7/14/2020 HSE Method of Statement - HSE-MES
Project Name Science Museum & Geo-ClimatE - KAFD-RY-RIA2-CP22 Phase No. Client KAFD DMC
Contractor Al Bawani Co. Project No. 61160 Consultant ZFP
Rev SUBMITTED Received Under Review
SI. NO Decpline Sub NO. Transmittal NO. type DOCUMENT. TITLE SUB.PREPARED Remarks DAYS CODE Parsons Transmittal No. DOC> STATUS COMMENTS
. DATE DATE (Days)
Action code: A = Approved as submitted; B = Approved as noted; C = Objection; D = No Objection ; I = Information & Action ; E = No Objection with Comments
HSE Method of Statement
1 HSE KAFD-RY-RIA2-CP22-ABC-HSE-MES-00001 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00007 MES Electrical Cable management 5-Nov-19 5-Nov-19 11-Nov-19 6 C _ Open Refer to the comments on transmittal cover page
2 HSE KAFD-RY-RIA2-CP22-ABC-HSE-MES-00002 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00011 MES MES for Lifeline Installation 21-Jan-20 22-Jan-20 27-Jan-20 5 B _ Closed Refer to the comments on transmittal cover page
3 HSE KAFD-RY-RIA2-CP22-ABC-HSE-MES-00003 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00013 MES MES For Lifting Plan & Risk Assessment 27-Feb-20 27-Feb-20 22-Mar-20 24 E KAFDA2-CP22-GEN-PMC-TRN-00086 Closed Refer to the comments on transmittal cover page
HSE KAFD-RY-RIA2-CP22-ABC-HSE-MES-00003 1 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00024 MES MES For Lifting Plan & Risk Assessment 6-Jul-20 6-Jul-20 8-Jul-20 2 A Closed Refer to the comments on transmittal cover page
4 HSE KAFD-RY-RIA2-CP22-ABC-HSE-MES-00004 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00015 MES Temporary Work Procedure. 10-May-20 12-May-20 13-May-20 1 B Refer to the comments on transmittal cover page
Retained By: QA/QC Site Engineer
2
ZFP Transmittal to Parsons
Retained By: QA/QC Site Engineer
3
7/14/2020 HSE- REPORTS - HSE-RPT
Project Name Science Museum & Geo-ClimatE - KAFD-RY-RIA2-CP22 Phase No. Client KAFD DMC
Contractor Al Bawani Co. Project No. 61160 Consultant ZFP
Rev SUBMITTED Received Under Review
SI. NO Decpline Sub NO. Transmittal NO. type DOCUMENT. TITLE SUB.PREPARED Remarks DAYS CODE Parsons Transmittal No. DOC> STATUS COMMENTS
. DATE DATE (Days)
Action code: A = Approved as submitted; B = Approved as noted; C = Objection; D = No Objection ; I = Information & Action ; E = No Objection with Comments
HSE- REPORTS
1 HSE KAFD-RY-RIA2-CP22-ABC-HSE-RPT-00001 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00004 RPT Near Miss Report 17-Sep-19 For Information 17-Sep-19 17-Sep-19 0 I Closed _
Retained By: QA/QC Site Engineer
4
ZFP Transmittal to Parsons
Retained By: QA/QC Site Engineer
5
7/14/2020 HSE PLAN - HSE-PLN
Project Name Science Museum & Geo-ClimatE - KAFD-RY-RIA2-CP22 Phase No. Client KAFD DMC
Contractor Al Bawani Co. Project No. 61160 Consultant ZFP
Rev SUBMITTED Received Under Review
SI. NO Decpline Sub NO. Transmittal NO. type DOCUMENT. TITLE SUB.PREPARED Remarks DAYS CODE Parsons Transmittal No. DOC> STATUS COMMENTS
. DATE DATE (Days)
Action code: A = Approved as submitted; B = Approved as noted; C = Objection; D = No Objection ; I = Information & Action ; E = No Objection with Comments
HSE-PLN
Receipt Has been submitted to ZFP - no reply received from ZFP -
1 HSE C22-DC-G-514 0 _ Plan Life Support Check list Science Museum 13-May-19 With Parsons 14-May-19 Acknowledged Closed
Code E (Receipt Acknowledged)
2 HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00001 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00001 Plan Al Bawani Heat Stress Management Plan 15-Aug-19 With Parsons 18-Aug-19 331 U Open
HSE C22-DC-G-514 0 _ Plan ERP – Emergency Response Plan 14-May-19 14-May-19 23-Jun-19 40 E Closed Transmittal sent from Parsons to ZFP with Code C
KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00002
HSE 1 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00002 Plan ERP – Emergency Response Plan 2-Sep-19 9-Sep-19 14-Oct-19 35 B Closed Refer to the comments on transmittal cover page
Old No. DC-G-513
HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00002 2 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00009 Plan ERP – Emergency Response Plan 17-Dec-19 17-Dec-19 29-Dec-19 12 B _ Closed Refer to the comments on transmittal cover page
3 HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00002 3 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00010 Plan ERP – Emergency Response Plan 6-Jan-20 16-Jan-20 27-Jan-20 11 D _ Closed Refer to the comments on transmittal cover page
After Approval ABC Received from ZFP, It has been rejected
HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00003 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00003 Check List Security Plan Science Museum 6-Nov-19 6-Nov-19 19-Nov-19 13 *C Closed
from Parsons with Code C
After Approval ABC Received from ZFP, It has been rejected
4 HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00003 1 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00008 Plan Security Plan Science Museum 14-Dec-19 16-Dec-19 31-Dec-19 15 C Open
from Parsons with Code C
5 HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00004 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00005 Plan Emergency Rescue Plan 23-Sep-19 23-Sep-19 16-Feb-20 146 E Open Refer to the comments on transmittal cover page
6 HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00005 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00006 Plan General Lifting Plan 5-Nov-19 5-Nov-19 12-Nov-19 7 E _ Closed Refer to the comments on transmittal cover page
HSE C22-DC-G-512 0 _ Plan CSP - Construction Safety Plan. 13-May-19 14-May-19 12-Nov-19 182 E KAFD-RY-RIA2-CP22-SAP-DCM-TRA-00037 Closed Refer to the comments on transmittal cover page
7 HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00006 1 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00012 Plan CSP - Construction Safety Plan. 8-Feb-20 9-Feb-20 20-Feb-20 11 D KAFD-RY-RIA2-CP22-SAP-OCS-00031 Closed Refer to the comments on transmittal cover page
Facade Ladder and Glass Panel Installation At Science Museum - Geo
8 HSE KAFD-RY-RIA2-CP22-ABC-HSE-PLN-00007 0 KAFD-RY-RIA2-CP22-ABC-HSE-TRA-00014 Plan 25-Mar-20 25-Mar-20 5-Apr-20 11 B Closed Refer to the comments on transmittal cover page
Climate Center Zone B6-B5
Retained By: QA/QC Site Engineer
6
ZFP Transmittal to Parsons
KAFD-RY-RIA2-CP22-ZFP-ABC-PMT-LTR-00013
_
KAFD-RY-RIA2-CP22-ZFP-SAP-HSE-PLN-TRA-00125
KAFD-RY-RIA2-CP22-ZFP-ABC-DMC-TRA-00005
KAFD-RY-RIA2-CP22-ZFP-SAP-HSE-PMT-TRA-00099
Retained By: QA/QC Site Engineer