0% found this document useful (0 votes)
25 views39 pages

Metodo de Cros Proyecto

The document provides data and calculations for analyzing the moments and shear forces in a structural frame with 6 sections labeled 1 through 6. It includes the distances, reactions, shear forces, bending moments, and other values calculated for each section using the method of sections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views39 pages

Metodo de Cros Proyecto

The document provides data and calculations for analyzing the moments and shear forces in a structural frame with 6 sections labeled 1 through 6. It includes the distances, reactions, shear forces, bending moments, and other values calculated for each section using the method of sections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

MODELO 1 METODO DISTANCIA

W= 21.75 L= 6.99 mts n´1


W= 21.75 L= 7.04 mts n´2
W= 21.75 L= 5.23 mts n´3
n´4
n´5
n´6

REACCIONES MOMENTOS
RA 59.6062155 M1 81.68
RB 174.46421 M2 -114.71
RC 142.516938 M3 40.01
RD 42.32 M4 -76.14
M5 41.2
M6 0

CORTANTES
V1 59.6062155
V2 -92.4262845
V3 82.0379253
V4 -71.0820747
V5 71.43
DISTANCIA
2.74
-4.25
3.77
-3.27
3.28
-1.95
cv 21.75 kn/ m INGRESAR CARGAS
M 63.07 kn/m

6.99 7.04

RIGIDEZ K1 0.1430615 K2 0.1420455

FACTORES DE DISTRIBUCION
FAB 1
FBA 0.50
FBC 0.50
FCB 0.43
FCD 0.57
FDC 1

MOMENTOS D
Rigidez A B
Factores de dristribucion FD 1 0.5017819
momentos iniciales MI -88.55893 88.558931
distribucion de momentos ID 88.558931 0.638
transporte de momentos IT 0.319 44.279466
2.D -0.319 -17.91393
transporte 2 de momentos 2.T -8.956965 -0.1595
3.D 8.9569652 -2.536995
3.T -1.268498 4.4784826
4.D 1.2684976 -2.580817
4.T -1.290409 0.6342488
5.D 1.2904085 -0.82833
5.T -0.414165 0.6452043
6D 0.4141648 -0.508619
E 0 114.70614
MA MB
5.23 2.70
volado

