650 8000 650
SCHEDULE OF REINFORCEMENT FOR VEHICULAR UNDERPASS
BAR MARK BAR DESCRIPTION BAR DIA & SPACING Shape of bars 0.3a 0.3a 14 Base Slab
08 21
BASE SLAB Detail - A 200 200
600
700
1 Main Rein.at Bottom 16# @ 150 C/C 1 15
300
300
1200
2 Main Rein.at Top 16# @ 150 C/C 2 10 07 09 10
3 Base Slab Key
3 Distribution rod at Top & Bottom 10# @ 150 C/C 300 Projection
8000 (a)
SIDE WALL
05 05 SECTION 1-1
4 Main Bar Vertical Inner face 16# @ 150 C/C 4 Scale 1:50
04
04
5500
5500 (b)
5 Main Bar Vertical Outer Face 16# @ 150 C/C 5 06
06
6 Distribution rod Both Faces 6 175
10# @ 150 C/C
01 01
6a Main Rod 6a
12# @ 150 C/C
0.3b
0.3b
6b 6b CRASH BARRIER
Distribution rod 12# @ 150 C/C 02 02 03 02 17
1000
TOP SLAB 750 1200 1200 750
700
Main Rein.at Bottom 20# @ 150 C/C 7 TOP SLAB
8
8 Main Rein.at Top 16# @ 150 C/C
2400 2400
01 21
9
600
9 Distribution rod at Top & Bottom 10# @ 150 C/C
10 Haunch Rod
CROSS SECTION
10# @ 150 C/C 10
Scale 1:75
BRACKET WALL
11 SECTION 2 -2
11 Main Bar 12# -5 Nos (ES)
Scale 1:30
12 Horizontal Stirrups 10# @ 300 C/C 12
13 Inclined Bar 12# @ 150 C/C 13
650
BASE SLAB KEY PORTION
13 19
11 20 20mm Thk. ASPHALTIC
14 3500
14 Deck Key rod 10# @ 150 C/C 300 PLUG EXP. JOINT
600
15
300
300
15 Distribution rod 12# @ 200 C/C
600
CRASH BARRIER
150
M15 150 thk. 20 19
16 Main rod - Outer face 12# @ 150 C/C 12
16
17 Main rod - Inner face 16# @ 150 C/C 17
18 Distribution rod 10# @ 11Nos (ES) 18 650
650
APPROACH SLAB
DETAIL - A REIN. DETAIL OF APPROACH SLAB
19 Scale 1:50 Scale 1:50
19 Main rod Transverse direction (T&B) 12# @ 150 C/C REFERENCE DRAWING
20
20 Main rod 3.50m wide direction (T&B) 12# @ 150 C/C 1. NG/GOA-Bypass/VUP/35+535/GAD-04 & 05
21 Open Link (Both Directions) 10# @ 300 C/C 21
EPC Contractor: Safety Consultant:
Client: Ministry of Road Transport & Highways Title: Reinforcement detail for NG - TARMAT JV
Proof Check Consultant: Authority Engineer: Scale:
- Dwg No:
NG/Goa-ByPass/VUP/35+535/Rein-09
Vehicular Underpass Head Office: CHETAN INFRATECH THISA Consulting Services LLP S.N. BHOBE & ASSOCIATES
NG Circle, Mehtapura, CONSULTANTS PVT.LTD. Drawn by : R.D
Project: CH 35+535 Himmatnagar-383001
Flat No. 203, Third Floor , Devi's Mani Nilayam, Checked by : M.K.B M&A/NH-17/Goa By Pass/VUP
Head Office: Corporate Headquarters: File name :
Construction of Margao Western National Highway (Skew 10°) Dist Sabarkantha Gujarat
Near RK Puram Flyover ,Neredmet
Ph: +91 2772 222 404 Corp. Off: No: 7/11, 13th Main Road, Pudhari Bhavan, Sector 30A, Plot Verified by : M.K.B
By-Pass for N.H.17 (New N.H.66)From Km 26/200 BSK 1st stage, Srinagar ,Bangalore-50
Secunderabad -500 056
no.29 to 32,36 & 37 27.10.2016
Design Director : Telengana , India Date
(Ch.00/000)To Km 38/100 (Ch.11/900) in the State Reinforcement Detail Tel:080 26674108 Ph:040 4230 6353
Near Sanapada Railwaystation, Approved by : M.K.D
MUKESH ASSOCIATES E-mail :
[email protected] Vashi,Navi Mumbai – 400 705
of Goa (Panaji - Mangalore Section) Salem-4 Email:
[email protected]