D Fun Go Proposal
D Fun Go Proposal
Josua Camacho
Paul john F. Fungo
John Patrick Lodor
INTRODUCTION:
PROJECT SUMMARY:
~Project Implementation
a.Procurement period
b.sub-grabe preparation
c.Drilling operation
e.Project monitoring
PROJECT COSTS:
With this project proposal, it has been evident that we aim to improve
the water supply in the barangay, and to help to all people who suffered to this
problem.
This project proposal, contains every information required in
completing this project. As long every detail is done properly it will be a success
and also to resolve this kind of problem in barangay Boñga in Castilla..
The project is subjected to the usual risk for water tank project.
Including project start-up delay, environmental risks, and supply shortage. To
minimize project start-up delay, all water tank in the area have already been
screened. To ensure water tank sustainability we will ensure that the
government, and other finances to maintain the construct of water tank well
funded throughout the entire span of the project. To avoid shortage supply and
materials, we will ensure the availability an sufficient stock of spare parts, to
ensure the right plan for this project.
PROJECT RISK MANAGEMENT: