0% found this document useful (0 votes)
73 views1 page

Testing of Material

This document outlines the testing requirements for materials used in the construction of an additional workshop and theory room at an ITI building in Harij, Patan. It specifies 10 materials that will be tested, including cement, aggregate, bricks, sand, concrete cubes, steel, and water. The frequency of testing for each material is provided, with a minimum of 10% of total tests to be conducted at the government laboratory. Contractors will have 1% of the estimated project cost deducted from payments to cover material testing costs.

Uploaded by

shakil nagori
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views1 page

Testing of Material

This document outlines the testing requirements for materials used in the construction of an additional workshop and theory room at an ITI building in Harij, Patan. It specifies 10 materials that will be tested, including cement, aggregate, bricks, sand, concrete cubes, steel, and water. The frequency of testing for each material is provided, with a minimum of 10% of total tests to be conducted at the government laboratory. Contractors will have 1% of the estimated project cost deducted from payments to cover material testing costs.

Uploaded by

shakil nagori
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NAME OF WORK:- Construction of Additional Workshop & Theory room AT-I.T.

I Building at Harij Ta- Harij Dist -


Patan.

SCHEDULE OF TESTING OF MATERIALS


For ensuring quality control and workmanship various tests prescribe below corresponding to the material
concerned shall be taken as periodic intervals as stipulated below be taken.
The Material shall be got tested through Govt. Recognised Laboratory ( R. & B. ) or field Laboratory of
GERI ( R. & B. ) for which 1% of the estimated amount of tender shall be recovered from the contractor's R.A.
Bill and Final Bills as the testing charges shall be paid by the Govt. to the GERI. How ever if the charges
increase over 1 % no excess recovery shall be made from the contractor as per resolution of B.& C. department
dated 10th May 1985 vide TNC/1085 (4) S. Minimum 10% of total tests for each material shall be carried out in Govt.
Laboratory i.e.GERI
It. Material Qty. of Type of test which shall be Frequency @ which test Total No.
No. to be tested material carried out. shall be carried out of test
to be taken.
1 Cement 76.00 Consistancy, Shetting time 1 Test / 50 MT 2 test
comp. strength finerals
2 Kapachi 78.12 Gradation, Flekiness, Impact, 1 to 100 Cmt = 1 Test 1 test
Abrasion, water absorption & 100 to 500Cmt=3 Test
Striping 500 to 1500Cmt=5 Test
1500 to 5000Cmt= 7 Test
3 Grit - 6 to 10 mm 8.68 Gradation, Flekiness, Impact, 1 to 100 Cmt = 1 Test 1 test
Abrasion, water absorption & 100 to 500Cmt=3 Test
Striping 500 to 1500Cmt=5 Test
1500 to 5000Cmt= 7 Test
4 Bricks 48150.00 Dimension/tolarance/ water 1 test per 50000 Nos 1 test
absoption/ Comp.
strength/efflorance
5 Sand 133.85 Flekiness modules and 1 Test / 250 Cum. 1 test
Gradation Silt content

6 CC Cube M-150 6.30 Compresive Strength 1 Test / 50 Cum. 1 test

7 CC Cube M-200 105.60 Compresive Strength 1 Test / 50 Cum. 6 test

8 Steel each category 15.37 Tensile stren. / Elongaliy 1 test for each Category / 1 test
40 mt per 1 test
9 Water Chemical Analysis 1 test for each Soruce 1 test

10 Mix - Design - M-200, 1 test for each Soruce -

The contractor Shall have to pay 1% of the estimate cost put to tender towards all testing of materials & same
shall be deducted from their bills for the works. The testing of various materials shall be carried out in GERI and
result received shall be binding to all i.e. contractor & Govt.
Testing charges of GERI shall be born by Govt. No refund be made or extra charge over 1% shall be
recoverable from the contractor.

Deputy Executive Engineer