National Cement Share Company

This weekly plan document outlines tasks to be completed from July 23rd to July 28th by the National Cement Share Company. It includes 8 tasks such as making drawings for jumbo bag floor checkered plates, supplying equipment per designs, checking alignments, and creating a master spare parts list. Each task is assigned an area number and lists the starting and finishing dates as well as any requirements or remarks. It was prepared by Thomas Teshome and is one page.

Uploaded by

Eyob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

National Cement Share Company

This weekly plan document outlines tasks to be completed from July 23rd to July 28th by the National Cement Share Company. It includes 8 tasks such as making drawings for jumbo bag floor checkered plates, supplying equipment per designs, checking alignments, and creating a master spare parts list. Each task is assigned an area number and lists the starting and finishing dates as well as any requirements or remarks. It was prepared by Thomas Teshome and is one page.

Uploaded by

Eyob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DOCUMENT

NATIONAL CEMENT SHARE COMPANY


NC/PM/23/02

TITLE Weekly Plan Err:514 ISSUE NO. 1 Page 1 of 1

S.N Area Description Starting date Finishing date Requirment Remarks

1 Weekly action plan & report, consumption& evaluation


report& KPI information collect & MOM document.

Kaizen Implementation as per the comment we receive Roll meter


2
from expertise. meter

7/23/2020 7/23/2020
Make a drawing for jumbo bag floor checkered plates
3
position at +6.50m.

Supply, prepare & give a confirmation on site jumbo


4
bag local’s equipment as per the design.

Reviewing shelfs if they are placed as per document


1 locator menu, checking the document movment
monitoring lists and collect unreturned .
7/24/2020 7/24/2020

Roll meter
2 521 Make a jumbo bag floor checkered plates at +6.50m.
meter

Supply, prepare & give a confirmation on site jumbo


1
bag local’s equipment as per the design.

7/25/2020 7/25/2020
Theodolite
Jumbo bag project
2 521 Roll meter
Checking alignment.
meter

Make a drawing for jumbo bag floor checkered plates Roll meter
1 521 7/26/2020 7/26/2020
position at +6.50m. meter

Roll meter
2 522 Make a jumbo bag floor checkered plates at +12.50m. 7/26/2020 7/26/2020
meter

Making a drawing for jumbo bag silo top anchor bolt.


Roll meter
1 521 Confirming the reinforcement bar as per the design and 7/27/2020 7/27/2020 meter
checking it physically when it is seat on site.

1 Give a confirmation on site for jumbo bag local’s


521 equipment as per the design for the remaining local 7/28/2020 7/28/2020 Caliper meter
equipments.
2
1 Preparing a master spare part list for Side type stacker
221 7/28/2020 7/28/2020
2 ST02

Thomas Teshome
Prepared By Checked By Approve By
321BE07
321BE40
321BF08
321BF32
321BF41
321BF47
321BF48
321CS10a1,a2
321CV29
321CV34-39
321CV45
321LQ04
321PG02
321RM03
321SL44