step 19
Step 20
Step 21
Step 22
Step 23
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: IW52
Change Service Notification : requests & Claims screen:
In the Header section, Click on Serv.order Button
( Note: In order to Processes as a Field Service )
Click on "Enter" Button
Create Order Popup Screen:
Validate whether Values are updated as per the Service Notification Used
(Note: These fields are filled from the Service Notification that came from
the Equipment Record)
Create Order Popup Screen:
Click on "Continue" Button
Create Field Service RRB: Central Header :
In the Header section, Validate the Description Field:
Create Field Service RRB: Central Header :
Select Header Data Tab and Validate Sold To Party Field
Create Field Service RRB: Central Header :
Select Header Data Tab and Update the Values for the fields mentioned
below:
(i) Account Indicator <<< AccountIndicator_IN>>
(ii) Billing Form <<<BillingForm_IN>>>
Create Field Service RRB: Central Header :
Select the Header data Tab and Validate the following Fields under Person
Responsible Section:
(i)Planner Group
(ii) Main Work Centre
(iii)Plant Associated with Main Work Centre
Create Field Service RRB: Central Header :
Select the Header data Tab and Validate the following Fields under
Reference Object Section:
(i)Equipment Number
(ii)Serial Number
(iii)Material
(v) Coding Reason under Subject Section
Create Field Service RRB: Central Header :
Select the Header data Tab and Validate the following Fields under First
Operation Section:
(i)Operation
(ii)Work Centre
(iii)Plant
(iv) Control Key
Create Field Service RRB: Central Header
Select Partner Tab and Validate whether Partner Functions are updated
Create Field Service RRB: Central Header
Select Location Tab and Validate the Entries under Sales and Distribution
Section and Account Assignment Section
Create Field Service RRB: Central Header
Select Enhancement Tab and Enter the Product Hierarchy Field under SPX
Custom Fields Section
Product Hierarchy <<< ProductHierarchy_IN>>>
Create Field Service RRB: Central Header
Click on "SAVE" button which is located at the top of the screen
SAP Easy Access Screen:
Enter the T-code: IW52
Change Service Notification : Initial screen
Enter the Notification Number and Click on "ENTER" Button
Change Service Notification : Initial screen:
Verify Notification Status Field
Change Service Notification : Initial screen:
Verify Service Order Field
SAP Easy Access Screen:
Enter the T-code: IW32
Change Order : Initial screen
Enter Service Order Number and Click on "ENTER" Button
Change Field Service RRB XXXXXX: Central Header
Verify System Status Field
Change Field Service RRB XXXXXX: Central Header
Click on "SAVE" button which is located at the top of the screen
Expected Results
SAP EASY ACCESS screen should be displayed
Change Service Notification : Requests & Claims screen is displayed
Create Order Popup should is displayed
Below mentioned fields are updated with the Values as per the Service
Notification used
Order Type<<<XXXX>>> (Ex: ZM01)
Planning Plant <<<XXXX>>>
Main Work Centre<<<XXXXXXXX>>>
Plant <<<XXXX>>>
(Note: If User finds that any of these field are blank, User should update
as required with the relevant data)
Popup will be closed and page is Navigated to Create Field Service RRB:
Central Header screen
Description Field is Validated Successfully
Notification Description <<<XXXXXX>>>
Sold-To Party Field is Validated Successfully
Below mentioned Fields are populated with the Data Entered
(i) Account Indicator
Ex: EQ
(ii) Billing Form
Ex: 01
Below Fields are validated under Header Data Tab Successfully
(i) Planner Group <<<XXX>>>
Ex: 001
(ii) Main Work Centre <<<XXXXXX>>>
Ex:MEPE01SC
(iii)Plant <<<XXXX>>>
Ex: 4850
Below Fields are validated under Header Data Tab Successfully
(i) Equipment Number <<<XXXXXXXXXX>>>
Ex: 1000003836586
(ii) Serial Number <<<XXXXXXXXX>>>
Ex: SUBMERSIBLEPUMP
(iii) Material <<<XXXXXX>>>
Ex: MESNC-2/0 AWG
(v)Coding Reason <<<XX>>>
Ex: 1
Below Fields are validated under Header Data Tab Successfully
(i) Operation<<<XXXXXXXXXX>>>
Ex: REPAIR EXAMPLE
(ii) Work Centre <<<XXXXXXXXX>>>
Ex: MEPE01SC
(iii) Plant <<<XXXX>>>
Ex: 4850
(iv)Control Key <<<XXXX>>>
Ex: SM01
Below Fields are validated under Partner Tab Successfully
Ship-To Party <<<XXXXXXXX>>>
Sold-To Party <<<XXXXXXXX>>>
Order Editor <<<XXXXXXXX>>>
End User <<<XXXXXXXX>>>
(Note: Partners shown here were taken from the Equipment Record
Number. If they do not exist in the Equipment Record
Number the Service Notification will not be filled. As a minimum these 4
Partner Functions are compulsory)
Below mentioned fields are Validated under Location Tab Successfully
Sales & Distribution Section:
Sales Org. <<<XXXX>>>
Distr. Channel <<<XX>>>
Division<<<XX>>>
Account Assignment Section:
Company Code <<<XXX>>>
Data entered is populated without any error
Service Order Should be Created Successfully.
