TRIBUTARY AREA FOR 2ND FLOOR (DEAD LOAD) SUPPORTED DEAD LOAD (EXCLUDING AT OF SLAB) = 3.
0 Kpa , SLAB THICKNESS,
h=150 mm
D.L SLAB = (23.6) (0.150) =3.54 kPa
UNIFORMED FLOOR PRESSURE
= 3.54 + 3 = 6.54 kPa
6.54 (5.3)
SLAB1 = =11.554 KN /m
3
TRIBUTARY AREA FOR ROOF DECK (DEAD LOAD) SUPPORTED DEAD LOAD (EXCLUDING AT OF SLAB) = 3.0 kPa, SLAB THICKNESS,
h=150 mm
D.L SLAB = (23.6) (0.150) =3.54 kPa
UNFORMED FLOOR PRESSURE
= 3.54 + 3 = 6.54 kPa
6.54 (5.3)
SLAB1 = =11.554 KN /m
3
COMPUTATION OF DEAD LOAD SECOND FRAME 2 FRAME 3
FLOOR
ALONG 5m. LENGTH ALONG 5m. LENGTH
FRAME 1
SLAB = 11.554 KN/m SLAB = 11.554 + 11.554 = 23.11 KN/m
ALONG 5m. LENGTH
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
SLAB = 11.554 KN/m
TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 25.94 KN/m
2
WALL GLASS =1KN/m (3) = 3 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m ALONG 5m. LENGTH ALONG 5m. LENGTH
TOTAL LOAD = 17.38 KN/m SLAB = 11.554 KN/m SLAB = 11.554 + 11.554 = 23.11 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
ALONG 5m. LENGTH TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 25.94 KN/m
SLAB = 11.554 KN/m
WALL GLASS =1KN/m 2(3) = 3 KN/m ALONG 5m. LENGTH ALONG 5m. LENGTH
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m SLAB = 11.554 KN/m SLAB = 11.554 + 11.554 = 23.11 KN/m
TOTAL LOAD = 17.38 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 25.94 KN/m
ALONG 5m. LENGTH
SLAB = 11.554 KN/m
CHB WALL = 4.2KN/m 2(3) = 12.6 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 26.98 KN/m
FRAME 4 ALONG 5. LENGTH BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
ALONG 5m. LENGTH SLAB = 11.554 KN/m TOTAL LOAD = 17.38 KN/m
SLAB = 11.554 + 11.554 = 23.11 KN/m WALL GLASS =1 KN/m 2(3) = 3 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m ALONG 5m. LENGTH
TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 17.38 KN/m SLAB = 11.554 KN/m
WALL GLASS =1KN/m 2(3) = 3 KN/m
ALONG 5m. LENGTH
ALONG 5m. LENGTH BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
SLAB = 11.554 + 11.554 = 23.11 KN/m
SLAB = 11.554 KN/m TOTAL LOAD = 17.38 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
WALL GLASS =1 KN/m 2(3) = 3 KN/m
TOTAL LOAD = 25.94 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m ALONG 5m. LENGTH
TOTAL LOAD = 17.38 KN/m SLAB = 11.554 KN/m
ALONG 5m. LENGTH
WALL GLASS =1KN/m 2(3) = 3 KN/m
SLAB = 11.554 + 11.554 = 23.11 KN/m
FRAME A BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
ALONG 5m. LENGTH TOTAL LOAD = 17.38 KN/m
TOTAL LOAD = 25.94 KN/m
SLAB = 11.554 KN/m
WALL GLASS =1KN/m 2(3) = 3 KN/m FRAME B
FRAME 5
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m ALONG 5m. LENGTH
ALONG 5m. LENGTH
TOTAL LOAD = 17.38 KN/m SLAB = 11.554+11.554 = 23.11 KN/m
SLAB = 11.554 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
WALL GLASS =1KN/m 2(3) = 3 KN/m
ALONG 5m. LENGTH TOTAL LOAD = 25.94 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
SLAB = 11.554 KN/m
TOTAL LOAD = 17.38 KN/m
WALL GLASS =1KN/m 2(3) = 3 KN/m ALONG 5m. LENGTH
SLAB = 11.554 +11.554 = 23.11 KN/m TOTAL LOAD = 25.94 KN/m CHB WALL = 4.2 KN/m 2(3) = 12.6 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 25.94 KN/m ALONG 5m. LENGTH TOTAL LOAD = 26.98 KN/m
SLAB = 11.554+11.554 = 23.11 KN/m ALONG 5m. LENGTH
ALONG 5m. LENGTH BEAM = 23.6 (0.4) (0.3) =2.83 KN/m SLAB = 11.554 KN/m
SLAB = 11.554+11.554 = 23.11 KN/m TOTAL LOAD = 25.94 KN/m
CHB WALL = 4.2KN/m 2(3) = 12.6 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 25.94 KN/m ALONG 5m. LENGTH
TOTAL LOAD = 26.98 KN/m
SLAB = 11.554 +11.554 = 23.11 KN/m
ALONG 5m. LENGTH BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
ALONG 5m. LENGTH
SLAB = 11.554 +11.554 = 23.11 KN/m TOTAL LOAD = 25.94 KN/m
SLAB = 11.554 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
WALL GLASS =1KN/m 2(3) = 3 KN/m
TOTAL LOAD = 25.94 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
FRAME D
TOTAL LOAD = 17.38 KN/m
FRAME C ALONG 5m. LENGTH
ALONG 5m. LENGTH SLAB = 11.554 KN/m
SLAB = 11.554+11.554 = 23.11 KN/m CHB WALL = 4.2 KN/m 2(3) = 12.6 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 26.98 KN/m