K3 0.191204589

MOMENTOS DE EMPOTRAMIENTO METODO DE CROOS

TRAMO A B

1. 88.55893125 q 21.75
L 6.99

((L36*L37^2)/12)*(6-((8*L37)/L38)+(((3*L37^2)/L38^2)))
2. q 7
a 3.5
L 3.5

MAB 88.55893125

1. 88.55893125 q 21.75
L 6.99

((L45*L46^2)/12)*(((4*L46)/L47)-((3*L46^2)/L47^2))
2. q 7
a 3.5
L 3.5

MBA 88.55893125

TRAMO B C

1. 89.8304 q 21.75
L 7.04

((L69*L70^2)/60)*(10-((10*L70)/L71)+((3*L70^2)/L71^2))
2. q 7
a 3
L 5

MBC 89.8304

TRAMO B C

1. 89.8304 q 21.75
L 7.04

((L69*L70^2)/60)*(10-((10*L70)/L71)+((3*L70^2)/L71^2))
2. q 7
a 3
L 5

MCB 89.8304

TRAMO C D

1. 49.57713125 q 21.75
L 5.23

((L81*L82^2)/12)*(6-((8*L82)/L83)+((3*L82^2)/L83^2))
2. q 7
a 2.5
L 4.5

((L85*L86^2)/12)*(((4*L86)/L87)-((3*L86^2)/L87^2))
3. q 7
a 1.5
L 4.5

MCD 49.57713125

TRAMO D C
1. 49.57713125 q 21.75
L 5.23

((L98*L99^2)/12)*(((4*L99)/L100)-(((3*L99^2)/L100^2)))
2. q 7
a 2.5
L 4.5

((L102*L103^2)/12)*(6-((8*L103)/L104)-((3*L103^2)/L104^2))
3. q 7
a 1.5
L 4.5

MDC 49.57713125

B C
0.49821810406272 0.4262429 0.5737571
-89.8304 89.8304 -49.57713
0.63346875 -17.15767 -23.0956
-8.578834375 0.3167344 -24.78857
-17.786700815217 10.430944 14.040888
5.21547177821924 -8.89335 5.7739
-2.518976673539 1.3296435 1.7898069
0.66482174538686 -1.259488 -3.510222
-2.5624873439085 2.033055 2.7366553
1.01652749228347 -1.281244 -0.447452
-0.8224466227006 0.7368441 0.9918513
0.36842204352415 -0.411223 -0.684164
-0.5050069714549 0.466901 0.6284862
-114.70614099241 76.141547 -76.14155
MB MC
152.0325 KN

114.70614

CP/2= 76.01625 E(M)/L= 16.410034


D
1 0
49.577131 -26.39
-49.57713 0
-11.5478
11.5478 0
7.0204438
-7.020444 0
0.8949035
-0.894903 0
1.3683276
-1.368328 0
0.4959257
-0.495926 0
0 -26.39
MD
REACCION TRAMO A-B REACCION TRAMO B-C
E(MA=0) E(MA=0)
76.01625 76.56

REACCION HIPERESTATICA REACCION HIPERESTATICA


E[M]/L E[M]/L
16.4100344767392 -5.47792528741963

RA RB RB RC
59.606216 92.426284476739 82.037925 71.0820747125804

RA RB RC RD
59.6 174.4642 142.5169 42.32

CORTANTES

CORTANTE N´1 CORTANTE N´2


59.6 -92.4

CORTANTE N´4 CORTANTE N´5


-71.1 71.43

DISTANCIA DE CORTANTES

DISTANCIA CORTANTE N´1 DISTANCIA CORTANTE N´2


2.74 -4.25

DISTANCIA CORTANTE N´4 DISTANCIA CORTANTE N´5


-3.27 3.28

AREAS CORTANTES

AREA N´1 AREA N´2


81.6758834254119 -196.382024417819

AREA N´4 AREA N´5


-116.153134378043 117.308958128085
MOMENTOS

MOMENTO N´1 MOMENTO N´2


81.68 -114.71

MOMENTO N´4 MOMENTO N´5


-76.14 41.2
REACCION TRAMO B-C
E(MA=0)
56.87625

REACCION HIPERESTATICA
E[M]/L
-14.5586131871841

RC RD
71.434863 42.3176368128159

CORTANTE N´3
82.0

CORTANTE N´6
-42.3

DISTANCIA CORTANTE N´3


3.77

DISTANCIA CORTANTE N´6


-1.95

AREA N´3
154.717728401477

AREA N´6
-41.1674111591125
MOMENTO N´3
40.01

MOMENTO N´6
0.0
DATOS MOMENTOS
F'c 21.1 Mpa M1 81.676
FY 420 Mpa M2 114.71
b 0.25 mts M3 40.01
h 0.45 mts M4 76.14
r 0.04 mts M5 41.17
d 0.41 mts M6 0.0E+00
columna 0.3 mts
Ø 0.9 adi
ɣ 0.85 adi
β1 0.85 adi
Es 200000 Mpa

METODO ACI 3

154.98 24018.8
154.98 24018.8
154.98 24018.8
154.98 24018.8
154.98 24018.8

METODO 2 ACI 31
METODO 3

M1 81.67588
K
1210.6 0.003333
1441 0.004
K 1943.507
P 0.005351
AS 5.484596

M2 114.7061
K
2108.2 0.006
2428.5 0.007
K 2729.474
P 0.007768
AS 7.962368

M3 40.01159
K AS= 0.027234
738.2 0.003
1094 0.003
K 952.0901
P 0.003869
AS 3.965967

M4 76.14155
K
3042.4 0.009
3336.1 0.01
K 1811.816
P 0.00536
AS 5.493689

M5 41.2
K
2108.2 0.006
2428.5 0.007
K 979.5934 pmax= 0.016013
P 0.002788
AS 2.857651
CANTIDAD DE ACEROS (MANUAL)
M1 3.98 2#4L=2.50
M1
M3
M4
M5
0.15

