0% found this document useful (0 votes)
160 views18 pages

Condition Inspection Form (Cif) B01818LZ

The document summarizes a bridge condition inspection report for the Sucat Interchange (EB) bridge located in Muntinlupa City, Philippines. It was last inspected on October 21, 2015. [The bridge was given an overall condition rating of "Good" and the recommended action was for "Routine maintenance only."] The estimated remaining life of the bridge is 40 years and the estimated cost for routine maintenance for the next budget year is 90,000 Philippine Pesos, which includes sweeping, cleaning, and painting bridge components.

Uploaded by

Mars Tin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views18 pages

Condition Inspection Form (Cif) B01818LZ

The document summarizes a bridge condition inspection report for the Sucat Interchange (EB) bridge located in Muntinlupa City, Philippines. It was last inspected on October 21, 2015. [The bridge was given an overall condition rating of "Good" and the recommended action was for "Routine maintenance only."] The estimated remaining life of the bridge is 40 years and the estimated cost for routine maintenance for the next budget year is 90,000 Philippine Pesos, which includes sweeping, cleaning, and painting bridge components.

Uploaded by

Mars Tin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 18

Department of Public Works and Highways

BRIDGE MANAGEMENT SYSTEM

BRIDGE CONDITION INSPECTION FORM (TYPE 2)


Deprtment of Public Works and Highways
BRIDGE MANAGEMENT SYSTEM

BRIDGE CONDITION INSPECTION FORM (TYPE 2)

LOCATION BRIDGE DESCRIPTION

BRIDGE ID B01818LZ Type of Bridge Standard Bridge


Bridge Name Sucat Interchange (EB) Superstructure
Road Name Parañaque-Sucat Road Substructure
Road ID ROO653LZ Foundation
Section ID S03305LZ Total Number of Span 2
Location Sucat, Muntinlupa City Total Number of Abutment 2
Total Number of Pier 1
Region National Capital Region
Province Metro Manila
Congressional District Lone District of Muntinlupa City Date of Field Inspection October 21, 2015
Engineering District LPMDEO, DPWH-NCR
Municipality Muntinlupa City ACCOMPLISHED BY:
Barangay Sucat CHRISTINE VEL F. MARIANO
River Name Engineer II

SUBMITTED BY:
Insert Name, Position, Signature and Date of Signing WILFREDO S. MALLARI
Initial all other pages District Engineer

Bridge Condition Inspection Form Page 1 of 11 Effective Date August 22, 2007
SUMMARY

Bridge ID. B01818LZ Bridge Name Sucat Interchange (EB)

BRIDGE CONDITION BRIDGE SURVEYED? REASON FOR NO SURVEY


Yes x Bridgeworks in progress
OVERALL CONDITION REASONS FOR RECOMMENDATION No Access restricted
Good x Bridge inadequate for traffic LEVEL OF INSPECTION Affected by natural disaster
Fair Bridge alignment Full complete inspection No reason
Poor Flooding Partial inspection only: Other, insert reason
Bad Safety BIV not available
RECOMMENDED ACTION Bridge Deterioration Other reason x
Routine maintenance only x Scour and erosion
Major maintenance Excessive maintenance required
Upgrading Inadequate load capacity ROUTINE MAINTENANCE
Replacement No bridge - bridge required This section requires the bridge inspector to provide cost estimates for the routine maintenance
of the entire bridge for the following budget year.
Bridge required Other
Up to three (3) options may be selected. Routine maintenance activity Estimated Cost
BRIDGE INSPECTOR COMMENT Sweeping and cleaning of bridge deck P 30,000.00
Repairs to concrete bridge deck P
Repairs to concrete component P
Repairs to steel component P
Painting bridge components P 60,000.00
Repairs to Bailey bridges P
TYPE OF BRIDGE ESTIMATED REMAINING BRIDGE LIFE Repairs to timber components P
Standard Bridge x Years 40 Cleaning bridge waterways P
Special Bridge Remaining life of bridge shall be assessed in the range of Others (Specify) P
0-50 years
Special bridges are major complex bridges and require Total Estmated Cost P 90,000.00
condition inspection in accord-ance with the bridge
maintenance plan.

