Built-Up Rate For Plastering: Tender File No: Project
This document provides a quotation for plastering work including material costs and labor rates. Material costs listed include cement, lime, sand, and their costs per bag or load. The plaster mix is specified as cement and sand in a 1:6 ratio. Labor rates given are 8.60 per square meter for internal plastering, 4.92 per running meter for 300mm string external plastering, and 8.60 per square meter for external plastering. Total tender costs provided are 10.29-10.71 per square meter for internal plastering, 5.43-5.55 per running meter for 300mm string external, and 10.71-11.24 per square meter for external plastering.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100%(3)100% found this document useful (3 votes)
2K views2 pages
Built-Up Rate For Plastering: Tender File No: Project
This document provides a quotation for plastering work including material costs and labor rates. Material costs listed include cement, lime, sand, and their costs per bag or load. The plaster mix is specified as cement and sand in a 1:6 ratio. Labor rates given are 8.60 per square meter for internal plastering, 4.92 per running meter for 300mm string external plastering, and 8.60 per square meter for external plastering. Total tender costs provided are 10.29-10.71 per square meter for internal plastering, 5.43-5.55 per running meter for 300mm string external, and 10.71-11.24 per square meter for external plastering.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
BUILT-UP RATE FOR PLASTERING
TENDER FILE NO :
PROJECT :
LOCATION :
SUPPLIER :
SUB-CONTRACTOR :
QUOTATION DATE :
Material Cost
Cement 10.35 per bags 50kg ( Including Rm 0.25 for unloading )
White Lime 3.90 per bags 13kg Plasterlime Lime 2.00 per bags 10kg Sand (ex-mining) 250.00 per loads ( 14 cu. yard ) or 23.48 per m3 Sand (wash fine) 15.00 per cu. Yard 19.50 per m3