0.2

METODO ACI 318-14 "AS"

5783.937 35407.86 0.000563 5.63 cm2


8122.998 35407.86 0.000816 8.16 cm2
2833.45 35407.86 0.000266 2.66 cm2
5392.019 35407.86 0.000522 5.22 cm2
2915.3 35407.86 0.000274 2.74 cm2

METODO 2 ACI 314-18 "HPO" P

0.005495 5.63 cm2


0.007963 8.16 cm2
0.002598 2.66 cm2
0.005097 5.22 cm2
0.002675 2.74 cm2
3.61 2.64

3 N.4 LONG= 3.76 mts

1.1

2 N.5 LONG= 6.59 mts

TABLA DE ACEROS
DESIGNACION DIAMETRO DIMENSIONES NOMINALES MASA
DIMETRO AREA CM² PERIMETRO MM
N°2 1/4" 6.4 0.32 20 0.25
N°3 3/8" 9.5 0.71 30 0.56
N°4 1/2" 12.7 1.29 40 0.994
N°5 5/8" 15.9 1.99 50 1.552
N°6 3/4" 19.1 2.84 60 2.235
N°7 7/8" 22.2 3.87 70 3.042
N°8 1" 25.4 5.1 80 3.973
N°9 1-1/8" 28.7 6.45 90 5.06
N°10 1-1/4" 32.3 8.19 101.3 6.404
N°11 1-3/8" 35.8 10.06 112.5 7.907
N°12 1-3/4" 43 14.52 135.1 11.38
N°14 2-1/4" 57.3 25.81 180.1 20.24

ᵨ a/d j K (KN/M ∆K K2
0.001 0.0234 0.9883 373.6 0.0517
0.002 0.0468 0.9766 738.2 364.6 0.0368
0.003 0.0703 0.9649 1094 355.8 0.0302
0.003333 0.0781 0.9610 1210.6 116.6 0.0287
0.004 0.0937 0.9532 1441 230.4 0.0263
0.005 0.1171 0.9415 1779 338.0 0.0237
0.006 0.1405 0.9298 2108.2 329.2 0.0218
0.007 0.1639 0.9181 2428.5 320.3 0.0203
0.008 0.1873 0.9064 2739.9 311.4 0.0191
0.009 0.2108 0.8946 3042.4 302.5 0.0181
0.01 0.2342 0.8829 3336.1 293.7 0.0173
0.011 0.2576 0.8712 3620.8 284.7 0.0166
0.012 0.2810 0.8595 3896.7 275.9 0.0160
0.013 0.3044 0.8478 4163.8 267.1 0.0155
0.01362 0.3190 0.8405 4324.9 161.1 0.0152
2.64 2.77 2.52

2 N. LONG= 7.60 mts 3 N. 4 LONG=

5.40 mts 1.1

2.92 mts
0.15 0.15
2.79 2 N.5 LONG=
2.52 1.75 2.67

3 N. 4 LONG= 2.52 mts 3 N.6 LONG= 4.42


1 N.4 LONG= 6.62
1.1

0.7

6.14 mts
3 N.4 LONG= 5.82
2.67 2.56

1 N. 5
mts 2 N.4= LONG 2.71 mts
mts
1.1

0.7

3 N.5 LONG= 3.46 mts


mts
0.15

0.2
|

CALCULO DE ESTRIBOS TRAMO AB CUANDO (VU<ØVC)

CALCULO DE ESTRIB0S TRIANGULO 1


FC 21.1 MPA
L VIGA 6.99 M
L CORTANTE 0.21 M
WU 21.75 KN/M
V MAX 59.6 KN
H 0.4 M
B 0.25 M
VU 47.64 KN
ØVC 0.0512 MN
L 0.18 M
ØVC/2 25.62 KN
LF 0.09 M
LMX -0.03 M
LBJ -0.03 M
S 0.175 M
NFLEJES 0.8 UN
LBJ 0 M
LMN 0.06 M
S 30.56 CM
S 30.72 CM
S=B 0.25 M
N FLEJES 0.2 1

