100% found this document useful (1 vote)
300 views10 pages

Scan FALCON RIGS PDF

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
300 views10 pages

Scan FALCON RIGS PDF

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 10
A > FALCON RIGS COLOMBIA S.A.S. NIT. 900.628.685-6 eee PS ee CERTIFICATE API RP 4G III PETROWORKS S.AS February 9, 2019 CLL. 72 No. 6~ 30 Piso 17 Bogota D.C Colombia NIT: 830116134 PW-112 Mast S/N: FRI-298-10-104 This is a written summary on the certification for the mast PW-118 S/N FRI-298-10-104 under API 4G fourth edition. The inspection was conducted in Barrancabermeja Colombia base Camp Petroworks on February 9" 2019. The purpose of this inspection was to certify under API 4G Cat Ill that the mast is in safe and like new conditions as certification requirements by the OEM. This inspection was performed according with API 4G. After the final inspections were made it \s my opinion that this mast is in good condition and should be able to operate safely at this time, not to exceed the limits set by the original manufacturer. This inspection was performed in accordance to field inspections procedures generally accepted in the oilfield industry with API 4G. Such an inspection, because of its nature, may not disclose every item requiring corrective action and this report is not to be construed as a representation bby Falcon Rigs S.A.S that no item requiring corrective action unless in this report exist. If you have any questions feel free to call Thank you yaKaaa Ronis Pmesioense! Telefono: 6714800 Cel: 318 6013766 / 318 312 1157 / 615 398 6093 Carrera 13 No. 20 - 43 Bucaramanga - Colombia © [email protected] ™ auxiliar@falconri; Scanned by CamScanner Annex B (informative) Well Servicing Masts Visual Inspection Form ‘The form in this annex is intended for free exchange between ownersioperators of the equipment or users of this document. OPERATION, NSPECTION, MAINTENANCE, AND REPAA OF DRUG ANO WELL SERVICING STRUCTURES Well Servicing Masts (Guyed, Carrier\Traller Mounted) ‘Category IV - Visual Feld ine pection Form ‘Type ofinepection performed (check one box ony [Category inspection [7eatesonyvinspection PURPOSE & SCOPE OF INSPECTION: This report form and inspection procedure was developed as a guide formaking {and reporting field inspection in @ thorough and uniform manner. The procedure is intended for use by operating Personnel (or a designated representatve) 0 the extort that itp use satsfies conditions for which an inspection is intended. More detailed and critcal inepectons may be scheduled periodically, or ordered to supplement a program ofthese inspections: masts are used in the upper range of their load limits, or if structures meyhave been subjected ‘o crtical conditions which coula efect safe performance. This form is provided strictly as @ guide, and the API accepts ‘no lability whats osver for its uee of scope. (MARKING DAMAGE: At the ime of inspection, damaged sections or equipment must be clearly and visibly marked 80 that needed repairs maybe made. Abright, contrasting spray paintis suggested for this. Whan repsirs are made, the sible markings should be removed by painting over hem. iis also necessary for the inspector to wile “None” when ‘no damage markings are needed, as tie & hie indication that the tem nas passed inspection. itis recommenced ‘hot inspection be made with assistance of manuiacurers assembly drawing and operating insbuctions. For lems ‘not aecessible or that do not apply. draw a line through the item pertaining to the component Compa _Pefrsuerks SAS Rig Pun-/1 2 Dee OF -CA-~I>Y Lenton Gatescaeye Pac Baswrcchemedvettarsncunr FBlcon Reg s Manufacturers Drawing Avallabie for Use in Inspection: Yes! sO: Manuiacurers Rating QAT20C Heiont_ og! Mast Sent # FRE = 898-10 104 Mast Type One Piece Telescoping_ ye Folding Mast Positon Stanaing Lying down, Disessembled ‘Mast Nameplate on Structure: Yes No Inspecedey: Ponnic dakavh weoresentns “Mlcon (Pas SA.s API REcoMenoeD PRACTICE 4G GuvED MAST ltems that do not need attention should be checked to indicate thatthe item was inspected. tems that are not applicable should be marked in the box a8 "NA" (not applicable). ltems that are