Bridge Condition Inspection Form Page 2 of 11 Effective Date August 22, 2007
REPAIR RECORD

Bridge ID. B01818LZ Bridge Name Sucat Interchange Bridge (EB)

MAJOR MAINTENANCE
MAJOR MAINTENANCE IMPLEMENTATION INSPECTOR
DATE
TYPE SCOPE COST START COMPLETION DURATION STATUS COMMENTS

ROUTINE MAINTENANCE
ROUTINE MAINTENANCE IMPLEMENTATION INSPECTOR
DATE
TYPE SCOPE COST START COMPLETION DURATION STATUS COMMENTS
A Sweeping and cleaning of bridge deck 30,000.00
E Painting bridge components 60,000.00

LEGEND: MAJOR MAINTENANCE TYPE ROUTINE MAINTENANCE ACTIVITY


A - Repair damage A - Sweeping and cleaning of bridge deck F - Repairs to Bailey bridges
B - Protective measures B - Repairs to concrete bridge deck G - Repairs to timber components
C - Strengthen C - Repairs to concrete component H - Cleaning bridge waterways
D - Replace D - Repairs to steel component I - Others (Specify)
E - None E - Painting bridge components

Bridge Condition Inspection Form Page 3 of 11 Effective Date August 22, 2007
SPAN ELEMENT - CONDITION

SPAN No. 1 (one set of forms for each span) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

ATTENTION LEVEL OF TYPE OF MAJOR ESTIMATED


ATTRIBUTE REFERENCE DESCRIBE DEFECTS AND RECOMMENDED WORKS
REQUIRED INSPECTION MAINTENANCE COST (P)
Immediate 3 Fully x Repair damage
Within 2 years 2 assessed Protective measures
Within 10 years 1 Partially Strengthen
DECK
None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
MAIN Within 10 years 1 Partially x Strengthen
MEMBER None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
SECONDARY Within 10 years 1 Partially Strengthen
MEMBER None 0 assessed Replace
Not Applicable x Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
LEFT Within 10 years 1 Partially Strengthen
RAILING None 0 assessed Replace
Not Applicable x Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
RIGHT Within 10 years 1 Partially x Strengthen
RAILING None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost

Bridge Condition Inspection Form Page 4 of 11 Effective Date August 22, 2007
SPAN ELEMENT - CONDITION

SPAN No. 2 (one set of forms for each span) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

ATTENTION LEVEL OF TYPE OF MAJOR ESTIMATED


ATTRIBUTE REFERENCE DESCRIBE DEFECTS AND RECOMMENDED WORKS
REQUIRED INSPECTION MAINTENANCE COST (P)
Immediate 3 Fully x Repair damage
Within 2 years 2 assessed Protective measures
Within 10 years 1 Partially Strengthen
DECK
None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
MAIN Within 10 years 1 Partially x Strengthen
MEMBER None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
SECONDARY Within 10 years 1 Partially Strengthen
MEMBER None 0 assessed Replace
Not Applicable x Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
LEFT Within 10 years 1 Partially Strengthen
RAILING None 0 assessed Replace
Not Applicable x Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
RIGHT Within 10 years 1 Partially x Strengthen
RAILING None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost

Bridge Condition Inspection Form Page 4 of 11 Effective Date August 22, 2007
PIER ELEMENT - CONDITION

PIER No. 1 (one set of forms for each pier) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Scour/Erosion Check, bridges across waterways only Height, bridge deck to ground level, left, (m) 6.46
Height, bridge deck to ground level, right, (m) 6.48