Success Message will be displayed in the status bar as below:
"Order 4065794 saved with notification 300089752"
Change Service Notification : Initial screen is displayed
System is navigated to Change Service Notification : Requests & Claims
screen is displayed
Notification Status is validated Successfully
Service Order Field is updated with Order Number which is created
newly in the previuos step
Change Order : Initial screen is displayed
System is Navigated to Change Field Service RRB XXXXXX: Central
Header
System Status is validated Successfully
Service Order is saved Successfully.
Success Message will be displayed in the status bar as below:
"Order XXXXXXX saved with notification XXXXXXXX"
Module Test Name
Customer Service Create Quote Document
Description Transaction Step Name
Code Used
The objective of this test case is to Create Quote Document for DP80 Step 1
the relevant Field Service Process and variables using SAP ECC
(This is used to determine the Materials that are required in a
Quote based on the Planned OperationWork, External
Processing and Materials entered into the Order)
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite: Service Order should be created
Roles: Users
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
VA22 Step 10
Step 11
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: DP80
Create Quotation: Initial screen:
In the Selection section, Input the Service Order Number
Service Order <<< ServiceOrder _IN>>>
In the Pricing Section, Input Pricing Date
Pricing Date <<<PricingDate_IN>>>
Create Quotation: Initial screen:
Click on "Sales Price View" Button
Create Quotation <new>: Sales Price
Expand Quotation From Service Order by clicking on Expand Button
Create Quotation <new>: Sales Price
Validate Sales Price and Net Value in the table
Create Quotation <new>: Sales Price
If Net Value is not updated ,User should add Price Conditions as below:
(i) User should double Click on the Material Line
(ii)Select Condtions Tab
(iii)Click on "Insert Row" button and add the Respective Condtion as
required by the Process
Create Quotation <new>: Sales Price
Click on "Create Quotation " Button
Create Quotation
Click on "Yes " Button in the popup
Change Quotation : Initial Screen
Enter T-code : VA22
Enter the created Quotation Number and click on Enter Button
Change Quotation from Service Order XXXXXX: Overview
Click on Edit Button and Check for Incompletion Log
Expected Results
SAP EASY ACCESS screen should be displayed
Create Quotation: Initial screen is displayed
Data entered is populated without any error
Screen is navigated to Create Quotation <new>: Sales Price page
Here Materials determined are shown. These should be reviewed for
accuracy of Material Number and Material
Description.
Sales Price & Net Value is validated successfully
(i) The Associated Price Conditions should be present
(ii) Conditions Tab should get highlighted
(iii) Respective Condtions added to the desired material line is
successfully
Ex: Pricing Condtion : PS00
Popup will appear with the option as mentioned as below:
"Do you really want to create the quotation? "
Quotation should be created successfully.
