Toe Point Cross Point: Note

The document contains calculations for various elements of road design and construction including: 1. Toe and cross point elevations and distances. 2. Intersection point between cut and fill cross sections. 3. PGL elevations in vertical curves on both sides of the road. 4. Area calculations for sample cross sections. It provides ratios, quantities of materials, and calculations for concrete, masonry, plaster and other construction elements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views18 pages

Toe Point Cross Point: Note

The document contains calculations for various elements of road design and construction including: 1. Toe and cross point elevations and distances. 2. Intersection point between cut and fill cross sections. 3. PGL elevations in vertical curves on both sides of the road. 4. Area calculations for sample cross sections. It provides ratios, quantities of materials, and calculations for concrete, masonry, plaster and other construction elements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 18

TOE POINT CROSS POINT

Sr. No. Ele & Dis Calculation Sr. No. Ele & Dis Calculation

1 14.837 H = -0.004 1 640.270 J =


5.850 P = -0.008 0.000 K =
2 10.621 Q = 2810.000 2 640.182 X =
15.000 4.450 Y =
3 10.602 3 640.680
20.000 3.220
4 638.790
Slope = -2.000 Elevation = 10.624 4.000
Distance = 14.277 Elevation =
NOTE : NSL Distance =
Fill Sec. Slope is - VE Cut Sec. Slope is + VE 3
PGL 1 2
4
POINT
Calculation

-0.020
-2.423
3.417
640.202

640.202
3.417
INTERSECTION POINT BETWEEN CUT & FILL X-Sec.
Sr. No. Elevation

1 135.000 PGL Fill Sec.


2 132.150 NSL
3 140.000 NSL Cut Sec.
4 138.450 PGL

Length Between X-Sec. To X-sec. 20.000

First X-sec. Rd. = 250.000

Inter Point, RD 262.955


PGL IN VERTICAL CURVE (LHS) PGL IN VERTICAL CURVE (R
Tangent = 75 Y = -4.019 Tangent =
Next Grade = -9.154 X = 25.000 Next Grade =
Back Grade = 12.28 M = -0.447 Back Grade =
Required Ch. = 00+100 Dis = 50.000 Required Ch. =
Pvc. Ch. = 00+075 L1 = 5011.860 Pvt. Ch. =
Pvi. Ch. = 00+150 A1 = 5011.413 Pvi. Ch. =
Pvi Ele. = 5018.000 Pvi Ele. =

Req. Elevation = 5011.413 Req. Elevation =

Mid Ordinate = -4.019

I.P Elevation = 5013.981

Normal Grade Normal PGL


Rd. 1 = 03+796 IP RD. = 05+725
Elevation 1 = 4781.500 Grade = -6.500
Rd. 2 = 04+053 IP Elevation = 4572.500
Elevation 2 = 4752 Required Rd. = 05+825
Distance = 257.000 Distance = 100
Grade = -11.479 P.G.L = 4566.000
L IN VERTICAL CURVE (RHS)
75 Y = -4.019
-9.154 X = 50.000
12.28 M = -1.786
00+175 Dis = 25.000
00+225 L1 = 5015.712
00+150 A1 = 5013.925
5018

5013.925
AREA OF CROSS SECTION
Sr. No. Elevation Distance
Calculation
1 130.885 0.000
###
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
###
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
###
8 130.508 0.000
9 130.508 -1.300
###
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
5.289 Area of X-Sec.
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300 5.289 Area of X-Sec.
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
AREA OF CROSS SECTION
Sr. No. Elevation Distance
1 130.885 0.000
2 130.848 1.850
3 130.768 3.850
4 129.989 5.407
5 129.983 2.700
6 130.477 2.300
7 130.479 1.900
8 130.508 0.000
9 130.508 -1.300
10 130.402 -1.800
11 130.039 -2.600
12 130.020 -5.347
13 130.768 -3.850
14 130.848 -1.850
15 130.885 0.000
16
17
18
19
20
21
22 5.289 Area of X-Sec.
23
24
25
26
27
28
29
30
31
32
MATERIAL CALCULATION IN Cft MATERIAL CALCULATION IN
Tangent = -0.776 Y

Ratio = 1 = 1 Ratio = 1

Ratio = 2 = 1.5 Ratio = 2

Ratio = 3 = 3 Ratio = 3

Total Qty of Concrete = 1.000 Total Qty of Concrete

Cement Bags / Cft = 0.224 Cement Bags / CM

Sand / Cft = 0.420 Sand / CM

Aggregate / Cft = 0.840 Aggregate / CM

Cement used in Qty. = 0.224 Bags Cement Bags used in Qty.

