National Cement Share Company
National Cement Share Company
7/23/2020 7/23/2020
Make a drawing for jumbo bag floor checkered plates
3
position at +6.50m.
Roll meter
2 521 Make a jumbo bag floor checkered plates at +6.50m.
meter
7/25/2020 7/25/2020
Theodolite
Jumbo bag project
2 521 Roll meter
Checking alignment.
meter
Make a drawing for jumbo bag floor checkered plates Roll meter
1 521 7/26/2020 7/26/2020
position at +6.50m. meter
Roll meter
2 522 Make a jumbo bag floor checkered plates at +12.50m. 7/26/2020 7/26/2020
meter
Thomas Teshome
Prepared By Checked By Approve By
321BE07
321BE40
321BF08
321BF32
321BF41
321BF47
321BF48
321CS10a1,a2
321CV29
321CV34-39
321CV45
321LQ04
321PG02
321RM03
321SL44