Success message will be displayed in the Status bar as below:
"Qtn from Serv. Order 20227302 has been created"
System should navigate to " Change Quotation from Service Order
XXXXXX: Overview"
A success message " Document is Complete" should be displayed in the
Status Bar
Module Test Name
Customer Service Accept Quote
Description Transaction Step Name
Code Used
The objective of this test case is to Accept the Quote Document IW32 Step 1
for the relevant Field Service Process and variables using SAP
ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite: Quotation should be created
Roles: Users
Step 2
Step 3
Step 4
Step 5
IW32 Step 6
Step 7
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: IW32
Change Order: Initial screen:
Enter the Service Order Number in the Order Input Field
Service Order <<< ServiceOrder _IN>>>
Click on "ENTER" Button
Change Field Service RRB XXXXXXX : Central Header screen:
Validate the System Staus
Change Field Service RRB XXXXXXX : Central Header screen:
Accept the Quotation by navigating to the below mentioned path
Click on Order--> Functions --> Accept Quotation
Click on Accept Quotation
Change Field Service RRB XXXXXXX : Central Header screen:
Enter the T-code: IW32 and the input the Service Order
Change Field Service RRB XXXXXXX : Central Header screen:
Validate the System Staus
Click on "Status Information" Icon in the System Status row and
Validate the Status of Quotation
Expected Results
SAP EASY ACCESS screen should be displayed
Change Order: Initial screen is displayed
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
System Status is validated Successfully
(Note : Make sure system status should be QUCR)
Quotation will be accepted successfully
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
System Status is validated Successfully and now the Status will change to
"QUAC: Quotation Accepted"
Module Test Name
Customer Service Release Field Service RRB
Description Transaction Step Name
Code Used
The objective of this test case is to Release Field Service RRB IW32 Step 1
for the relevant Field Service Process and variables using SAP
ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite: Field Service RRB (Service Order)
Roles: Users
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: IW32
Change Order: Initial screen:
Enter the Service Order Number in the Order Input Field
Service Order <<< ServiceOrder _IN>>>
Click on "ENTER" Button
Change Field Service RRB XXXXXXX : Central Header screen
Click on Release Button
Change Field Service RRB XXXXXXX : Central Header screen:
Click on "SAVE" button
Change Order : Initial Screen:
Enter the Order Number in the Order Input Field and Click on ENTER
button
Change Field Service RRB XXXXXXX : Central Header screen:
Validate the System Status
Click on "Status Information" Icon in the System Status row and
Validate the Status of Release
Change Status:
Click on Back Button
Change Field Service RRB XXXXXXX : Central Header screen:
Click on Costs Button and Validate Planned Costs
Expected Results
SAP EASY ACCESS screen should be displayed
Change Order: Initial screen is displayed
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
Upon Clicking on the Release Button, System will display the success
message in the status bar as below
"Order XXXXXXX will be released after Update"
The Order will be Saved to complete the Release Process
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
Page is navigated to Change Status Screen and System Status is
validated Successfully and now the Status will be REL - Released
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
Planned Costs is validated Successfully
Module Test Name
Customer Service Check Field Service RRB1
Description Transaction Step Name
Code Used
The objective of this test case is to Check Field Service RRB1 IW32 Step 1
for the relevant Field Service Process and variables using SAP
ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite: Field Service RRB (Service Order)
Roles: Users
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: IW32
Change Order: Initial screen:
Enter the Service Order Number in the Order Input Field
Service Order <<< ServiceOrder _IN>>>
Click on "ENTER" Button
Change Field Service RRB XXXXXXX : Central Header screen:
Validate the System Status
Click on "Status Information" Icon in the System Status row and
Validate the Status of Release
Change Status:
Click on Back button
Change Field Service RRB XXXXXXX : Central Header screen:
Click on Document Flow Button and validate the Creation of Purchase
Requisition
Change Field Service RRB XXXXXXX : Central Header screen:
Select Components tab and Select the Material row
Click on "Check Material Availability" button which is located at the
bottom
Expected Results
SAP EASY ACCESS screen should be displayed
Change Order: Initial screen is displayed
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
Page is navigated to Change Status Screen and System Status is
validated Successfully and now the Status will be REL - Released
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
Creation of Purchase Requisition is validated successfully in the
Document Flow
Page is navigated to Confirmation Proposal screen and the Material
Availability is validated successfully
