MD Lithology Casing/Hole Bit
ZONES 01 DRILLING SUMMARY
Mud Cement BHA Obj BHA Logs Offset wells (RCH 2-3) Risks Considerations
PDC Two slurries:
0
75 (Casing bit) 30% of excess
150 DEFYER TOC: surface BIT 17.5"/ 22" Hole, 355'/365' TVD-
225 Kill mud and
300 DP A4419 12 1/4" Tricone (0-90 ft)- Casing 13.375"/16" :
cement available
375 Nozzle: Lead : 17 1/2" PDC (0-150 ft) Drilled w/ 9.4/9.5 ppg no losses.
450 17'' Loss circulation in case of loss
525 3 x18+ 3x 13.2 ppg-1200 ft BS with float Cemented w/15.6/15.8 ppg,
1800' SPUD Gas kick circulation or kick
600 16 Volume: 193 bbl 3 x 8” DC returned to surface.
675 TVD/MD MUD Bit balling
750 TFA: 1.335 Tail: Maintain verticality XO
8.8-9.0 Cellar breaking Casing drilling to
825 in2 15.8 ppg-590 ft 2 x 5" HWDP No logs
900 ppg Flowline plug increase annular
Volume: 107 bbl planned 12.25"/13.75" Hole, 2130'/2012' Casing set in a
975 13-3/8” velocity.
1050 GPM: 350- TVD-Casing 9.625"/10.75":
1125 Castilletes K-55 sand formation
SUP- 3384 MD 500 Displacement Drilled w/ 9.2/10.3 ppg no
1200 54.5# 17" Casing Bit Can be cemented
1275 RPM: 40-80 volume: 271 bbl losses.
521 HYD 13 3/8" K-55 521HYD casing whereever is set.
1350 WOB (klbs): Full circulation during cement,
1425 13 3/8" double valve float collar Top cement
1500 5-8 1 jts of shoe track max 15 bbl of cement on
13 3/8" K-55 521HYD casing possibility.
1575
1650 surface.
1725
1800 KOP@ 2100' MD
2032
12 1/4" Bit PDC (Used) FIT:13 ppg EMW
2264 FXD56R Cement job: Full circulation on Formation
2496 Build Angle from Geo Pilot 9600 -9 5/8" (Gauge 12 1/8")
PDC (Used) both. tendecy
2728 2100' to 4905' Btm sleeve Stabilizer 12.188" Overdrive system
2960 IADC: M224 Slurry-15.8 ppg LWD (high dip)
3192 (DLS: 2°ー/100ft) 8" (PM+DGR+EWR-P4 Collar) Soft directional
12 1/4" Nozzle: 40% of excess 8” ILS Stabilizer (Gauge12”) GR on bit RCH-002 Hole cleaning
3424 plan
3656 Intra 5742’ 7x18/32" (7598ft-4500ft) 8” (PWD+HCIM Collar+ 8” SHOC+NMDC) Resistivity 8.75" Hole, 6350' TVD- Casing Shaker overload
Castilletes Hold angle 8" Float Sub
(max DLS 2.1)
3888
3384 -4796 MD TVD TFA:1.739 BORE TOC: 4500ft PWD 5 1/2": Unable to comply
4120 (56.09°) from 8”x12 1/4” Omni Reamer (Gauge 12 1/8”) X-
4352 7598’ MD in2 MAX MWD - Drilling breaks @5280 ft, 5405 directional plan
4905' to 6363' Over Sub (Pin 6 5/8” x Box 4 ½” XH) Drill +-100 ft for
4584 9.0-10.5 Displacement 6 ½” Drill Collar ft followed by the kick. Kick Turbidite kicks
4816 ensure omni
5048
9-5/8” GPM: 700- ppg volume: 563 bbl X-Over Sub (Pin 4½”XH x Box 4 ½” IF) 6x5” *Posibility for circulated out & MW increased f/ Casing don’t get
Continue reamer shoe
5280 43.5#, 800 HWDP ADR. 9.2 to 11 ppg. bottom
5512 Jimol Build/Turn from 60x5” DP
L80, TSH- RPM: 50- 2 jts of shoe track Shale instability
5744 6363' to 7598' 20x5” HWDP * Posibility of ADR
5976 BLUE 140 - Drilled to 6102 ft and another Drill into limestone
6208 (DLS: 2°ー/100ft) 6 ½” Drilling Jar to identify
WOB (klbs): drilling break that point. Hole and have total
6440 2x5” HWDP overburden shale
6672 5-20 6 ½” Accelerator packed off and circulation lost. loss circualtion
6904 Shale Zone
Max inclination: dip.
7136 6528'-7586' MD 80.75°
3x5” HWDP Worked up & down pipe got
7368 5” DP to surface free.
7589
7629
FXD65R 8-1/2” BIT
7669 PDC (Used) LWD:
7600 Geopilot(Gauge 8.438”) Drill +-120 ft for
7709
8- 1/2" IADC: M423 ADR RCH-003
6 ¾” (DGR+PWD+ ADR+HCIM Collar)
7749 GR on the Bit ensure omni
7789 5919' Nozzles: 6 x 6 ¾” ILS Stabilizer (Gauge 8 ¼”) 9.875" Hole, 5914' TVD/ 6427'
7829 6 ¾” (SHOC+NMDC Collar)
Resistivity reamer shoe
TVD 16/32" PWD MD- Casing 7":
7869 Hold angle 6-Point String Reamer (Gauge 8 3/8”) Gas kick
7909 8549’ MD TFA: 1.178 MWD - After swivel repair, kick
BARA (80.75°) 6 ¾” Float Sub Lost circulation LCM availability
7949
Ballena in2 Wireline: happened. Circulated kick thru
7989 DRILL N 5 ½ in pre- from 7598' to 1x5” HWDP Unsuccessful log Drop angle to
8029 Limestone 5 1/2”, PEX choke with 250 psi. MW
8.6-8.8 perforated liner 8109' 6 ½” NHD Jar operation hold the trajectory
8069 17#, P110 GPM: 350- (Neutr-GR-Res- increase from 10 ppg to 11.2
8109 ppg will NOT be 3x5” HWDP Unable to comply parallel to the dip
8149
Pre- 570 57x5” DP
Den) ppg @5957 ft.
cemented. Drop Angle ECS
directional plan-
8189 perforated RPM: 80- 20x5” HWDP
8229 from 8109' to (Spectroscopy) - Drilled w/ 11.4 ppg w/out Geological 7" Casing
3/4", 180 130 6 ½” Drilling Jar
8269 8549' DSI (Sonic) losses. Sidetrack contingency
8309 holes/ft WOB (klbs): 2x5” HWDP
8349 (DLS: 2°ー/100ft) *Open hole
Length: 10-20 6 ½” Accelerator
8389
10x5” HWDP
logs run w/ TLC ADR to comply
8429 950 ft * Max desviation 24°.
8469 5” DP to surface directional plan
8509
8549