CALCULO DE ESTRIBOS TRAMO AB CUANDO (VU<ØVC)

CALCULO DE ESTRIB0S TRIANGULO 2


FC 21.1 MPA
L VIGA 6.99 M
L CORTANTE 4.25 M
WU 21.75 KN/M
V MAX 92.4 KN
H 0.45 M
B 0.25 M
VU 79.38 KN

ØVC 0.0586 MN
L 2.69 M
ØVC/2 29.28 KN
LF 1.35 M
LMX 2.75 M
LBJ 2.75 M
S 0.200 M
NFLEJES 14.8 UN
LBJ 2.8 M
LMN 1.30 M
S 30.56 CM
S 30.72 CM
S=B 0.25 M
N FLEJES 4.3316144792 5
TRIBOS TRAMO AB CUANDO (VU<ØVC) CALCULO
251.2055892
O DE ESTRIB0S TRIANGULO 1 C
Fy 420 FC
D 0.35 L VIGA
L CORTANTE
Ø 0.75 WU
VMAX 0.251205589203097 V MAX
COLUMNA 0.3 H
B
VU
51.2 KN ØVC
LVU
ØVC/2
CUMPLE LMX
V
LMIN
0.170 0.0 LBJ
1 UN L
2#2@22CM LMD
V
30 LMD2
2#2@30CM S OPCION A
S OPCION B
UND S OPCION C
NO DE FLEJES
11#2@8CM
LMX
LMD OPCION A
LMD OPCION A
LMD OPCION A
NO DE FLEJES
9#2@9CM
LMD
LMD2 OPCION A
LMD2 OPCION B
LMD2 OPCION C
NO DE FLEJES
5#2@19CM
LMD2

TRIBOS TRAMO AB CUANDO (VU<ØVC) CALCULO


287.09210195
O DE ESTRIB0S TRIANGULO 2 C
Fy 420 FC
D 0.4 L VIGA
L CORTANTE
Ø 0.75 WU
VMAX 0.287092101946396 V MAX
COLUMNA 0.3 H
B
VU

58.6 KN ØVC
LVU
ØVC/2
NO CUMPLE LMX
V
LMIN
0.200 14.0 LBJ
15 UN L
5#2@22CM LMD
V
30 LMD2
2#2@30CM S OPCION A
S OPCION B
UND S OPCION C
NO DE FLEJES
11#2@8CM
LMX
LMD OPCION A
LMD OPCION A
LMD OPCION A
NO DE FLEJES
9#2@9CM
LMD
LMD2 OPCION A
LMD2 OPCION B
LMD2 OPCION C
NO DE FLEJES
5#2@19CM
LMD2
CALCULO DE ESTRIBOS TRAM0 AB CUANDO (VU>ØVC)

CALCULO DE ESTRIB0S TRIANGULO 1


21.1 MPA FY 420 420000
6.99 M D 0.41
2.74 AV 3.2E-05
21.75 KN/M Ø 0.75
REVISION
59.6 KN VMAX 0.294269404495056 294.2694045
0.45 M COLUMNA 0.3
0.25 M EJE COLUMNA 0.15
SEGUN LA NSR-10 LA SE
46.34 KN
MAXIMA ENTRE FLEJES
0.06003 MN 60.03 KN
IGUAL :
0.61 M 1
30.02 KN
0.85 M NO CUMPLE S
37.86 M LMX
1.4 M LMD
1.38 UN LMD2
0.5
-0.5 M UN
SI UNA NO CUMPLE SE DEBE RE
48.94 FLEJES CON SU LONG
-0.51 M
-60.37 CM -60 CM LMD2
37.75 CM 37.00 CM N0 DE FLEJES
20.5 CM 20 CM 6#2@14CM
-0.416666667 UN -1 LMD2
LBJ OPCION A
1.2 M LBJ OPCION C
-37.275 M -37 CM LBJ
37.75 CM 37 NO DE FLEJES
20.5 CM 20 5#2@26CM
1.3777410993 CM 2 LBJ
LMN
-0.74 S
-74.54968026 -74 S
37.75 37 S=B
20.5 20
0.6888705497 1 UND

