100% found this document useful (1 vote)
157 views

Circular Footing Design Based On ACI 318-19: Input Data & Design Summary

This document provides a design summary and analysis for a circular footing to support a 12-inch diameter column. Key details include a 7.5-foot diameter footing with 18 inches of concrete and #4 and #6 rebar. Three load cases are considered accounting for dead loads, live loads, and wind loads. Bearing capacity, flexure, and shear checks show the design is adequate to support the factored loads with required factors of safety based on ACI 318 code requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
157 views

Circular Footing Design Based On ACI 318-19: Input Data & Design Summary

This document provides a design summary and analysis for a circular footing to support a 12-inch diameter column. Key details include a 7.5-foot diameter footing with 18 inches of concrete and #4 and #6 rebar. Three load cases are considered accounting for dead loads, live loads, and wind loads. Bearing capacity, flexure, and shear checks show the design is adequate to support the factored loads with required factors of safety based on ACI 318 code requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT : PAGE :

CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Circular Footing Design Based on ACI 318-19

INPUT DATA & DESIGN SUMMARY


COLUMN DIAMETER dcol = 12 in
COLUMN DEAD LOAD PDL = 40 kips
COLUMN LIVE LOAD PLL = 38 kips
LATERAL LOAD (0=Wind, 1=Seismic) 0 Wind,SD
WIND AXIAL LOAD PLAT = 5 k, SD
WIND MOMENT LOAD MLAT = 39.5 ft-k, SD
WIND SHEAR LOAD VLAT = 0.15 k, SD
SOIL WEIGHT ws = 0.11 kcf
FOOTING EMBEDMENT DEPTH Df = 2 ft
FOOTING THICKNESS T= 18 in
ALLOW SOIL PRESSURE Qa = 2.5 ksf
FOOTING DIAMETER D= 7.5 ft
CONCRETE STRENGTH fc ' = 3 ksi
REBAR YIELD STRESS fy = 60 ksi
FOOTING TOP REBAR # 4 @ 48 in o.c., each way
FOOTING BOTTOM REBAR # 6 @ 18 in o.c., each way
THE FOOTING DESIGN IS ADEQUATE.
ANALYSIS
CHECK OVERTURNING FACTOR (IBC 1605.2.1, 1808.3.1, & ASCE 7 12.13.4)
MR / MO = 9.4 > F = 1.0 / 0.9 = 1.11 [Satisfactory]
Where MO = MLAT + VLAT T - PLAT(0.5 D) = 21 k-ft MR = (PDL+ Pftg + Psoil) (0.5 D) = 196 k-ft
Pftg = (0.15 kcf) p T D2/ 4 = 9.94 k, footing weight
Psoil = ws (Df - T) p D2/ 4 = 2.43 k, soil weight

COMBINED LOADS AT TOP FOOTING (IBC 1605.3.2 & ACI 318 5.3)
CASE 1: DL + LL P = 78.0 kips 1.2 DL + 1.6 LL Pu = 108.8 kips

CASE 2: DL + LL + 0.6(1.3) W P = 81.9 kips 1.2 DL + LL + 1.0 W Pu = 91.0 kips


M = 31 ft-kips Mu = 40 ft-kips
V = 0.1 kips Vu = 0.2 kips
e = 0.4 ft, fr cl ftg eu = 0.4 ft, fr cl ftg
CASE 3: DL + LL + 0.6(0.65) W P = 80.0 kips 0.9 DL+ 1.0 W Pu = 41.0 kips
M = 15 ft-kips Mu = 40 ft-kips
V = 0.1 kips Vu = 0.2 kips
e = 0.2 ft, fr cl ftg eu = 1.0 ft, fr cl ftg

CHECK SOIL BEARING CAPACITY (ACI 318 13.3.1.1)

Service Loads CASE 1 CASE 2 CASE 3


P 78.0 81.9 80.0 k
e 0.0 0.4 0.2 ft (from center of footing)
Pftg - Psoil 7.5 7.5 6.8 k, (footing increasing)
SP 85.5 89.4 86.7 k, (net loads)
e 0.0 0.3 0.2 ft
qmin 1.94 1.28 1.96 ksf
x @ 0.00 ft, from edge @ 0 ft, from edge
qmax 1.94 2.77 1.96 ksf
qallowable 2.50 3.33 3.33 ksf

[Satisfactory]

CHECK FLEXURE & SHEAR OF FOOTING


(ACI 318 13, 21, & 22)
0.85 1 f c
'
 T 4  u
 MIN  MIN  0.0018 ,   MAX 
 d 3  f y u  t
 Mu 
0.85 f c' 1  1  
 '
0.383bd 2 f c 
  
fy
 Mu 
0.85 f c' 1  1  
 0.383bd 2 f c' 
  
fy
(cont'd)
FACTORED SOIL PRESSURE
Factored Loads CASE 1 CASE 2 CASE 3
Pu 108.8 91.0 41.0 k
eu 0.0 0.4 1.0 ft
g[0.15T + ws(Df - T)] A 14.8 14.8 11.1 k, (factored footing & backfill)
S Pu 123.6 105.8 52.1 k
eu 0.0 0.4 0.8 ft
qu, min 2.80 1.44 0.22 ksf
x @ 0.00 ft, from edge @ 0.00 ft, from edge
qu, max 2.80 3.36 2.14 ksf