ATTENTION LEVEL OF TYPE OF MAJOR ESTIMATED


ATTRIBUTE REFERENCE DESCRIBE DEFECTS AND RECOMMENDED WORKS
REQUIRED INSPECTION MAINTENANCE COST (P)
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
MAIN Within 10 years 1 Partially X Strengthen
STRUCTURE None 0 X assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
Within 10 years 1 Partially Strengthen
FOUNDATION
None 0 assessed Replace
Not Applicable X Not X Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
EXPANSION Within 10 years 1 Partially X Strengthen
JOINT None 0 X assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
BEARING/ Within 10 years 1 Partially X Strengthen
RESTRAINT None 0 X assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
SCOUR Within 10 years 1 Partially Strengthen
PROTECTION None 0 assessed Replace
Not Applicable X Not Other
assessed Total Estimated Cost

Bridge Condition Inspection Form Page 5 of 11 Effective Date August 22, 2007
ABUTMENT ELEMENT - CONDITION (1/2)

ABUTMENT No. 1 (one set of froms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Scour/Erosion Check, bridges across waterways only Height, bridge deck to ground level, left, (m) 1.61
Height, bridge deck to ground level, right, (m) 1.61

ATTENTION LEVEL OF TYPE OF MAJOR ESTIMATED


ATTRIBUTE REFERENCE DESCRIBE DEFECTS AND RECOMMENDED WORKS
REQUIRED INSPECTION MAINTENANCE COST (P)
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
MAIN Within 10 years 1 Partially x Strengthen
STRUCTURE None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
Within 10 years 1 Partially Strengthen
FOUNDATION
None 0 assessed Replace
Not Applicable X Not X Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
EXPANSION Within 10 years 1 Partially x Strengthen
JOINT None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
BEARING/ Within 10 years 1 Partially x Strengthen
RESTRAINT None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
LEFT WING Within 10 years 1 Partially x Strengthen
WALL None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost

Bridge Condition Inspection Form Page 6 of 11 Effective Date August 22, 2007
ABUTMENT ELEMENT - CONDITION (2/2)

ABUTMENT No. 1 (one set of forms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

ATTENTION LEVEL OF TYPE OF MAJOR ESTIMATED


ATTRIBUTE REFERENCE DESCRIBE DEFECTS AND RECOMMENDED WORKS
REQUIRED INSPECTION MAINTENANCE COST (P)
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
RIGHT WING Within 10 years 1 Partially x Strengthen
WALL None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
SCOUR/BANK Within 10 years 1 Partially Strengthen
PROTECTION None 0 assessed Replace
Not Applicable x Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
BRIDGE Within 10 years 1 Partially x Strengthen
APPROACH None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost

Bridge Condition Inspection Form Page 7 of 11 Effective Date August 22, 2007
ABUTMENT ELEMENT - CONDITION (1/2)

ABUTMENT No. 2 (one set of froms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Scour/Erosion Check, bridges across waterways only Height, bridge deck to ground level, left, (m) 1.59
Height, bridge deck to ground level, right, (m) 1.59

ATTENTION LEVEL OF TYPE OF MAJOR ESTIMATED


ATTRIBUTE REFERENCE DESCRIBE DEFECTS AND RECOMMENDED WORKS
REQUIRED INSPECTION MAINTENANCE COST (P)
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
MAIN Within 10 years 1 Partially x Strengthen
STRUCTURE None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
Within 10 years 1 Partially Strengthen
FOUNDATION
None 0 assessed Replace
Not Applicable X Not X Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
EXPANSION Within 10 years 1 Partially x Strengthen
JOINT None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
BEARING/ Within 10 years 1 Partially x Strengthen
RESTRAINT None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
LEFT WING Within 10 years 1 Partially x Strengthen
WALL None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost

Bridge Condition Inspection Form Page 6 of 11 Effective Date August 22, 2007
ABUTMENT ELEMENT - CONDITION (2/2)

ABUTMENT No. 2 (one set of forms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