Module Test Name
Customer Service Print Field Serv RRB Outputs1
Description Transaction Step Name
Code Used
The objective of this test case is to Print Field Service RRB IW32 Step 1
Output for the relevant Field Service Process and variables
using SAP ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite: Field Service RRB (Service Order)
Roles: Users
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: IW32
Change Order: Initial screen:
Enter the Service Order Number in the Order Input Field
Service Order <<< ServiceOrder _IN>>>
Click on "ENTER" Button
Change Field Service RRB XXXXXXX : Central Header screen:
Navigate to the Print Order option by following below mentioned path
Navigation Path: Order---> Print ---> Order
Select Shop Papers Screen:
Select the Desired Shop Paper and its relevant Description
Select Shop Papers Screen:
Click on "Print Preview" Button in the Popup
Print Preview of LOCL Page XXXX of XXXX Screen:
Validate the Field Service Order for the details
Print Preview of LOCL Page XXXX of XXXX Screen:
After the Validation, Click on Back Button
Select Shop Papers Screen:
Click on "Print " Button in the Popup
Expected Results
SAP EASY ACCESS screen should be displayed
Change Order: Initial screen is displayed
System is navigated to Change Field Service RRB XXXXXXX : Central
Header screen
A Popup screen will be displayed and the system is navigated to Select
Shop Papers (Popup)
The Selected items should be highlighted successfully
Page is navigated to Print Preview of LOCL Page XXXX of XXXX and Field
Service Order details is displayed
Field Service Order is Validated Successfully in the Print Preview
Page is navigated to "Select Shop Papers" popup
The desired Field Service RRB Output should be printed successfully
Module Test Name
Customer Service Create Delivery(KB)
Description Transaction Step Name
Code Used
The objective of this test case is to Create Outbound Delivery VL01N Step 1
with Order Reference for the relevant Field Service Process and
variables using SAP ECC
(Note: Change Field Service RRB with VA02 – Create
Consignment Fill-Up)
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite:
Roles: Users
VL01N Step 2
Step 3
Step 4
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: VL01N
Create Outbound Delivery with Order Reference screen:
In the Header section, Enter the Shipping point detail
Shipping Point<<< ShippingPoint _IN>>>
In the Sales Order Data Section, Enter the Order Number
Order <<<Order_IN>>>
In the Predefine Delivery Type Section, Enter the Delivery Type
Delivery Type <<<DeliveryType_IN>>>
Create Outbound Delivery with Order Reference screen:
Click on Enter button
Delivery Create: Overview
Select Picking Tab and Click on "SAVE" Button
Expected Results
SAP EASY ACCESS screen should be displayed
System is navigates to Create Outbound Delivery with Order Reference
screen
Data entered is populated without any error
System is navigated to Delivery Create: Overview
Delivery is created and system displays a Success message in the Status
Bar as below:
"Delivery 8XXXXXXX has been saved"
Comments
A Delivery will be created containing the relevant and available Materials
from the Consignment Fill-Up.
Module Test Name
Customer Service Pick Delivery
Description Transaction Step Name
Code Used
The objective of this test case is to Pick Outbound Delivery for VL02N Step 1
the relevant Field Service Process and variables using SAP ECC
(Note: User should update the Delivery after the picking has
been completed)
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite:
Roles: Users
The objective of this test case is to Pick Outbound Delivery for VL02N Step 2
the relevant Field Service Process and variables using SAP ECC
(Note: User should update the Delivery after the picking has
been completed)
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite:
Roles: Users
Step 3
Step 4
Step 5
Step 6
Step 7
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: VL02N
Change Outbound Delivery screen:
In the Outbound Delivery Input , Enter the Delivery number
Delivery <<<Delivery_IN>>>
Click on ENTER Button
Delivery XXXXXXXX Change : Overview Screen:
Select Picking Tab and Validate Picked Quantity
Delivery XXXXXXXX Change : Overview Screen:
Enter the Storage Location from which the material was picked
Storage Location <<<StorageLocation_IN>>>
Delivery XXXXXXXX Change : Overview Screen:
User must Confirm the Picking as is Relevant
Navigate to the below mentioned path and Confirm the Picking order
Edit--->Confirm Pick Order--->All Items
Validate the Items Confirmed
Delivery XXXXXXXX Change : Overview Screen:
Click on SAVE Button in order to save the Delivery
Expected Results
SAP EASY ACCESS screen should be displayed
System is navigates to Change Outbound Delivery screen
System navigates to Delivery XXXXXXXX Change : Overview screen
Picked Quantity is Validated Successfully
Data Entered for Storage Location is populated successfully
Items Confirmed is Validated Successfully
A success message is displayed in the Status bar as below:
"Items Confirmed"
Delivery is saved Successfully and a success message is displayed in the
Status Bar as below:
"Delivery 8XXXXXXX has been saved"
Comments
The delivery will be accessed and the Picked Quantity will be filled by SAP.