FOOTING MOMENT & SHEAR FOR CASE 1


Section 0 1/10 D 2/10 D 3/10 D 4/10 D Center 6/10 D 7/10 D 8/10 D 9/10 D D
Xu (ft, dist. from left of footing) 0 0.75 1.50 2.25 3.00 3.75 4.50 5.25 6.00 6.75 7.50
Tangent (ft) 0.00 4.50 6.00 6.87 7.35 7.50 7.35 6.87 6.00 4.50 0.00
TA ( ft2 ) 0.00 2.30 3.99 4.86 5.36 11.17 5.36 4.86 3.99 2.30 0.00
Mu,col (ft-k) 0 0 0 0 0 0 81.6 163.2 244.8 326.4 408
Vu,col (k) 0 0 0 0 0 54.4 108.8 108.8 108.8 108.8 108.8
qu,ftg & fill (ksf) 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34
Mu,ftg & fill (ft-k) 0.00 0.00 0.58 2.16 4.97 9.13 16.11 24.43 33.98 44.53 55.67
Vu,ftg & fill (k) 0.00 0.39 1.44 2.93 4.65 7.42 10.20 11.91 13.40 14.46 14.84
qu,soil (ksf) -2.80 -2.80 -2.80 -2.80 -2.80 -2.80 -2.80 -2.80 -2.80 -2.80 -2.80
Mu,soil (ft-k) 0 0 -4.8262 -18.029 -41.427 -76.066 -134.16 -203.5 -283.03 -370.93 -463.67
Vu,soil (k) 0 -3.2175 -12.02 -24.401 -38.691 -61.822 -84.953 -99.243 -111.62 -120.43 -123.64
S Mu (ft-k) 0 -2.1234 -4.2468 -15.865 -36.454 -66.934 -36.454 -15.865 -4.2468 -2.1234 0
S Vu (kips) 0 -2.8312 -10.577 -21.471 -34.046 0 34.046 21.4714 10.5766 2.83119 0

FOOTING MOMENT & SHEAR FOR CASE 2


Section 0 1/10 D 2/10 D 3/10 D 4/10 D Center 6/10 D 7/10 D 8/10 D 9/10 D D
Xu (ft, dist. from left of footing) 0 0.75 1.50 2.25 3.00 3.75 4.50 5.25 6.00 6.75 7.50
Tangent (ft) 0.00 4.50 6.00 6.87 7.35 7.50 7.35 6.87 6.00 4.50 0.00
TA ( ft2 ) 0.00 2.30 3.99 4.86 5.36 11.17 5.36 4.86 3.99 2.30 0.00
Mu,col (ft-k) 0 0 0 0 0 -19.9 28.45 96.7 164.95 233.2 301.45
Vu,col (k) 0 0 0 0 0 45.5 91.0 91.0 91.0 91.0 91.0
qu,ftg & fill (ksf) 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34
Mu,ftg & fill (ft-k) 0.00 0.00 0.58 2.16 4.97 9.13 16.11 24.43 33.98 44.53 55.67
Vu,ftg & fill (k) 0.00 0.39 1.44 2.93 4.65 7.42 10.20 11.91 13.40 14.46 14.84
qu,soil (ksf) 1.44 1.63 1.82 2.01 2.20 2.40 2.59 2.78 2.97 3.16 3.36
Mu,soil (ft-k) 0 0 -2.718 -10.71 -25.798 -49.456 -92.554 -145.72 -208.68 -280.26 -357.12
Vu,soil (k) 0 -1.8715 -7.3746 -15.892 -26.679 -45.966 -66.281 -79.96 -92.64 -102.21 -105.84
S Mu (ft-k) 0 -1.0693 -2.1386 -8.5457 -20.824 -60.224 -47.997 -24.584 -9.7513 -4.8757 0
S Vu (kips) 0 -1.4853 -5.9316 -12.963 -22.034 6.95635 34.9183 22.9546 11.7608 3.25073 0