Sand used in Qty. = 0.420 Cft Sand used in Qty.

Aggregate used in Qty. = 0.840 Cft Aggregate used in Qty.


IAL CALCULATION IN CM

= 1

= 2

= 4

= 1.000

= 6.216

= 15.541

= 31.082

= 6.216 Bags

= 15.541 CM

= 31.082 CM
BRICK MASONRY IN Cft BRICK MASONRY IN CM
Tangent = -0.952 Y

Ratio = 1 = 1 Ratio = 1

Ratio = 2 = 4 Ratio = 2

Total Qty of CFT = 1.000 Total Qty of CFT

Cement Bags / Cft = 0.048 Cement Bags / CM

Sand / Cft = 0.240 Sand / CM

Cement used in Qty. = 0.048 Bags Cement Bags used in Qty.

Sand used in Qty. = 0.240 Cft Sand used in Qty.

Bricks used in Qty. = 13.500 N0# Bricks used in Qty.


ICK MASONRY IN CM

= 1

= 4

= 1.000

= 1.695

= 8.477

= 1.695 Bags 2181

= 8.477 CM

= 500 N0#
CEMENT PLASTER 1/2" THICK IN Sft
Ratio = 1 = 1
Ratio = 2 = 3
Total Qty of Concrete = 1.000
Cement Bags / Sft = 0.013
Sand / Sft = 0.047

Cement used in Qty. = 0.01 Bags

Sand used in Qty. = 0.05 Cft

CEMENT PLASTER 3/4" THICK IN Sft


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / Sft = 0.015
Sand / Sft = 0.075

Cement used in Qty. = 0.02 Bags

Sand used in Qty. = 0.08 Cft

CEMENT PLASTER 3/8" THICK IN Sft


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / Sft = 0.010
Sand / Sft = 0.048

Cement used in Qty. = 0.01 Bags

Sand used in Qty. = 0.05 Cft


CEMENT PLASTER 1/2" THICK IN SM
Ratio = 1 = 1
Ratio = 2 = 2
Total Qty of Concrete = 1.000
Cement Bags / SM = 0.269
Sand / SM = 0.673

Cement Bags used in Qty. = 0.27 Bags

Sand used in Qty. = 0.67 CM

CEMENT PLASTER 3/4" THICK IN SM


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / SM = 0.161
Sand / SM = 0.807

Cement Bags used in Qty. = 0.16 Bags

Sand used in Qty. = 0.81 CM

CEMENT PLASTER 3/8" THICK IN SM


Ratio = 1 = 1
Ratio = 2 = 4
Total Qty of Concrete = 1.000
Cement Bags / SM = 0.161
Sand / SM = 0.807

Cement Bags used in Qty. = 0.16 Bags

Sand used in Qty. = 0.81 CM


STONE MASONRY IN Cft STONE MASONRY IN CM
Tangent = -84723.91 Y

Ratio = 1 = 1 Ratio = 1

Ratio = 2 = 3 Ratio = 2

Total Qty of Concrete = 84724.000 Total Qty of Concrete

Cement Bags / Cft = 0.090 Cement Bags / CM

Sand / Cft = 0.338 Sand / CM

Cement used in Qty. = 7625.16 Bags Cement Bags used in Qty.

Sand used in Qty. = 28594.35 Cft Sand used in Qty.


ONE MASONRY IN CM

= 1

= 3

= 2398.754

= 3.179

= 11.921

= 7625.16 Bags

= 28594.35 CM
EASTING - NORTHING BEARING -
Instrument At = BM-1 Instrument At =
Easting = 68585.709 Easting =
Northing = 41545.956 Northing =
Distance = 543.480 RO =
Bearing = 317.004 Easting =
Northing =
RO = BM-2
Next point Easting ( E ) = Sin Bearing x Distance + Easting = 68215.084 Diffrence of Easting =
Next point Northing ( N ) = Cos Bearing x Distance + Northing = 41943.458 Diffrence of Northing =

Distance =
Baering =

360, 0
E = - ve E = + ve
N = + ve N = + ve
270
E = - ve E = + ve
N = - ve N = - ve
180
BEARING - DISTANCE
BM-1
68585.709
41545.956
BM-2
68215.084
41943.458

-370.625
397.502

SQR (Diff of Easting ^2 + Diff of Northing ^2) = 543.480


Tan x (Diff of Easting / Diff of Northing) =
-1
-42.996

0 - 90 = 2.004
90 - 180 = 137.004
180 - 270 = 137.004
90 270 - 360 = 317.004

DMS$(F19)
DEG(F19)