09.VUP Reinf 35+535

1. The document provides details of the reinforcement schedule for an underpass, including the sizes, spacing, and layout of reinforcing bars in the base slab, side walls, and top slab. 2. The main reinforcement bars in the base slab are 16mm diameter bars spaced 150mm centre to centre at the bottom and top. 3. In the side walls, 16mm diameter bars are used as the main vertical reinforcement on the inner and outer faces, spaced 150mm centre to centre, with 10mm diameter bars as distribution bars on both faces also at 150mm spacing. 4. The top slab reinforcement consists of 20mm diameter main bars at the bottom and 16mm bars at the top, both spaced

Uploaded by

Praveen Cyssan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views1 page

09.VUP Reinf 35+535

1. The document provides details of the reinforcement schedule for an underpass, including the sizes, spacing, and layout of reinforcing bars in the base slab, side walls, and top slab. 2. The main reinforcement bars in the base slab are 16mm diameter bars spaced 150mm centre to centre at the bottom and top. 3. In the side walls, 16mm diameter bars are used as the main vertical reinforcement on the inner and outer faces, spaced 150mm centre to centre, with 10mm diameter bars as distribution bars on both faces also at 150mm spacing. 4. The top slab reinforcement consists of 20mm diameter main bars at the bottom and 16mm bars at the top, both spaced

Uploaded by

Praveen Cyssan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

650 8000 650

SCHEDULE OF REINFORCEMENT FOR VEHICULAR UNDERPASS

BAR MARK BAR DESCRIPTION BAR DIA & SPACING Shape of bars 0.3a 0.3a 14 Base Slab
08 21
BASE SLAB Detail - A 200 200

600

700
1 Main Rein.at Bottom 16# @ 150 C/C 1 15

300

300

1200
2 Main Rein.at Top 16# @ 150 C/C 2 10 07 09 10

3 Base Slab Key


3 Distribution rod at Top & Bottom 10# @ 150 C/C 300 Projection
8000 (a)
SIDE WALL
05 05 SECTION 1-1
4 Main Bar Vertical Inner face 16# @ 150 C/C 4 Scale 1:50
04
04

5500

5500 (b)
5 Main Bar Vertical Outer Face 16# @ 150 C/C 5 06
06
6 Distribution rod Both Faces 6 175
10# @ 150 C/C
01 01
6a Main Rod 6a
12# @ 150 C/C

0.3b

0.3b
6b 6b CRASH BARRIER
Distribution rod 12# @ 150 C/C 02 02 03 02 17

1000
TOP SLAB 750 1200 1200 750

700
Main Rein.at Bottom 20# @ 150 C/C 7 TOP SLAB

8
8 Main Rein.at Top 16# @ 150 C/C
2400 2400
01 21
9

600
9 Distribution rod at Top & Bottom 10# @ 150 C/C

10 Haunch Rod
CROSS SECTION
10# @ 150 C/C 10
Scale 1:75
BRACKET WALL

11 SECTION 2 -2
11 Main Bar 12# -5 Nos (ES)
Scale 1:30
12 Horizontal Stirrups 10# @ 300 C/C 12

13 Inclined Bar 12# @ 150 C/C 13


650
BASE SLAB KEY PORTION
13 19
11 20 20mm Thk. ASPHALTIC
14 3500
14 Deck Key rod 10# @ 150 C/C 300 PLUG EXP. JOINT

600
15
300

300
15 Distribution rod 12# @ 200 C/C

600
CRASH BARRIER
150

M15 150 thk. 20 19


16 Main rod - Outer face 12# @ 150 C/C 12
16

17 Main rod - Inner face 16# @ 150 C/C 17

18 Distribution rod 10# @ 11Nos (ES) 18 650


650
APPROACH SLAB
DETAIL - A REIN. DETAIL OF APPROACH SLAB
19 Scale 1:50 Scale 1:50
19 Main rod Transverse direction (T&B) 12# @ 150 C/C REFERENCE DRAWING
20
20 Main rod 3.50m wide direction (T&B) 12# @ 150 C/C 1. NG/GOA-Bypass/VUP/35+535/GAD-04 & 05

21 Open Link (Both Directions) 10# @ 300 C/C 21

EPC Contractor: Safety Consultant:


Client: Ministry of Road Transport & Highways Title: Reinforcement detail for NG - TARMAT JV
Proof Check Consultant: Authority Engineer: Scale:
- Dwg No:
NG/Goa-ByPass/VUP/35+535/Rein-09
Vehicular Underpass Head Office: CHETAN INFRATECH THISA Consulting Services LLP S.N. BHOBE & ASSOCIATES
NG Circle, Mehtapura, CONSULTANTS PVT.LTD. Drawn by : R.D
Project: CH 35+535 Himmatnagar-383001
Flat No. 203, Third Floor , Devi's Mani Nilayam, Checked by : M.K.B M&A/NH-17/Goa By Pass/VUP
Head Office: Corporate Headquarters: File name :
Construction of Margao Western National Highway (Skew 10°) Dist Sabarkantha Gujarat
Near RK Puram Flyover ,Neredmet
Ph: +91 2772 222 404 Corp. Off: No: 7/11, 13th Main Road, Pudhari Bhavan, Sector 30A, Plot Verified by : M.K.B
By-Pass for N.H.17 (New N.H.66)From Km 26/200 BSK 1st stage, Srinagar ,Bangalore-50
Secunderabad -500 056
no.29 to 32,36 & 37 27.10.2016
Design Director : Telengana , India Date
(Ch.00/000)To Km 38/100 (Ch.11/900) in the State Reinforcement Detail Tel:080 26674108 Ph:040 4230 6353
Near Sanapada Railwaystation, Approved by : M.K.D
MUKESH ASSOCIATES E-mail : [email protected] Vashi,Navi Mumbai – 400 705
of Goa (Panaji - Mangalore Section) Salem-4 Email: [email protected]