A
> FALCON RIGS COLOMBIA S.A.S.
NIT. 900.628.685-6
eee PS ee
CERTIFICATE API RP 4G III
PETROWORKS S.AS February 9, 2019
CLL. 72 No. 6~ 30 Piso 17
Bogota D.C Colombia
NIT: 830116134
PW-112 Mast S/N: FRI-298-10-104
This is a written summary on the certification for the mast PW-118 S/N FRI-298-10-104 under
API 4G fourth edition. The inspection was conducted in Barrancabermeja Colombia base Camp
Petroworks on February 9" 2019. The purpose of this inspection was to certify under API 4G Cat
Ill that the mast is in safe and like new conditions as certification requirements by the OEM.
This inspection was performed according with API 4G. After the final inspections were made it
\s my opinion that this mast is in good condition and should be able to operate safely at this
time, not to exceed the limits set by the original manufacturer.
This inspection was performed in accordance to field inspections procedures generally accepted
in the oilfield industry with API 4G. Such an inspection, because of its nature, may not disclose
every item requiring corrective action and this report is not to be construed as a representation
bby Falcon Rigs S.A.S that no item requiring corrective action unless in this report exist.
If you have any questions feel free to call
Thank you
yaKaaa
Ronis Pmesioense!
Telefono: 6714800 Cel: 318 6013766 / 318 312 1157 / 615 398 6093
Carrera 13 No. 20 - 43 Bucaramanga - Colombia
©
[email protected] ™ auxiliar@falconri;Scanned by CamScannerAnnex B
(informative)
Well Servicing Masts Visual Inspection Form
‘The form in this annex is intended for free exchange between ownersioperators of
the equipment or users of this document.OPERATION, NSPECTION, MAINTENANCE, AND REPAA OF DRUG ANO WELL SERVICING STRUCTURES
Well Servicing Masts (Guyed, Carrier\Traller Mounted)
‘Category IV - Visual Feld ine pection Form
‘Type ofinepection performed (check one box ony
[Category inspection [7eatesonyvinspection
PURPOSE & SCOPE OF INSPECTION: This report form and inspection procedure was developed as a guide formaking
{and reporting field inspection in @ thorough and uniform manner. The procedure is intended for use by operating
Personnel (or a designated representatve) 0 the extort that itp use satsfies conditions for which an inspection is
intended. More detailed and critcal inepectons may be scheduled periodically, or ordered to supplement a program
ofthese inspections: masts are used in the upper range of their load limits, or if structures meyhave been subjected
‘o crtical conditions which coula efect safe performance. This form is provided strictly as @ guide, and the API accepts
‘no lability whats osver for its uee of scope.
(MARKING DAMAGE: At the ime of inspection, damaged sections or equipment must be clearly and visibly marked 80
that needed repairs maybe made. Abright, contrasting spray paintis suggested for this. Whan repsirs are made, the
sible markings should be removed by painting over hem. iis also necessary for the inspector to wile “None” when
‘no damage markings are needed, as tie & hie indication that the tem nas passed inspection. itis recommenced
‘hot inspection be made with assistance of manuiacurers assembly drawing and operating insbuctions. For lems
‘not aecessible or that do not apply. draw a line through the item pertaining to the component
Compa _Pefrsuerks SAS Rig Pun-/1 2
Dee OF -CA-~I>Y
Lenton Gatescaeye Pac Baswrcchemedvettarsncunr FBlcon Reg s
Manufacturers Drawing Avallabie for Use in Inspection: Yes! sO:
Manuiacurers Rating QAT20C Heiont_ og!
Mast Sent # FRE = 898-10 104
Mast Type One Piece Telescoping_ ye Folding
Mast Positon Stanaing Lying down, Disessembled
‘Mast Nameplate on Structure: Yes No
Inspecedey: Ponnic dakavh
weoresentns “Mlcon (Pas SA.sAPI REcoMenoeD PRACTICE 4G
GuvED MAST
ltems that do not need attention should be checked to indicate thatthe item was inspected. tems that are not
applicable should be marked in the box a8 "NA" (not applicable). ltems that are warped, wom, damaged, cracked
Welds, rusted, bent in need of repair or replacement, or otherwise in need of further attention, mark an "X" in the box
‘and provide comments on the inspected items
7 JoK Ti —]Requres immediate atenion Proud comments rearing
'NA}Not applicable. X2__|Requires attention next move inspected iiems.
T]Unade wo eccess Requires atenon nex maintenance
[it}iasine "7a—]Requiesaterion whan comenient
COMMENTS REGARDING INSPECTED ITEMS
1 Grown Rewombiy
14 Sheaves ‘
Number of Sheaves: Main Cluster Sheave Diameter__ 24’
Hoisting Line Size: _j'+ Fast Line Sheave Diameter: 20"!