ALONG 5m. LENGTH ALONG 5m. LENGTH
SLAB = 11.554 +11.554 = 23.11 KN/m SLAB = 11.554 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
PARAPET = 4.2 (1) = 4.2 KN/m ALONG 5m. LENGTH
PLASTERING = 0.5 (1) = 0.5 KN/m SLAB = 11.554+11.554 = 23.11 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 19.09 KN/m TOTAL LOAD = 25.94 KN/m
ROOF DECK
FRAME 1 FRAME 2
ALONG 5m. LENGTH ALONG 5m. LENGTH ALONG 5m. LENGTH
SLAB = 11.554 KN/m SLAB = 11.554+11.554 = 23.11 KN/m SLAB = 11.554 +11.554 = 23.11 KN/m
PARAPET = 4.2 (1) = 4.2 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
PLASTERING = 0.5 (1) = 0.5 KN/m TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 25.94 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 19.09 KN/m ALONG 5m. LENGTH ALONG 5m. LENGTH
SLAB = 11.554 +11.554 = 23.11 KN/m SLAB = 11.554+11.554 = 23.11 KN/m
ALONG 5m. LENGTH BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
SLAB = 11.554 KN/m TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 25.94 KN/m
PARAPET = 4.2 (1) = 4.2 KN/m
PLASTERING = 0.5 (1) = 0.5 KN/m ALONG 5m. LENGTH FRAME 4
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m SLAB = 11.554+11.554 = 23.11 KN/m ALONG 5m. LENGTH
TOTAL LOAD = 19.09 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m SLAB = 11.554+11.554 = 23.11 KN/m
TOTAL LOAD = 25.94 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
ALONG 5m. LENGTH TOTAL LOAD = 25.94 KN/m
SLAB = 11.554 KN/m FRAME 3
ALONG 5m. LENGTH BEAM = 23.6 (0.4) (0.3) =2.83 KN/m TOTAL LOAD = 19.09 KN/m
SLAB = 11.554 +11.554 = 23.11 KN/m TOTAL LOAD = 19.09 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 25.94 KN/m
ALONG 5m. LENGTH ALONG 5m. LENGTH FRAME B
SLAB = 11.554+11.554 = 23.11 KN/m SLAB = 11.554 KN/m ALONG 5m. LENGTH
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m PARAPET = 4.2 (1) = 4.2 KN/m SLAB = 11.554+11.554 = 23.11 KN/m
TOTAL LOAD = 25.94 KN/m PLASTERING = 0.5 (1) = 0.5 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m TOTAL LOAD = 25.94 KN/m
FRAME 5 TOTAL LOAD = 19.09 KN/m
ALONG 5m. LENGTH ALONG 5m. LENGTH
SLAB = 11.554 KN/m ALONG 5m. LENGTH SLAB = 11.554 +11.554 = 23.11 KN/m
PARAPET = 4.2 (1) = 4.2 KN/m SLAB = 11.554 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
PLASTERING = 0.5 (1) = 0.5 KN/m PARAPET = 4.2 (1) = 4.2 KN/m TOTAL LOAD = 25.94 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m PLASTERING = 0.5 (1) = 0.5 KN/m
TOTAL LOAD = 19.09 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m ALONG 5m. LENGTH
TOTAL LOAD = 19.09 KN/m SLAB = 11.554+11.554 = 23.11 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
FRAME A ALONG 5m. LENGTH TOTAL LOAD = 25.94 KN/m
ALONG 5m. LENGTH SLAB = 11.554 KN/m
SLAB = 11.554 KN/m PARAPET = 4.2 (1) = 4.2 KN/m ALONG 5m. LENGTH
PARAPET = 4.2 (1) = 4.2 KN/m PLASTERING = 0.5 (1) = 0.5 KN/m SLAB = 11.554+11.554 = 23.11 KN/m
PLASTERING = 0.5 (1) = 0.5 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 25.94 KN/m TOTAL LOAD = 25.94 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
TOTAL LOAD = 19.09 KN/m
FRAME C FRAME D
ALONG 5m. LENGTH ALONG 5m. LENGTH ALONG 5m. LENGTH
SLAB = 11.554+11.554 = 23.11 KN/m SLAB = 11.554 KN/m SLAB = 11.554 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m PARAPET = 4.2 (1) = 4.2 KN/m PARAPET = 4.2 (1) = 4.2 KN/m
TOTAL LOAD = 25.94 KN/m PLASTERING = 0.5 (1) = 0.5 KN/m PLASTERING = 0.5 (1) = 0.5 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
ALONG 5m. LENGTH TOTAL LOAD = 19.09 KN/m TOTAL LOAD = 19.09 KN/m
SLAB = 11.554 +11.554 = 23.11 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m ALONG 5m. LENGTH
TOTAL LOAD = 25.94 KN/m SLAB = 11.554 KN/m
PARAPET = 4.2 (1) = 4.2 KN/m
ALONG 5m. LENGTH PLASTERING = 0.5 (1) = 0.5 KN/m
SLAB = 11.554+11.554 = 23.11 KN/m BEAM = 23.6 (0.4) (0.3) =2.83 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m TOTAL LOAD = 19.09 KN/m
TOTAL LOAD = 25.94 KN/m
ALONG 5m. LENGTH
ALONG 5m. LENGTH SLAB = 11.554 KN/m
SLAB = 11.554+11.554 = 23.11 KN/m PARAPET = 4.2 (1) = 4.2 KN/m
BEAM = 23.6 (0.4) (0.3) =2.83 KN/m PLASTERING = 0.5 (1) = 0.5 KN/m