warped, wom, damaged, cracked Welds, rusted, bent in need of repair or replacement, or otherwise in need of further attention, mark an "X" in the box ‘and provide comments on the inspected items 7 JoK Ti —]Requres immediate atenion Proud comments rearing 'NA}Not applicable. X2__|Requires attention next move inspected iiems. T]Unade wo eccess Requires atenon nex maintenance [it}iasine "7a—]Requiesaterion whan comenient COMMENTS REGARDING INSPECTED ITEMS 1 Grown Rewombiy 14 Sheaves ‘ Number of Sheaves: Main Cluster Sheave Diameter__ 24’ Hoisting Line Size: _j'+ Fast Line Sheave Diameter: 20"! Condition Main Sheaves: Fastine Sheaves: fe fsarcire shea: IGrooves in Gage: [Wi ]Bearings: seals Line Guards: crease Fitings tr Pin Locke, Winch Line Sre99: JpeBe}Retacting Line Ste |yes: ooo Fab [sheave Material Type: Castiron_ Stee Phenolic Resin Number of Visible Marks Applied: Waar’ —— 2.0 Crown Block Structure ICrown Railing: IGrown Frame: —_A,,_—— 7] Satoy Gate ‘iting, Onieaee Replaced Dating Carpeiliun, Aaa Aebiun ReG ere IGuyine Support Eyes: ne [22 lLoadine Siero ee: Sheave Pedestal Mounts [7,]crown Decking santana ae OSE TETNE trnereer—d [Fat Proton Mune, [WFal Protection Device: Number of Visible Marks Applied Ayre ee 30 Number OPERATION, PECTIN, MAINTENANCE, AYO RERAR OF DRILING AN WELL SERVING STRUCTURES 2 COMMENTS REGARDING INSPECTED ITEMS 4.0 Lower Mast Section |Operators Side Front Leg: [¥2|Operators Side Rear Leg [edo Sie Frontag lon sice Ic Sections Diagonal Bracing: [Back Bracing: v, ¥4 be Latch Assembly (Lock) uy |Cotter Keys in Place: er Mast Hinge Points: a = Stand Pipe Mounts: [Block Hanging Assembly. Leg Adjustment Screws: ¥]Ratng Tags in Place [Telescoping Cinder Stabs; i _§_§_—— Number of Visible Marks Applied Ss Sa eee emeeteeetesenseemen armrest ante 50 Board Tubing Board Frame Frame Hinge Points: Tail Gate Hinge Points B Pease Sper oer yl a ——————————— igen Sse, acest Hand Rails: mee ec rere erro bares SS "14 Safety Cables on Fingers: =n eisretecas a nace na ote aoe Rod Racks (fingers): ——— SSS Load Line Anchor Points SESE Rod Rack Hinge Points: OO support Cables: es ee ee Number of Visible Marks Applied: a 7.0 Pip Racking Platform (Oring Apptations): Frame Staight [vZ]Pin Hole(s): a eee [IPins SS | Safety Pins/Keepers ior ne ima eel LvJframe Welds: —— Working Platform: ——— Landing Platform, a Handrails: SS adder Access. —To_—— ingers Straight Leal NRTRTRENONNNRRINN nang Finger Welas SS Finger Safety Line(s) aa 2 Hoist Mounting Numperof Visible Marks Applied: ee «0 ‘API Recouenoen PracTck 4G cy ca [a push Points: ¥ a o COMMENTS REGARDING INSPECTED ITEMS. Base Mast Section ]Base Section Structure: Diagonal Supports: jumbuckes: Hinge Points: Nast Locking Devoe: |Support Beam langle Adjustment Screws: |Load Adjustment Screws: sible Marks Applied: “pare Main Hydraulic RamfRaising Cylinder pe be inspected during rig-upiig-down operation.) |Cyinder Hinge Points: [Za Hvcreutc Comacions. Hysraulic Hoses: Hinge Pins: Retaining Pins or Locks: Hes hen FA oe 10.0 ‘Telesconing Hyer Ramyinder Cylinder Push Points [1 ]Hydrautic Connections: Hydraulic Hoses: [¥,|Connecting Pins: Retaining Pins or Locks [Telescoping Ram: is [Bleed Vale: | Number of sible Marks Applie: one 120 Tone Counterwekgs (Oring Apiations): Weight Dewce: eaves Shafts: a reines [Cable Clamps: is Number bf Visible Marks Applied: (Oncranion. INSPECTION, MANTENANCE, NO REPAR OF DRLLNG AND WELL SERVICING STRUCTURES “ (COMMENTS REGARDING INSPECTED ITEMS 13.0 Miscellaneous Sheave Assemblies: (Clews/Shackl: Ase Pad-eye, |Sheaves. Bearings: Stats Ti sheave Bott Se Pte Sots Bot Sete Pins [7 -Jerease rttngs [Z]satey Line: Number of Visible Marks Applied: “ 1490 9 Components. [Dead Line Anchor: rack Beam: Front Jack Beam: a a ay Load Line Tumbuckies: Load Line Condition F_ Lose Line Sis [¥TTubing Line Conation [T-Proper Jack Stanas Numberot Visible Marks Applied: rare 150 Corrosion (refer toSection7.2): Little te nwt 18.0 PalgtiCeating |Condition: “Gaede ren ner pata _. 17.0 Should additional inspection or NOT be performed?_A~"C 80, please explain: 2 API RecoMmeNDe0 PRACTICE AG 18.0 Special Comments andlor Pictures: mast TS Tn Lf Boe K cond TF Fe wae PanTabetnt tC

You might also like