100% found this document useful (2 votes)
283 views5 pages

1901 - TRI - W44 - Dome Design Sheet - Rev6.1

The document provides details on the design of an overhead water tank, including calculations for the tank capacity and dimensions, design of the top dome, top ring beam, and bottom ring beam. Reinforcement requirements are calculated for each structural element.

Uploaded by

civilceeji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
100% found this document useful (2 votes)
283 views5 pages

1901 - TRI - W44 - Dome Design Sheet - Rev6.1

The document provides details on the design of an overhead water tank, including calculations for the tank capacity and dimensions, design of the top dome, top ring beam, and bottom ring beam. Reinforcement requirements are calculated for each structural element.

Uploaded by

civilceeji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 5

OVER HEAD TANK AT AMC WARD-44, DUKLI

Tank component Design

Tank capacity 1100000 ltr or = 1100 m3


Height of tower from G.L. 21.0 m foundation from G.L. = 3.00 mtr
Live load on Dome 1.50 kN/m2 Finishes load = 0.10 kN/m2
Intencity of wind 1.50 kN/m2 wt of water = 10 kN/mm3
Noumber of columns 12 No. Bearing capcity of earth= 140 kN/m2
Conrete M- 30 wt. of concrete = 24 kN/mm3
scb 7 N/mm2 m = 13
sct 5 N/mm2 Q = 1.000
Steel HYSD fy 500 N/mm2 Tensile stess = 150 N/mm2
Resistance to cracking scb 1.2 N/mm2 scb = 1.7 N/mm2
Nominal cover 25 mm Effective cover = 50 mm

3
2 Design Constants:-For HYSD Bars Cocrete M = 30 wt. of concrete = 24 kN/mm
for water Tank sst = N/mm2 2
150 sst = 230 N/mm
scb =
2
7 N/mm m = 13
k = 0.378 k = 0.283
J = 0.874 J = 0.906
R = 1.156 R = 1.669
3 Dimention of tank:-
D = Inside diameter of tank Assuming the average depth = 0.75 D
We have, p x D2 3
x 0.75 D = 1100 m D "= 15.000 Say 15.00 m
4
\ Height of cylindrical portion of tank = 0.35 x 15.00 = 5.25 m
Depth of conical Dome D/5 or D/6 = 15.00 / 6 = 2.10 m
Diameter of supporting tower = 10 m
Spacing of bracing = 3.5 m

4 Design of top dome :-


Thickness of dome slab = 100 mm or = 0.10 m
Self load of dome = 0.10 x 1 x 1 x 24 = 2.4 kN/m2
Live load = 1.50 kN/m2
finishes = 0.10 kN/m2
Total load = 4.00 kN/m2

If R = radious of dome D = diameter of Tank = 15.00 m r = central rise = D/6= 2.10 m

D/22+r2 7.50 2+ 2.10 2


the radius rtop is given by, R = = or = 14.44 m
2r 2 x 2.10
cos f = 5 / 14.44 = 0.36 or f = 69 degree
p xR1 4.00 x 14.44 =
Meridional thrust at edge 'T'= = 42.40 N/m
1 + cosf 1 + 0.36
1.00 1.00
Circumferential force =wR cose f - = 4.00 x 14.44 x 0.36 - = -21.37 kN/m
cos f 1.36
42.40 x 1000
Meridional Stress = = 0.42 N/mm2 < 5 N/mm2 Safe
100 x 1000
-21.37 x 1000
Hoop stress = = -0.21 N/m2 < 5.00 N/mm2 safe
1000 x 100
The stress are with in safe limit. However provide minimum reinforcement @ 0.3 % of area in each direction.
0.3
\ Ast = x 1000 x 100 = 300 mm 2
100
2
3.14xdia 3.14 x 10 x 10
using 10 mm bars A = = = 78.5 mm2
4 x100 4 x 100
Spacing of hoop Bars = 1000 x 78.5 / 300 = 262 say = 260 mm
Hence Provided 10 mm F bar, @ 250 mm c/c in both circumferenially and meridionally.
OVER HEAD TANK AT AMC WARD-44, DUKLI