-0.74 M

CALCULO DE ESTRIBOS TRAM0 BA CUANDO (VU>ØVC)

CALCULO DE ESTRIB0S TRIANGULO 2


21.1 MPA FY 420 420000
6.99 M D 0.41
4.25 AV 3.2E-05
21.75 KN/M Ø 0.75
REVISION
92.4 KN VMAX 0.294269404495056 294.2694045
0.45 M COLUMNA 0.3
0.25 M EJE COLUMNA 0.15

SEGUN LA NSR-10 LA SE
MAXIMA ENTRE FLEJES
IGUAL :
79.16 KN SEGUN LA NSR-10 LA SE
MAXIMA ENTRE FLEJES
0.06003 MN 60.03 KN IGUAL :
0.61 M 1
30.02 KN
0.85 M CUMPLE S
70.68 M LMX
1.4 M LMD
1.38 UN LMD2
1.2
0.2 M UN
SI UNA NO CUMPLE SE DEBE R
65.35 LOS FLEJES CON SU LON
0.24 M
43.21 CM 43 CM LMD2
37.75 CM 37.00 CM N0 DE FLEJES
20.5 CM 20 CM 6#2@14CM
2.976744186 UN 3 LMD2
LBJ OPCION
0.86 M LBJ OPCION
77.645 M 77 CM LBJ
37.75 CM 37 NO DE FLEJE
20.5 CM 20 5#2@26CM
0.3178183597 CM 1 LBJ
LMN
0.77 S
155.29068873 155 S
37.75 37 S=B
20.5 20
0.1578839594 1 UND

1.55 M
REVISION

SEGUN LA NSR-10 LA SEPARCAION


MAXIMA ENTRE FLEJES DEBE SER
IGUAL :

30.72 30 cm
-60.00 CM
-37 CM
-74 CM

SI UNA NO CUMPLE SE DEBE RECALCULAR LOS


FLEJES CON SU LONGTUD TAB
DESIGNACION

-0.51 N°2
-1.699 -2 UND N°3
N°4
-60.000 CM N°5
0.00 N°6
20.50 20 CM N°7
1.38 N°8
6.900 7 UND N°9
N°10
1.4 N°11
1.35 N°12
45.920 45 CM N°14
30.72 30 CM
0.25 25 CM

REVISION

SEGUN LA NSR-10 LA SEPARCAION


MAXIMA ENTRE FLEJES DEBE SER
IGUAL :
SEGUN LA NSR-10 LA SEPARCAION
MAXIMA ENTRE FLEJES DEBE SER
IGUAL :

30.72 30 cm
43.00 CM
77 CM
155 CM

SI UNA NO CUMPLE SE DEBE RECALCULAR


LOS FLEJES CON SU LONGTUD

0.24
0.816 1 UND

30.000 CM
0.00
20.50 20 CM
1.38
6.900 7 UND

1.4
0.45
45.920 45 CM
30.72 30 CM
0.25 25 CM
TABLA DE ACEROS
DIAMETRO DIMENSIONES NOMINALES
MASA
DIMETRO EN MM AREA CM² PERIMETRO MM
1/4" 6.4 0.32 20 0.25
3/8" 9.5 0.71 30 0.56
1/2" 12.7 1.29 40 0.994
5/8" 15.9 1.99 50 1.552
3/4" 19.1 2.84 60 2.235
7/8" 22.2 3.87 70 3.042
1" 25.4 5.1 80 3.973
1-1/8" 28.7 6.45 90 5.06
1-1/4" 32.3 8.19 101.3 6.404
1-3/8" 35.8 10.06 112.5 7.907
1-3/4" 43 14.52 135.1 11.38
2-1/4" 57.3 25.81 180.1 20.24

You might also like