ATTENTION LEVEL OF TYPE OF MAJOR ESTIMATED


ATTRIBUTE REFERENCE DESCRIBE DEFECTS AND RECOMMENDED WORKS
REQUIRED INSPECTION MAINTENANCE COST (P)
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
RIGHT WING Within 10 years 1 Partially x Strengthen
WAL None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
SCOUR/BANK Within 10 years 1 Partially x Strengthen
PROTECTION None 0 assessed Replace
Not Applicable x Not Other
assessed Total Estimated Cost
Immediate 3 Fully Repair damage
Within 2 years 2 assessed Protective measures
BRIDGE Within 10 years 1 Partially x Strengthen
APPROACH None 0 x assessed Replace
Not Applicable Not Other
assessed Total Estimated Cost

Bridge Condition Inspection Form Page 7 of 11 Effective Date August 22, 2007
SPAN Element - Damage Rating

SPAN No. 1 (one set of forms for each span) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Affected Attrib. Affected Attrib.


Type of Severity of Damage Type of Severity of Damage
Type of Damage Cond. Type of Damage Cond.
% %

Unit

Unit
Material Defect Rating Material Defect Rating
State State
DECK MAIN MEMBER
Timber Decay/Splitting/Cracking Concrete Cracking
Disconnection/Displace. RC Spalling/Scaling/Disinteg.
Steel Corrosion Girder Delamination
Cracking PC Rebar exposure/corrosion
Deformation/Buckling Girder Honeycomb
Loose connection Slab Water leakage
Cracking Steel Corrosion
Concrete Spalling/Scaling/Disinteg. Steel Cracking
Slab Rebar exposure/corrosion Girder Deformation/Buckling
Honeycomb Steel Abnormal vibration
Water leakage Truss Loose connection
SECONDARY MEMBER (SM) / OTHER MEMBER (OM) Cable S. Paint peel off
SMOM SM OM SM OM SM OM SM OM SM OM Corrosion
Cracking Demount. Loose connection
Concrete Spalling/Scaling/Disint. (Bailey) Deformation/Buckling
Delamination Fretting/Abrasion
Rebar exposure/corrn. Masonry Cracking
Honeycomb (Arch) Material displacement/loss
Water leakage Bulging
Corrosion Timber Decay/Splitting/Cracking
Steel Cracking Disconnection/Displace.
Deformation/Buckling LEFT RAILING (LR) / RIGHT RAILING (RR)
Abnormal vibration LR RR LR RR LR RR LR RR LR RR SM OM
Loose connection Cracking
Paint peel off Concrete Delamination/Disinteg.
Fretting/Abrasion Impact/Accident damage
Masonry Cracking Rebar exposure/corrosion
Material displace./loss Corrosion
Bulging Steel Loose connection
Decay//Cracking Aluminum Impact/Accident damage
Timber Disconnection/Displace. Paint peel off

Bridge Condtion Inspection Form Page 8 of 11 Effective Date August 22, 2007
SPAN Element - Damage Rating

SPAN No. 1 (one set of forms for each span) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Affected Attrib. Affected Attrib.


Type of Severity of Damage Type of Severity of Damage
Type of Damage Cond. Type of Damage Cond.
% %

Unit

Unit
Material Defect Rating Material Defect Rating
State State
DECK MAIN MEMBER
Timber Decay/Splitting/Cracking Concrete Cracking
Disconnection/Displace. RC Spalling/Scaling/Disinteg.
Steel Corrosion Girder Delamination
Cracking PC Rebar exposure/corrosion
Deformation/Buckling Girder Honeycomb
Loose connection Slab Water leakage
Cracking Steel Corrosion
Concrete Spalling/Scaling/Disinteg. Steel Cracking
Slab Rebar exposure/corrosion Girder Deformation/Buckling
Honeycomb Steel Abnormal vibration
Water leakage Truss Loose connection
SECONDARY MEMBER (SM) / OTHER MEMBER (OM) Cable S. Paint peel off
SMOM SMOM SM OM SM OM SM OM SM OM Corrosion
Cracking Demount. Loose connection
Concrete Spalling/Scaling/Disint. (Bailey) Deformation/Buckling
Delamination Fretting/Abrasion
Rebar exposure/corrn. Masonry Cracking
Honeycomb (Arch) Material displacement/loss
Water leakage Bulging
Corrosion Timber Decay/Splitting/Cracking
Steel Cracking Disconnection/Displace.
Deformation/Buckling LEFT RAILING (LR) / RIGHT RAILING (RR)
Abnormal vibration LR RR LR RR LR RR LR RR LR RR SM OM
Loose connection Cracking
Paint peel off Concrete Delamination/Disinteg.
Fretting/Abrasion Impact/Accident damage
Masonry Cracking Rebar exposure/corrosion
Material displace./loss Corrosion
Bulging Steel Loose connection
Decay//Cracking Aluminum Impact/Accident damage
Timber Disconnection/Displace. Paint peel off