5 Design of top ring Beam :-


T1 cos f- D 42.40 x 0.364 x 15.00
Hoop tension'=F1= = = 115.60 kN
2 2
Permissible stress in high yield strenth deformed bars = 150 N/mm2,
115.60 x 1000
Ast = = 771 mm2
150
3.14xdia2 3.14 x 12 x 12
using 12 mm bars A = = = 113 mm2
4 x100 4 x 100
No.of hoop Bars = 771 / 113 = 7 No. say 8.0 No.
Hence Provided 8 No. 12 mm F Ring bar, for symetry.
Actual , Ast = 8 x 113 = 904 mm2
If Ac = cross section of ring beam Equivelent area of composite section of beam
115.60 x 1000
= 1.2 ,\ Ac = 84577 mm2
Ac + m x 904
Provide ring beam 450 x 450 = 202500 mm2
Provide 8 mm f strirrups @ 300 mm c/c to tie the 8 x 12 mm f ring beam.

6 Design of Bottom Ring Beam :-


Load on ring beam:
(A) Load due to top dome = (Meridional trust x sin f )
= 42.40 x sin 69 = 42.40 x 0.934 = 39.58 kN/m
(B) Load due to top ring beam = 0.45 x 0.45 x 24 = 4.86 kN/m
© Load due to cylendrical wall = 0.30 x 5.25 x 24 = 37.8 kN/m
(D) Self load of Ring beam
Assuming Beam 0.80 x 0.45 = 0.80 x 0.45 x 24 = 8.64 kN/m
Total = 90.88 kN/m say 91.00 kN/m
Horizontal force = H = V1 cot f = 91.0 x 1 = 91.00 kN/m
\ Hoop tension Hg =((H x D )/2 =( 91.00 x 15.00 )/ 2.00 = 683 kN/m
Hoop Tension due to water pressure =(( wh.d.D)/2 )
Hw =( 10.00 x 5.25 x 0.45 x 15.00 ) / 2 = 177.188 kN/m
Total Hoop tension = Hg + Hw = 683 + 177.2 = 755.00 kN/m
This to be rested entirely by steel hoops, the area of which is Ash= 2
755 x 1000 / 150 = 5033 mm
2
3.14xdia 3.14 x 16 x 16
using 16 mm bars A = = = 201 mm2
4 x100 4 x 100
No.of hoop Bars = 5033 / 201 = 26 No. say 26 No.
Hence Provided 26 No. 16 mm F Ring bar, for symetry.
2
Actual , Ast = 26 x 201 = 5225 mm
The 10 mm f distribution bars (vertical bars) provided in the wall @ 150 mm c/c should taken
round the above ring to act as strirrups.

7 Design of Bottom Sperical Dome:-


Thickness of Dom slab is assume = 150 mm
Diameter at base of slab = D = 10.00 m
Central rise (1/5 x D) = 2 m
If R = radious of dome D = diameter of base = 10.00 m r = central rise = D/5= 2.00 m
D/22+r2 5.00 2+ 2.00 2
the radius is given by, R = = or R = 7.25 m
2r 2 x 2.00
Self weight of Dome slab = 2x 3.14 x 7.250 x 2.00 x 0.150 x 24.00 = 328.00 kN
Volume of water above the dome is =
2 2
2 6.28 x 7.25 x 2.00 3.14 x 5.00 x
= 3.14 x 5.00 ( 7.4 )- -
3.00 3.00
( 7.25 - 2.00 ) = 494 mm3
\ Weight of water = 494.0 x 10.00 = 4940 kN
\ Total load on dome = 328.0 + 4940 = 5268 kN
Load / unit Length V2 = 5268 / ( 3.14 x 25.00 )= 68 kN/m
Meridional thrust = T = wR/1+cosf cos f = 5.25 / 7.25 = 0.724 \ f = 44 Degree
68 x 7.25
\ T2 = = 286.00 kN/m
1 + 0.724
Meridional Stress = 286.00 x 1000 ) /( 150 x 1000 )= 1.91 < 5.00 N/mm2 safe
1
Circumferential force = wR x cos f -
1+ cosf
OVER HEAD TANK AT AMC WARD-44, DUKLI

