Likelihood
Likelihood
Risk Level
Risk Level
( If the Hazard is Released )
Severity
Severity
Class
Class
Prevention & Mitigation Recovery Measures
1 Working at same High Risk Toxic gases Personnel injury B 4P B4 M Conduct TBT before starting job, identify the activity steps hazards and ensure ERP, B 1P B1P L
levels (High Risk areas) Flammable Respiratory disorders P all involved parties are involved in the TBT. MEDEVAC,
areas) Dust Back injury / strain / sprain Obtain an approved work permit prior to performing any task which requires Medical
Noise Eye irritation PTW. facilities
Exhaust Fumes Fatigue Ensure that all the gas detection systems are working properly and in good
Hot atmosphere Deafness condition.
Sharp objects Chemical burns That 30 min SCBA and escape sets are available and ready for use.
Slippery surfaces Ensure that there is designated area for smoking at work site
Inadequate lighting Separate all flammable liquids and gasses from other material.
Provision of firefighting equipment
Equipment such us pumps, engines electrical panels should be provided with
auto shut down systems when over heat happens.
Provision of PPE’s
Provision of suitable hand tools to minimize hands and fingers exposure.
Provision of safety equipment layout
Emergency Drills (Fire, H2S, Rescue from height and first aid)
Provision of anti-slippery Surface.
Provision of mandatory trainings and awareness.
Provision of deferent JSA and work instructions
Hazard ID books
Use of PTW system
Summer mitigations (Shades, coolers, rest areas and etc.)
Safety sign boards