User should review and confirm this is correct.
Module Test Name
Customer Service Pack Delivery(KB)
Description Transaction Step Name
Code Used
The objective of this test case is to Pack Outbound Delivery with VL02N Step 1
Order Reference for the relevant Field Service Process and
variables using SAP ECC
(Note: User should update the Delivery after the picking has
been completed)
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite:
Roles: Users
VL02N Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: VL02N
Change Outbound Delivery screen:
In the Outbound Delivery Input , Enter the Delivery number
Delivery <<<Delivery_IN>>>
Click on ENTER Button
Delivery XXXXXXXX Change : Overview Screen:
Select Picking Tab and Update the delivery with Packing Details and Ensure
to Select all the items packed
Delivery XXXXXXXX Change : Overview Screen:
Select the Row under All Items section and click on the Pack button which
is located on the top of the screen
Processing of Handling Units for Outbound Delivery XXXXXXXX screen:
Select the Pack Material Tab and Select the Relevant Packaging Material
in the field from Value Help.
Ex: CARTON
Click on ENTER Button
Processing of Handling Units for Outbound Delivery XXXXXXXX screen:
Select the Pack Material Tab and Enter the Total Weight in the Total
Weight Input Field
Ex: 10
Click on ENTER Button
Processing of Handling Units for Outbound Delivery XXXXXXXX screen:
Select the Rows from both the Sections and Click on PACK Button
Processing of Handling Units for Outbound Delivery XXXXXXXX screen:
Click on SAVE Button in order to save the Delivery
Expected Results
SAP EASY ACCESS screen should be displayed
System is navigates to Change Outbound Delivery screen
System navigates to Delivery XXXXXXXX Change : Overview screen
All the items which are packed are updated with their packing details
Updated Successfully
SAP system will navigate to the Processing of Handling Units for
Outbound Delivery XXXXXXXX screen.
Entered value is populated in the Packaging Material field Successfully
and a number is generated for the Handling Unit
Entered value is populated in the Total Weight field Successfully and a
loading weight is updated with the value automatically .
A message is displayed in the Status Bar as below:
"Handling Unit was Changed"
Material is packed and the a success message is displayed in the Status
Bar as below:
"Material was packed"
Delivery is saved Successfully and a success message is displayed in the
Status Bar as below:
"Delivery 8XXXXXXX has been saved"
Comments
User should update the delivery with the packing details. User should
ensure to select all the Items packed
Module Test Name
Customer Service Issue Delivery(KB)
Description Transaction Step Name
Code Used
The objective of this test case is to Issue Delivery for the VL02N Step 1
relevant Field Service Process and variables using SAP ECC
Data Dependencies: Org Struc should be set up (Company code,
Plant, storage,purch org etc to be set up)
Process Dependency:NA
Other Dependency:
Pre-requisite:
Roles: Users
VL02N Step 2
Step 3
Step 4
Description
SAP Login Screen:
Log onto the SAP Logon using below mentioned credentials
User name <<<User_Name_IN>>>
Password <<<XXXXXXXX_IN>>>
Click on "Enter" button
SAP Easy Access Screen:
Enter the T-code: VL02N
Change Outbound Delivery screen:
In the Outbound Delivery Input , Enter the Delivery number
Delivery <<<Delivery_IN>>>
Click on ENTER Button
Delivery XXXXXXXX Change : Overview Screen:
Complete the Post Goods Issue to make the Confirmation of delivery by
Cliking on "Post Goods Issue" Button which is located on top of the screen
Expected Results
SAP EASY ACCESS screen should be displayed
System is navigates to Change Outbound Delivery screen
System navigates to Delivery XXXXXXXX Change : Overview screen
Post Goods Issue carried out successfully
Comments