1
wR = 68 x 7.25 x 0.724 - = 71.06 kn/m
1.724
\ Hoop strss =( 71.06 x 1000 ) /( 150 x 1000 )= 0.47 < 5.00 N/mm2 safe
0.30 2
Provide nominal reinforcement = x 150 x 1000 = 450 mm
100
2
3.14xdia 3.14 x 10 x 10
using 10 mm bars A = = = 79 mm
2

4 x100 4
Spacing of hoop Bars = 1000 x 79 / 450 = 174 say = 170 mm
Hence Provided 10 mm F bar, @ 125 mm c/c curmferentially and along the meridians.

8 Design of foundation:-
A circular girder with raft slab is provided for tower foundations.
Total load on foundation = 820 x 12 = 9840.0 kN
Self weight of foundation @ 10% = 984.0 kN
Total Load = 24148.00 kN FROM STAAD
Sefe bearing capacity of soil at site = 140.00 kN/m2
\ Area required = 24148 / 140 = 173.00 m2
Providing a raft slab with equal projections on either sideof a circular ring beam and if
\ b = width of raft slab, then = 3.14 x 12 x b = 173.0 or b = 4.59 m
Adopting a raft slab having inner diameter = 10.00 - 5.50 = 4.50 m say b = 5.50 m
and Outer diameter = 10.00 + 5.50 = 15.50 m

Design of circular girder of raft slab


Total load on circular girder = 24148.00 kN
Load per meter run of girder = 24148.00 / ( p x 12 )= 641 kN/m
Refering to moment coeffiecents given in table 4.1, the maximum moment in the circul;ar girder is computed.
maximum negative moment at support. K1.W.R. = 0.0037 x 24148 x 5 = 447 kN.m
maximum positive moment at MID span. K2.W.R. = 0.0014
x 24148 x 5 = 170 kN.m
maximum Torsional moment (at 8.50 from support 0.0017 x 24148 x 5 = 206 kN.m
641 x 5.00 x p/4
Shear force at support section is V = = 1258 kN
2.00
Shear force at section of maximum torsion is
641 x p x 4 x 8.50
V = 1258 - = 878.00 kN
180
The support section is designed for maximum moment
maximum negative moment M = 878.00 kN.m Shear force V = 1258.00 kN
Assuming the width of section = 900 mm
M = 878.00 V = 1258 kN
878 x 1000000
\ d = = 988 mm
1.000 x 900
Adopt depth = 1000 mm cover = 100 mm Over all depth = 1000 mm
Mc 878 x 1000000
Ast = = = 4216 mm2
sst. j.d 230 x 0.906 x 1000
3.14xdia2 3.14 x 25 x 25
using 25 mm bars A = = = 491 mm2
4 x100 4 x 100
No.of Bars = 4216 / 491 = 9 No.
Actual , Ast = 9 x 491 = 4416 mm2
1258 x 1000 2
tv = = 1.40 N/mm
900 x 1000
100 Ast 100 x 4416
% of steel used = = = 0.4906 % \ tc = 0.29 N/mm2
bxd 900 x 1000
Since tc < Tv 0.29 < 1.40 Shear reinforcement required
0.29 x 900 x 1000
Shear taken by concrete = = 261 kN
1000
Balance shear = 1258 - 261 = 997 kN
OVER HEAD TANK AT AMC WARD-44, DUKLI

Using 12 mm f 4 legged strirups, spacing is,


230 x 4 x 113.04 x 1000
sv = = 104 mm
997 x 1000
Hence Provided 12 mm F bar, @ 100 mm c/c center near supports.

