D Fun Go Proposal

This document presents a project proposal to address the lack of water supply in Barangay Boñga. The proposal aims to find a solution to the problem and help the people suffering from it. The project will involve drilling wells, providing water tanks, and monitoring the water supply. It will take approximately 3 months to complete at an estimated cost of 606,772 pesos. Risks include delays, environmental issues, and supply shortages. Proper planning and funding are intended to minimize risks and ensure the sustainability and success of the project.

Uploaded by

Julius Pampola
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views6 pages

D Fun Go Proposal

This document presents a project proposal to address the lack of water supply in Barangay Boñga. The proposal aims to find a solution to the problem and help the people suffering from it. The project will involve drilling wells, providing water tanks, and monitoring the water supply. It will take approximately 3 months to complete at an estimated cost of 606,772 pesos. Risks include delays, environmental issues, and supply shortages. Proper planning and funding are intended to minimize risks and ensure the sustainability and success of the project.

Uploaded by

Julius Pampola
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

BICOL MERCHANT MARINE COLLEGE INCORPORATED

PIOT SORSOGON CITY


S Y.2018-2019

LACK OF WATER SUPPLY


IN BRGY.BOÑGA
(PROJECT PROPOSAL)

Josua Camacho
Paul john F. Fungo
John Patrick Lodor
INTRODUCTION:

In Barangay Boñga have a case of lack of water supply to all there


consumer, when they got a cause to all people in this brgy.according
according to them proposal project to show the good and bad effect of lack of
water supply in Brgy.Boñga.

PROJECT SUMMARY:

This project aims to find a solution of there kind of case in Brgy.Boñga.


it also aims to help to all people who suffered in this problem. This project
all of people to this particular , it also aims to got a person in which a
tendency to forced this kind of case, to all thier official of our country.
Through this project we help to rebuild this project to help people
who suffered this, in Brgy.Boñga. this project will be done for an stimate of
almost three months, from January 2019-March 2019. Furthermore the success
of this project requires to help of all household and also the government
employees. And to provide the sufficient supply of resources to be completed,
the needed resources are listed on the project costs, as well as the
miscellaneous assets.
PROJECT METHODOLOGY:

Preparation and approval of other necessary documents and materials


after the approval of this project, from the Department of Public works and
water, the ordering and preparation of required materials the having of
construction workers the submission of other necessary documents and the
assessment and evaluation of the water in the area will be conducted next.

~Project Implementation
a.Procurement period

b.sub-grabe preparation

c.Drilling operation

d.Providing water tank

e.Project monitoring
PROJECT COSTS:

Project Resource Amount and price Total amount


Cement 100bagx265 26,500
Hallow block 600pcsx15 9,000
Plywood 20pcsx300 6,000
Coco lumber (2x2) 120pcsx34 4,080
Gravel 3cu.mx1304 3,912
Black sand 6cu.mx2000 12,000
Nails(per kilo) 80x20 1,600
Pipe 20x1000 20,000
Steel bars 300pcsx500 150,000
Tire wire 6rollsx30 180
Worker Employees(week 1300x15 19,500
pay)
Snacks (per week) 600x15 9,000
Equipment Water pump 3pcsx50,000 150,000
Generator 3pcs hirex50,000 150,000
Stainless tank 3pcsx15,000 45,000

Total budget =606,772


amount
CONCLUSION:

With this project proposal, it has been evident that we aim to improve
the water supply in the barangay, and to help to all people who suffered to this
problem.
This project proposal, contains every information required in
completing this project. As long every detail is done properly it will be a success
and also to resolve this kind of problem in barangay Boñga in Castilla..

PROJECT RISK MANAGEMENT:

The project is subjected to the usual risk for water tank project.
Including project start-up delay, environmental risks, and supply shortage. To
minimize project start-up delay, all water tank in the area have already been
screened. To ensure water tank sustainability we will ensure that the
government, and other finances to maintain the construct of water tank well
funded throughout the entire span of the project. To avoid shortage supply and
materials, we will ensure the availability an sufficient stock of spare parts, to
ensure the right plan for this project.
PROJECT RISK MANAGEMENT: