0% found this document useful (0 votes)
54 views

Customer Training

The document contains a summary of training programs conducted between April 2019 to December 2019. It includes the training subject, start date, end date, duration in days, number of sessions, total participants and number of batches. A total of 13 different training programs were conducted over a period of 9 months training 1,061 participants in 34 batches. The most popular programs were DAVR with 235 participants over 7 batches and maxDNA with 210 participants over 7 batches.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Customer Training

The document contains a summary of training programs conducted between April 2019 to December 2019. It includes the training subject, start date, end date, duration in days, number of sessions, total participants and number of batches. A total of 13 different training programs were conducted over a period of 9 months training 1,061 participants in 34 batches. The most popular programs were DAVR with 235 participants over 7 batches and maxDNA with 210 participants over 7 batches.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Values

Training  Subject Start Date End Date Durations Nos of Session of ParticipaCount of Training  Subject


CNC Programming & Simulation 20‐11‐2019 22‐11‐2019 3 9 30 1

CNC Programming & Simulation Total 3 9 30 1
DAVR 08‐04‐2019 10‐04‐2019 3 9 35 1

24‐04‐2019 26‐04‐2019 3 9 35 1

28‐05‐2019 30‐05‐2019 3 9 35 1

09‐07‐2019 11‐07‐2019 3 9 35 1

04‐09‐2019 06‐09‐2019 3 9 35 1

(blank) (blank) 6 18 60 2

DAVR Total 21 63 235 7
Digital Governor & SCADA System 16‐12‐2019 18‐12‐2019 3 9 30 1

Digital Governor & SCADA System Total 3 9 30 1
IGBT Converters 24‐06‐2019 29‐06‐2019 6 17 30 1

19‐08‐2019 24‐08‐2019 6 17 30 1

25‐11‐2019 30‐11‐2019 6 17 30 1

IGBT Converters Total 18 51 90 3
Mark Vie 10‐06‐2019 12‐06‐2019 3 9 35 1

13‐11‐2019 15‐11‐2019 3 9 35 1

09‐12‐2019 11‐12‐2019 3 9 35 1

(blank) (blank) 6 18 70 2

Mark Vie Total 15 45 175 5
maxDNA 20‐05‐2019 24‐05‐2019 5 15 30 1

01‐07‐2019 05‐07‐2019 5 15 30 1

22‐07‐2019 26‐07‐2019 5 15 30 1

23‐09‐2019 27‐09‐2019 5 15 30 1

04‐11‐2019 08‐11‐2019 5 15 30 1

(blank) (blank) 10 30 60 2

maxDNA Total 35 105 210 7


PADO 17‐06‐2019 19‐06‐2019 3 9 30 1

27‐08‐2019 29‐08‐2019 3 9 30 1

04‐09‐2019 06‐09‐2019 3 9 30 1

PADO Total 9 27 90 3
Valmet DNA 13‐05‐2019 17‐05‐2019 5 15 30 1

14‐10‐2019 18‐10‐2019 5 15 30 1

21‐10‐2019 25‐10‐2019 5 15 30 1

02‐12‐2019 06‐12‐2019 5 15 30 1

Valmet DNA Total 20 60 120 4
VFD 14‐11‐2019 15‐11‐2019 2 6 35 1

VFD Total 2 6 35 1
MAX DNA/New Tech for Upgradation HMI System                                  06‐08‐2019 08‐08‐2019 3 9 30 1

MAX DNA/New Tech for Upgradation HMI System                                  Total 3 9 30 1
maxDNA + DAVR  15‐04‐2019 24‐04‐2019 8 37 16 1

maxDNA + DAVR  Total 8 37 16 1
Grand Total 137 421 1061 34