Condition
Main Sheaves:
Fastine Sheaves:
fe fsarcire shea:
IGrooves in Gage:
[Wi ]Bearings:
seals
Line Guards:
crease Fitings
tr Pin Locke,
Winch Line Sre99:
JpeBe}Retacting Line Ste |yes: ooo
Fab
[sheave Material Type: Castiron_ Stee Phenolic Resin
Number of Visible Marks Applied: Waar’ ——
2.0 Crown Block Structure
ICrown Railing:
IGrown Frame: —_A,,_——
7] Satoy Gate ‘iting, Onieaee Replaced Dating Carpeiliun, Aaa Aebiun ReG ere
IGuyine Support Eyes: ne
[22 lLoadine Siero ee:
Sheave Pedestal Mounts
[7,]crown Decking santana ae OSE TETNE trnereer—d
[Fat Proton Mune,
[WFal Protection Device:
Number of Visible Marks Applied Ayre
ee
30
NumberOPERATION, PECTIN, MAINTENANCE, AYO RERAR OF DRILING AN WELL SERVING STRUCTURES 2
COMMENTS REGARDING INSPECTED ITEMS
4.0 Lower Mast Section
|Operators Side Front Leg:
[¥2|Operators Side Rear Leg
[edo Sie Frontag
lon sice
Ic Sections
Diagonal Bracing:
[Back Bracing:
v,
¥4
be Latch Assembly (Lock)
uy
|Cotter Keys in Place: er
Mast Hinge Points: a =
Stand Pipe Mounts:
[Block Hanging Assembly.
Leg Adjustment Screws:
¥]Ratng Tags in Place
[Telescoping Cinder Stabs; i _§_§_——
Number of Visible Marks Applied Ss
Sa eee emeeteeetesenseemen armrest ante
50 Board
Tubing Board Frame
Frame Hinge Points:
Tail Gate Hinge Points
B
Pease Sper oer
yl
a
———————————
igen Sse,
acest
Hand Rails: mee ec rere erro
bares SS
"14 Safety Cables on Fingers: =n
eisretecas a
nace na ote
aoe
Rod Racks (fingers): ——— SSS
Load Line Anchor Points SESE
Rod Rack Hinge Points: OO
support Cables: es ee ee
Number of Visible Marks Applied: a
7.0 Pip Racking Platform (Oring Apptations):
Frame Staight
[vZ]Pin Hole(s): a eee
[IPins SS
| Safety Pins/Keepers ior ne ima eel
LvJframe Welds: ——
Working Platform: ———
Landing Platform, a
Handrails: SS
adder Access. —To_——
ingers Straight Leal NRTRTRENONNNRRINN nang
Finger Welas SS
Finger Safety Line(s) aa 2
Hoist Mounting
Numperof Visible Marks Applied: ee«0
‘API Recouenoen PracTck 4G
cy
ca
[a push Points:
¥
a
o
COMMENTS REGARDING INSPECTED ITEMS.
Base Mast Section
]Base Section Structure:
Diagonal Supports:
jumbuckes:
Hinge Points:
Nast Locking Devoe:
|Support Beam
langle Adjustment Screws:
|Load Adjustment Screws:
sible Marks Applied: “pare
Main Hydraulic RamfRaising Cylinder
pe be inspected during rig-upiig-down operation.)
|Cyinder Hinge Points:
[Za Hvcreutc Comacions.
Hysraulic Hoses:
Hinge Pins:
Retaining Pins or Locks:
Hes
hen
FA oe
10.0
‘Telesconing Hyer Ramyinder
Cylinder Push Points
[1 ]Hydrautic Connections:
Hydraulic Hoses:
[¥,|Connecting Pins:
Retaining Pins or Locks
[Telescoping Ram:
is
[Bleed Vale:
|
Number of sible Marks Applie: one
120 Tone Counterwekgs (Oring Apiations):
Weight Dewce:
eaves Shafts: a
reines
[Cable Clamps:
is
Number bf Visible Marks Applied:(Oncranion. INSPECTION, MANTENANCE, NO REPAR OF DRLLNG AND WELL SERVICING STRUCTURES “
(COMMENTS REGARDING INSPECTED ITEMS
13.0 Miscellaneous Sheave Assemblies:
(Clews/Shackl:
Ase Pad-eye,
|Sheaves.
Bearings:
Stats
Ti sheave Bott
Se Pte Sots
Bot Sete Pins
[7 -Jerease rttngs
[Z]satey Line:
Number of Visible Marks Applied: “
1490 9 Components.
[Dead Line Anchor:
rack Beam:
Front Jack Beam:
a
a
ay
Load Line Tumbuckies:
Load Line Condition
F_ Lose Line Sis
[¥TTubing Line Conation
[T-Proper Jack Stanas
Numberot Visible Marks Applied: rare
150 Corrosion (refer toSection7.2): Little te nwt
18.0 PalgtiCeating
|Condition: “Gaede ren ner pata
_.
17.0 Should additional inspection or NOT be performed?_A~"C 80, please explain:2
API RecoMmeNDe0 PRACTICE AG
18.0 Special Comments andlor Pictures:
mast TS Tn
Lf Boe K cond TF
Fe wae PanTabetnt tC