BASIC EDUCATION SCHOOLS
Urbiztondo, San Juan
La Union, Philippines, 2514
ACTION PLAN FOR RESEARCH OUTPUT IMPLEMENTATION
RESEARCH TITLE
Programs/ Strategies/ Activities Persons Involved Time Frame Resources Needed Expected Outcome
Projects
1. Community PRE-IMPLEMENTATION Barangay Officials
Seminar on Assessment of Local disaster risks in cooperation with Disaster information which
Disaster Risk and hazards City Disaster Risk will be the basis of future
Reduction and Initial planning Reduction and risk reduction and
Management for Schedule seminar facilitator, Management Office, management plans
residents resource speakers and facility Bureau of Fire Coherent and objective
Confirm respondent participation Protection and Red based framework for the
Use of risk information in Cross conduct of the seminar
developing courses of action Smooth flow of events
specific to all possible disaster with the presence of
scenarios knowledgeable speakers
and facilitators and facility
which can accommodate
all participants
Estimation of participants
to predict number of
equipment and amount of
space needed.
Effective data and plans to
present to the residents
attending
IMPLEMENTATION PROPER Disaster experts as
Course Program Resource speakers Basic knowledge for all
Introduction of disaster Barangay Officials residents regarding various
management as facilitators types of disasters they
DRM: terminologies, disaster risk Residents as could possibly encounter
management cycle, key concepts participants and how to deal with these
Discussion of barangay hazard Awareness of their and
assessment and vulnerability everyone else’s role in
results managing a disaster and
Stakeholders’ and residents’ roles which authorities to contact
(reinforcing residential structures, if needed
providing emergency kits) Dissemination of the
Discussion of Barangay barangay plans for
preparedness plans and evacuation disasters
routes Self- reliant residents in
First aid training times of need
POST-IMPLEMENTATION City Disaster Risk Venue/ Location Reinforce what the
Dry run exercises for residents Reduction and on where will the residents have learned
(earthquake, fire and flood drills) Management Office dry run exercises through the seminar and
Bureau of Fire would be awareness of how to apply
Protection conducted, them in different situations
2. Household PRE-IMPLEMENTATION Barangay Officials For residents to be able to
preparedness Dissemination of information and Local prepare and repair their
inspections regarding safety residential Government Unit own houses before
structure standards inspection
Provision of emergency kits and To provide necessary
goods goods to those who could
Preparation period for application not afford them
of information from the seminar Ensure that the residents
have been given time to
prepare for their own
household
IMPLEMENTATION Disaster Experts
Personal house to house visitation from City Disaster To reassure the accuracy
and inspection of safety of structures Risk Reduction and and effectivity of
and presence of emergency kits. Management Office community efforts
assisted by
barangay officials
POST- IMPLEMENTATION Bureau of Fire To regularly check that the
Semiannual inspection Protection and City residents have not been
Annual disaster drills Disasters Risk slacking of and are
Reductions and continuing to improve
Management Office disaster preparedness
with residents’ plans
participation To refresh basic what-to-
dos during disasters
3. Establishing PRE- IMPLEMENTATION CDRRMO, LGUs Budget proposal
uniform advisory Mapping evacuation routes around and Barangay
signals and the settlement area, including officials
installation of nearest medical facilities and
warning/ alarm evacuation centers
systems Purchase of applicable devices
(Sound alarms, flood and sea level
markers)
Review of effective national and
local advisory systems (color and
numerical signals coinciding with
severity of disasters)
IMPLEMENTATION Barangay Officials
Effective dissemination of advisory
systems to all residents
Posting of evacuation route maps
in common public areas
Installation of sound alarm devices
and flood markers around the
premises
POST- IMPLEMENTATION Barangay Officials
Review of residents’ knowledge of and residents
evacuation routes through fire,
typhoon and earthquake drills
Test trials of installed devices
4. Replacement/ PRE- IMPLEMENTATION Municipal Engineer 2 months to 3 Budget Proposal Awareness of the people
Upgrade/ Tracing of infrastructures that are in collaboration with months Barangay map for regarding the
Modification of prone to disasters in the community the DPWH Officers plotting purposes infrastructures located in
identified at-risk that includes bridges, drainage Region 1 and the Blueprints their community that are at
infrastructures systems, road networks, shelters, Barangay officials List of needed risk to causing harm and
and electric posts. resources. can contribute to the
Project planning (budget proposal, effects of disasters whether
structural designs, needed natural or man-made.
resources, relocation program for Fortifying residents to
the affected residents) further practice safety
Procuring of resources/ materials precautionary measures on
that will be used in the construction/ making them away from
replacement/ renovation or disaster vulnerability.
modification of the identified at risk
infrastructures.
IMPLEMENTATION Municipal 1 1/2 years to 2 Financial plan Strengthens the bond
Preliminary construction/ Engineering office in years Construction- between the officials and
renovation of the identified disaster association with the related labor, the members of the
prone infrastructures. Regional DPWH; materials and barangay promoting
Residence relocation for the Barangay Officials equipment cooperation and teamwork
families or households that are and Residents Relocation Site between them whether in
affected by the construction project. times of disasters or not.
POST IMPLEMENTATION Municipal 1 week Quality Control To ensure the
Quality Assurance and Quality Engineering office Services convenience, quality and
Control inspection regarding the Quality control (Engineering) safety of the new
constructed infrastructures’ quality inspectors in infrastructures for the
and safety standards. association with the people living in the
Regional DPW and community to use.
officials of the
barangay.
Prepared by: Reviewed by: Approved:
ANTONETTE ONGNGAD ELIZABETH R. CAMARA
JERICHO PADUA Research Adviser Director, Basic Education Schools
JUNELL TADINA
ALZIEA ALVIAR Noted by:
SHAYNE GRACE DINGLI
Researchers JEROME B. VLLANUEVA
Academic Head, Senior High School