COMPLETION FORM
DATE 31 MARCH 2020
CUSTOMER COMPANY ZEYA & ASSOCIATES CO.,LTD
CUSTOMER ADDRESS BUILDING No.5, JUNCTION SQUARE, KAMAYUT, YANGON
OWNER SWEETY HOME FURNITURE
CORNER OF 51St X SAN PYAst, PYIGYITAGON TOWNSHIP,
OWNER ADDRESS
MANDALAY
ACKNOWLEDGEMENT
ITEMS HANDED OVER
QTY NAME DESIGNATION SIGNATURE
TESTING AND COMMISSIONING
1
REPORT
SIGNATURE & STAMP
Warranty:
- Warranty of these attach units will commence from date of Completion of Commissioning
( 31 MARCH 2020 ).
DAIKIN MALAYSIA SDN. BHD. (MYANMAR BRANCH)
(Co. Reg. No 112531-W)
# 151, Yawgi Kyaung Street, 11 Ward, Hlaing Township, Yangon, Myanmar.
Off Tel: + 95 1 519 661 / 662 Cool Line: + 95 9 25345 2534 (Sales & Service) Web: www.daikin.com.my
TESTING AND COMMISSIONING REPORT
SWEETY HOME FURNITURE
CORNER OF 51st X SAN PYAst, PYIGYITAGON TOWNSHIP
MANDALAY, MYANMAR
LOCATION EQUIPMENT COMMISSIONING
NO. OF FCU NO. OF CU
INSTALLED DATE
GROUND FLOOR VRV A 10 3 31 MARCH 2020
ENGINEER: SOE YU
DAIKIN MALAYSIA SDN. BHD. (MYANMAR BRANCH)
(Co. Reg. No 112531-W)
# 151, Yawgi Kyaung Street, 11 Ward, Hlaing Township, Yangon, Myanmar.
Off Tel: + 95 1 519 661 / 662 Cool Line: + 95 9 25345 2534 (Sales & Service) Web: www.daikin.com.my
STANDARD OPERATING PROCEDURE FOR UNIT OPERATION STARTUP
1. Check the CU location, condenser coil condition & piping installation.
2. Check the power supply wire connection & sizes, isolator and breaker sizes.
3. Check communication wire installation and connections.
4. Tighten screws in power supply terminal in CU units, isolator and communication terminal.
5. Check power supply sequence & voltage and be sure compressor heat up.
6. Check and charge additional gas for pipe line.
7. Start-up unit operation.
Remarks:
- Vacuumed piping about 2 hours, charged in additional of R410a gas 18kg for
Ground floor, RXQ16+14+14AYM (E001021, E001409, E001410)
Recommendation:
After unit start-up, please ensure that the following tasks to be checked regularly in order for
unit to perform at its best.
1) Power supply voltage to be standard (380 ~ 415 V).
2) Units are required to do regular maintenance.
(a) Screw loose or not in terminals and units.
(b) Condenser fins, evaporator fins and filter are always kept clean.
(c) Unit vibration and noise.
(d) Check & record of operation data.
DAIKIN MALAYSIA SDN. BHD. (MYANMAR BRANCH)
(Co. Reg. No 112531-W)
# 151, Yawgi Kyaung Street, 11 Ward, Hlaing Township, Yangon, Myanmar.
Off Tel: + 95 1 519 661 / 662 Cool Line: + 95 9 25345 2534 (Sales & Service) Web: www.daikin.com.my
Equipment List of Sweety Home Furniture
No Location Unit Type Unit Model Unit Serial
1 Wall Mounted FXAQ25PVE E048162
2 Ceiling Cassette FXFQ125AVM E011980
3 Ceiling Cassette FXFQ125AVM E011981
4 Ceiling Cassette FXFQ125AVM E011982
5 Ceiling Cassette FXFQ125AVM E011520
6 Ground floor Ceiling Cassette FXFQ125AVM E011521
7 Ceiling Cassette FXFQ125AVM E011979
8 Ceiling Cassette FXFQ125AVM E011983
9 Ceiling Cassette FXFQ125AVM E011984
10 Ceiling Cassette FXFQ125AVM E011985
Outdoor Units RXQ16+14+14AYM E001021+E001409+E001410
DAIKIN MALAYSIA SDN. BHD. (MYANMAR BRANCH)
(Co. Reg. No 112531-W)
# 151, Yawgi Kyaung Street, 11 Ward, Hlaing Township, Yangon, Myanmar.
Off Tel: + 95 1 519 661 / 662 Cool Line: + 95 9 25345 2534 (Sales & Service) Web: www.daikin.com.my