Bridge Condtion Inspection Form Page 8 of 11 Effective Date August 22, 2007
PIER Element - Damage Rating

PIER No. 1 (one set of forms for each pier) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Affected Attrib. Affected Attrib.


Type of Severity of Damage Type of Severity of Damage
Type of Damage Cond. Type of Damage Cond.
% %

Unit

Unit
Material Defect Rating Material Defect Rating
State State
MAIN STRUCTURE EXPANSION JOINT
Cracking Seals Water leakage
Concrete Spalling/Scaling/Disinteg. Abnormal space/noise
Delamination Difference in elevation
Rebar exposure/corrosion Deteriorated Sealant
Honeycomb
Tilt/Settlement Steel Water leakage
Fretting/Abrasion Abnormal space/noise
Masonry Cracking Difference in elevation
Material loss/displace. Displacement
Bulging Cracking
Tilt/Settlement Rubber Water leakage
Decay/Splitting/Cracking Abnormal space/noise
Timber Disconnection/Displace. Difference in elevation
Tilt/Settlement Displacement
BEARING/RESTRAINT Rupture
Corrosion None
Steel Loose connection FOUNDATION
Abnormal displacement Cracking
Paint deterioration Concrete Spalling/Scaling/Disinteg.
Bed (support) damage Delamination
Bulging Rebar exposure/corrosion
Rubber Abnormal displacement Honecomb
Bed (support) damage Tilt/Settlement
None Steel Corrosion
SCOUR PROTECTION Cracking
Concret Cracking Deformation/Buckling
Masonry Material loss/disinteg. Tilt/Settlement
Riprap
Gabion Damage on containing wire
Mattress Material loss/disinteg.
None

Bridge Condition Inspection Form Page 9 of 11 Effective Date August 22, 2007
ABUTMENT Element - Damage Rating (1/2)

ABUTMENT No. 1 (one set of forms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Affected Attrib. Affected Attrib.


Type of Severity of Damage Type of Severity of Damage
Type of Damage Cond. Type of Damage Cond.
% %

Unit

Unit
Material Defect Rating Material Defect Rating
State State
MAIN STRUCTURE EXPANSION JOINT
Cracking Seals Water leakage
Concrete Spalling/Scaling/Disinteg. Abnormal space/noise
Delamination Difference in elevation
Rebar exposure/corrosion Deteriorated Sealant
Honeycomb
Tilt/Settlement Steel Water leakage
Fretting/Abrasion Abnormal space/noise
Masonry Cracking Difference in elevation
Deterioration Displacement
Bulging Cracking
Tilt/Settlement Rubber Water leakage
Decay/Splitting/Cracking Abnormal space/noise
Timber Disconnection/Displace. Difference in elevation
Tilt/Settlement Displacement
SLOPE/BANK PROTECTION Rupture
Concret Cracking None
Masonry Bank erosion FOUNDATION
Grouted Slope erosion Cracking
Riprap Material loss/disinteg. Concrete Spalling/Scaling/Disinteg.
Gabion Damage on containing wire Delamination
Mattresses Material loss/disinteg. Rebar exposure/corrosion
Bank erosion Honecomb
Slope erosion Tilt/Settlement
Steel Corrosion Steel Corrosion
Sheet Pile Displacement/Deformation Cracking
Bank erosion Deformation/Buckling
Slope erosion Tilt/Settlement
None

Bridge Condition Inspection Form Page 10 of 11 Effective Date August 22, 2007
ABUTMENT Element - Damage Rating (2/2)

ABUTMENT No. 1 (one set of forms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Affected Attrib. Affected Attrib.