FOOTING MOMENT & SHEAR FOR CASE 3


Section 0 1/10 D 2/10 D 3/10 D 4/10 D Center 6/10 D 7/10 D 8/10 D 9/10 D D
Xu (ft, dist. from left of footing) 0 0.75 1.50 2.25 3.00 3.75 4.50 5.25 6.00 6.75 7.50
Tangent (ft) 0.00 4.50 6.00 6.87 7.35 7.50 7.35 6.87 6.00 4.50 0.00
TA ( ft2 ) 0.00 2.30 3.99 4.86 5.36 11.17 5.36 4.86 3.99 2.30 0.00
Mu,col (ft-k) 0 0 0 0 0 -19.9 -9.05 21.7 52.45 83.2 113.95
Vu,col (k) 0 0 0 0 0 20.5 41.0 41.0 41.0 41.0 41.0
qu,ftg & fill (ksf) 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Mu,ftg & fill (ft-k) 0.00 0.00 0.43 1.62 3.73 6.85 12.08 18.32 25.48 33.40 41.75
Vu,ftg & fill (k) 0.00 0.29 1.08 2.20 3.48 5.57 7.65 8.94 10.05 10.84 11.13
qu,soil (ksf) 0.22 0.53 0.85 1.16 1.47 1.79 2.10 2.42 2.73 3.04 2.14
Mu,soil (ft-k) 0 0 -0.5724 -2.7221 -7.5016 -15.964 -33.745 -56.775 -85.276 -118.86 -155.7
Vu,soil (k) 0 -0.405 -1.9259 -4.9025 -9.3686 -18.567 -28.874 -36.459 -43.923 -49.825 -52.133
S Mu (ft-k) 0 -0.0689 -0.1379 -1.0988 -3.7715 -29.015 -30.715 -16.752 -7.3423 -3.6711 0
S Vu (kips) 0 -0.1153 -0.8437 -2.7054 -5.8849 7.49907 19.7748 13.4771 7.12764 2.0185 0
(cont'd)
FOOTING MOMENT & SHEAR SUMMARY
Section 0 1/10 D 2/10 D 3/10 D 4/10 D Center 6/10 D 7/10 D 8/10 D 9/10 D D
Xu (ft, dist. from left of footing) 0 0.75 1.50 2.25 3.00 3.75 4.50 5.25 6.00 6.75 7.50
Tangent (ft) 0.00 4.50 6.00 6.87 7.35 7.50 7.35 6.87 6.00 4.50 0.00
Case Mu, (ft-k / ft) 0 -0.4719 -0.7078 -2.308 -4.9607 -8.9245 -4.9607 -2.308 -0.7078 -0.4719 0

Uniform Loads
1 Vu, (k / ft) 0 -0.6292 -1.7628 -3.1236 -4.6331 0 4.63308 3.12362 1.76276 0.62915 0
Case Mu, (ft-k / ft) 0 -0.2376 -0.3564 -1.2432 -2.8338 -8.0298 -6.5316 -3.5765 -1.6252 -1.0835 0
2 Vu, (k / ft) 0 -0.3301 -0.9886 -1.8858 -2.9984 0.92751 4.75179 3.33941 1.96013 0.72238 0
Case Mu, (ft-k / ft) 0 -0.0153 -0.023 -0.1598 -0.5132 -3.8686 -4.1798 -2.4371 -1.2237 -0.8158 0
3 Vu, (k / ft) 0 -0.0256 -0.1406 -0.3936 -0.8008 0.99988 2.69101 1.96062 1.18794 0.44855 0

CHECK FLEXURE
Location Mu,max d (in) r min rreqD rmax smax rprovD
Top Slab 0.0 ft-k / ft 15.75 0.0000 0.0000 0.0155 no limit 0.0003
Bottom Slab -8.9 ft-k / ft 14.63 0.0010 0.0008 0.0155 18 0.0017 [Satisfactory]

CHECK FLEXURE SHEAR


Vu,max fVc = 2 f b d (fc')0.5 check Vu < f Vc
4.8 k / ft 14 k [Satisfactory]

CHECK PUNCHING Pu  R 0.5


SHEAR  v318
(ACI M u13.2.7.2,
b1 22.6.4.1, 22.6.4.3, & 8.4.2.3)
v ( psi )   A P  2  b1  b 2  d
u J  vc ( psi )    2  y  f 'c
AP 1
 v  1
 d b3    d  2  4 d 
1  1   b 2   1
2 b1 y  MIN  2, , 40 
J     3  3 b2   b 
 6    b1   b1    c 0
   D2 b0
P u b1b 2 Af 
4 b 0    d col  d  , b1  b 2 
R 4
Af

Case Pu Mu b1 b2 b0 gv bc y Af Ap R J vu (psi) f vc
1 108.8 0.0 21.4 21.4 7.1 0.4 1.0 2.0 44.2 9.0 7.8 5.4 77.9 164.3
2 91.0 39.8 21.4 21.4 7.1 0.4 1.0 2.0 44.2 9.0 6.5 5.4 65.3 164.3
3 41.0 39.8 21.4 21.4 7.1 0.4 1.0 2.0 44.2 9.0 2.9 5.4 29.5 164.3
[Satisfactory]
where f = 0.75 (ACI 318 21.2)

You might also like