Steel required for mid span


Mc 170 x 1000000
Ast = = = 816 mm2
sst. j.d 230 x 0.906 x 1000
0.85 x b.d 1 x 900 x 1000
But minimum steel Ast = = = 1844 mm2
fy 415
3.14xdia2 3.14 x 25 x 25
using 25 mm bars A = = = 491 mm
2

4 x100 4 x 100
No.of Bars = 1844 / 491 = 4 No.
Actual , Ast = 4 x 491 = 1963 mm2

The section subjected to maximum torsional moment and shear should be design for the following forces.
T = 206 kN.m D = 1000 mm
V = 878 kN b = 900 mm
M = 0 d = 1000 mm
1 + D/b 1 + 1000 / 900
Mt = T = 206 x = 256.00 kN.m
1.7 1.7
\ Me1 = M + M1 = 0 + 256 = 256 kN.m
Mc 256 x 1000000
Ast = = = 1229 mm2
sst. j.d 230 x 0.906 x 1000
0.85 x b.d 1 x 900 x 1000
But minimum steel Ast = = = 1844 mm2
fy 415
2
3.14xdia 3.14 x 25 x 25
using 25 mm bars A = = = 491
4 x100 4 x 100
No.of Bars = 1844 / 491 = 4 No.
Actual , Ast = 4 x 491 = 1963 mm2
Equivalent shear Ve = V +1.65T/b = 878 + 1.6 x( 206 / 0.9 )= 1245 kn
1245 x 1000 2
Tv = = 1.38 N/mm
900 x 1000
100 Ast 100 x 1844
% of steel used = = = 0.2049 % \ tc = 0.19 N/mm2
bxd 900 x 1000
Since tc < Tv 0.19 < 1.38 Shear reinforcement required
0.19 x 900 x 1000
Shear taken by concrete = = 171 kN
1000
Balance shear = 1245 - 171 = 1074 kN
Using 12 mm f 4 legged strirups, spacing is,
4 x 113 x 230
sv = = 87 mm
1.38 - 0.19 )x 1000
Hence Provided 12 mm F 4 legged strirrups @ 80 mm c/c center near supports.
Design of Raft Slab:-
Maximum projection of raft slab from face of coloum
5.50 - 1.38
= = 2.058 m
2
24148
Soil pressure = = = 140 kN
p x( 7.75 2 - 2.25 2)
Considring one meter width of raft slab along the circular arc.
w L2 140 x 2.058 2
Maximum Bending moment = = = 297 kN.m
2 2
297 x 1000000
\ d = = 545 mm
1.000 x 1000
Adopt depth = 550 mm cover = 50 mm Over all depth = 550 mm
Mc 297 x 1000000
Ast = = = 2593 mm2 say = 3890 mm2
sst. j.d 230 x 0.906 x 550
3.14xdia2 3.14 x 20 x 20
using 20 mm bars A = = = 314 mm2
4 x100 4 x 100
OVER HEAD TANK AT AMC WARD-44, DUKLI

Spacing of bars = 1000 x 314 / 3890 = 81 say = 80 mm


Hence Provided 20 mm F bar, @ 80 mm c/c to reduce shear stress Ast = 3925 mm2
2
actual steel used = = 1000 x 314 / 80 = 3925 mm
0.12 x 550 x 1000 2
Distribution steel = = 660 mm
100
2
3.14xdia 3.14 x 12 x 12
using 12 mm bars A = = = 113 mm2
4 x100 4 x 100
Spacing
No.of
of bars
Bars = 1000 x 113 / 660 = 171 mm
Hence Provided 12 mm F bar, @ 170 mm c/c to reduce shear stress

Shear force at a section 550 mm from face of columns


V = 140 x 1.5083 x 1.000 = 212 kN.m
212 x 1000
tv = = 0.385 N/mm2
1000 x 550
100 Ast 100 x 3925
% of steel used = = = 0.71 % \ tc = 0.34 N/mm2
bxd 1000 x 550
Since tc < Tv 0.340 < 0.385 Shear reinforcement required