Type of Severity of Damage Type of Severity of Damage
Type of Damage Cond. Type of Damage Cond.
% %

Unit

Unit
Material Defect Rating Material Defect Rating
State State
BEARING/RESTRAINT BRIDGE APPROACH
Corrosion Embank- Material loss
Steel Loose connection ment Depression
Abnormal displacement None
Paint deterioration Assessment of Bridge Approach will be limited to 6.0 meter length.
Bed (support) damage
Bulging
Rubber Abnormal displacement
Bed damage
None
LEFT WING WALL (LW) / RIGHT WING WALL (RW)
LWRW LWRW LW RW LW RW LW RW LW RW
Cracking
Concrete Delamination/Disinteg.
Rebar exposure/corrosion
Corrosion
Masonry Loose connection
Deformation/Buckling
Paint peel off
None

Bridge Condition Inspection Form Page 11 of 11 Effective Date August 22, 2007
ABUTMENT Element - Damage Rating (1/2)

ABUTMENT No. 2 (one set of forms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Affected Attrib. Affected Attrib.


Type of Severity of Damage Type of Severity of Damage
Type of Damage Cond. Type of Damage Cond.
% %

Unit

Unit
Material Defect Rating Material Defect Rating
State State
MAIN STRUCTURE EXPANSION JOINT
Cracking Seals Water leakage
Concrete Spalling/Scaling/Disinteg. Abnormal space/noise
Delamination Difference in elevation
Rebar exposure/corrosion Deteriorated Sealant
Honeycomb
Tilt/Settlement Steel Water leakage
Fretting/Abrasion Abnormal space/noise
Masonry Cracking Difference in elevation
Deterioration Displacement
Bulging Cracking
Tilt/Settlement Rubber Water leakage
Decay/Splitting/Cracking Abnormal space/noise
Timber Disconnection/Displace. Difference in elevation
Tilt/Settlement Displacement
SLOPE/BANK PROTECTION Rupture
Concret Cracking None
Masonry Bank erosion FOUNDATION
Grouted Slope erosion Cracking
Riprap Material loss/disinteg. Concrete Spalling/Scaling/Disinteg.
Gabion Damage on containing wire Delamination
Mattresses Material loss/disinteg. Rebar exposure/corrosion
Bank erosion Honecomb
Slope erosion Tilt/Settlement
Steel Corrosion Steel Corrosion
Sheet Pile Displacement/Deformation Cracking
Bank erosion Deformation/Buckling
Slope erosion Tilt/Settlement
None

Bridge Condition Inspection Form Page 10 of 11 Effective Date August 22, 2007
ABUTMENT Element - Damage Rating (2/2)

ABUTMENT No. 2 (one set of forms for each abutment) Bridge ID B01818LZ Bridge Name Sucat Interchange (EB)

Affected Attrib. Affected Attrib.


Type of Severity of Damage Type of Severity of Damage
Type of Damage Cond. Type of Damage Cond.
% %

Unit

Unit
Material Defect Rating Material Defect Rating
State State
BEARING/RESTRAINT BRIDGE APPROACH
Corrosion Embank- Material loss
Steel Loose connection ment Depression
Abnormal displacement None
Paint deterioration Assessment of Bridge Approach will be limited to 6.0 meter length.
Bed (support) damage
Bulging
Rubber Abnormal displacement
Bed damage
None
LEFT WING WALL (LW) / RIGHT WING WALL (RW)
LWRW LWRW LW RW LW RW LW RW LW RW
Cracking
Concrete Delamination/Disinteg.
Rebar exposure/corrosion
Corrosion
Masonry Loose connection
Deformation/Buckling
Paint peel off
None

Bridge Condition Inspection Form Page 11 of 11 Effective Date August 22, 2007