Project Name P22-02 Project Code - : P22-XX-XX-SP-K-BEP Pre - Contract BIM Execution Plan (BEP)
Project Name P22-02 Project Code - : P22-XX-XX-SP-K-BEP Pre - Contract BIM Execution Plan (BEP)
P22-02
Project Code - P22-XX-XX-SP-K-BEP
Approval Record
By: xx Date: xx
Apr: xx Date: xx
Revision Record
Rev Date Revision Details Rev by
xx xx xx xx
Created in collaboration by
Endorsed by
Project Name 350-03
Document Ownership
This document should be compiled and completed by the [project team as a collaborative submission], reviewed with all
key project stakeholders.
This document requires the completion of the Model Production Delivery Table (Appendix 1) and the Asset Information
Requirements (Appendix 2), which are to be developed and completed with the assistance and input from the Design Team,
FM Team, Clinicians and other key stakeholders with an interest in or benefiting from the implementation of BIM on the
scheme after handover.
Appendix 1 (MPDT) and Appendix 2 (AIR) hold blank templates for development and completion as described above.
Please refer to the P22 Client BIM Implementation Kit for worked examples of the same. These tables need to be made
project specific. The MPDT is to be developed and completed for all BIM projects. AIR is to be completed and developed
where data for support of FM (or other BIM uses) is required on the project.
Document Authority
Once completed, this document will define the requirements of different stakeholders that will become part of the project
delivery team at different stages of the development of project. In first instance, the requirements made within this document
are to be reviewed by the Client appointed consultants and included in their appointments.
The document should be returned as part of the Contractors tender information. At such stage, this document shall be
agreed by all the representatives of the project team, with the authority of their contracting organisation to accept this
document as the Pre Contract BIM Execution Plan (BEP) as referenced in the Terms of Engagement or subcontracts. This
acceptance also confirms that the relevant supply chains personnel have read and understood its requirements.
Contents
1 General Project Information ............................................................................................................... 4
2 BIM PROCUREMENT AND EMPLOYER ENGAGEMENT ................................................................... 7
2.1 Document Purpose ............................................................................................................................................... 7
2.2 Document Structure .............................................................................................................................................. 7
2.3 Response to EIR ................................................................................................................................................... 7
2.4 BIM Vision and Objectives .................................................................................................................................... 7
3 INFORMATION MANAGEMENT .......................................................................................................... 9
3.1 Levels of Definition ............................................................................................................................................... 9
3.2 Training Requirements ......................................................................................................................................... 9
3.3 Planning of Work and Data Segregation .............................................................................................................. 9
3.4 Co-Ordination and Clash Detection .................................................................................................................... 11
3.5 Collaboration Process ......................................................................................................................................... 13
3.6 Health & Safety and Construction Design Management .................................................................................... 14
3.7 Security ............................................................................................................................................................... 15
3.8 Delivery of Information Requirements(should this be called AIR?) .................................................................... 15
3.9 System Performance .......................................................................................................................................... 16
3.10 Compliance Plan ................................................................................................................................................. 17
3.11 Levels & Coordinates .......................................................................................................................................... 18
3.12 Software Platforms ............................................................................................................................................. 18
4 COMMERCIAL MANAGEMENT ......................................................................................................... 20
4.1 Information Exchange ......................................................................................................................................... 20
4.2 Strategic Information Purposes .......................................................................................................................... 20
4.3 Responsibilities Matrix ........................................................................................................................................ 21
4.4 Applicable Standards .......................................................................................................................................... 24
4.5 Schedule of Contract Delivery Changes ............................................................................................................. 25
5 COMPETENCE ASSESSMENT .......................................................................................................... 26
5.1 Project Implementation Plan (PIP) ..................................................................................................................... 26
5.2 Capability Assessments...................................................................................................................................... 26
6 Appendices ........................................................................................................................................ 27
7 Glossary of Abbreviations and Terms ............................................................................................. 28
Client Name
Project Name
Site Name
Building Name
Building Description
Site Description
Project Address
Type of asset
Form of Contract
Project Number
Design Start:
Site Construction Start:
Site Completion / Handover:
Project EIRs:
Project Description:
Plan preventative maintenance Via CAFM tools with easy access to Employer/ FM Provider
information
Efficiently execute reactive By having better access to reliable Employer/ FM Provider
maintenance information
Standardise services and streamline Utilising information to make better Employer/ FM Provider
processes decision quickly and efficiently
Improve long-term planning of Utilising information to make better Employer/ FM Provider
service requirements against budgets decision quickly and efficiently
to ensure alignment with core
business needs
3 INFORMATION MANAGEMENT
3.1 Levels of Definition
Level of Definition is used to determine both the level of geometry detail (LOD), and level of associated information (LOI)
for any given model element at an agreed project work stage. Defining LOD and LOI informs suppliers of the degree of
information reliability when using the model.
Further guidelines on Level of Definition are available at https://toolkit.thenbs.com/definitions.
The project Level of Definition requirements, delivery work stages, and model originators are as outlined in the Model
Production and Delivery Table (MPDT) and post contract Master Information Delivery Plan (MIDP)
The project information requirements are as outlined in the Asset Information Requirements (AIR) appended to this
document. The LOI requirement for each asset element will be delivered using the COBie UK – 2012 (Construction
Operations Building information exchange) schema in accordance with BS 1192-4:2014.
*Extend as required to include details of all training requirements for successful project delivery.
Model management
Insert any specific model management requirements here
Naming Conventions
Insert details of any specific naming conventions here.
Note: Naming conventions should follow BS1192:2007+A2:2016 for Files and Layers (provide examples)
Publishing Processes
Insert specific publishing process here or refer to separate guidance document.
The Employer expects all suppliers to work in a collaborative manner utilising intelligent 3D geometry models. Supplier’s
3D model will be the originating source for drawing production. Object standards shall align with BS 8541:1,3,4 and BS
8541-2 for project 2D symbols.
Technical limitations of production hardware and software systems should be identified and recorded in the BEP during
the initial planning of work and data segregation phase.
Technical Limitations
Insert any specific technical limitations and mitigating factors here.
Software Utilisation
Review Insert details of how task teams and client team interact
with federated model and review issues.
Lead Consultant Task Team A (Arch) Task team B (###) Employer Contractor
Undertakes internal clash Undertakes internal clash
Issues Models to CDE for
Issues Models to CDE detection and coordination detection and coordination Receives Models via CDE
CDP elements
prior to issue prior to issue
Federates Models
provided by Task Teams Reviews federated model Reviews federated model Reviews coordination Reviews federated model
from CDE from CDE report from CDE
(inc sub contractors)
Undertakes Visual Issue Undertakes Visual Issue Undertakes Visual Issue Undertakes Visual Issue
detection utilising detection utilising federated detection utilising federated detection utilising
federated model model model federated model
Undertakes clash
Contributes and
detection utilising Brings any issues to Brings any issues to
prioritises issues to
specialist software to Coordination meeting Coordination meeting
Coordination meetings
agreed workflow
Reviews report and BIM Reviews report and BIM Reviews report and BIM
Issues Coordination
Issues prior to BIM Issues prior to BIM Issues prior to BIM
report
coordination meeting coordination meeting coordination meeting
Issues BCF file of BIM Comments on issues at BIM Comments on issues at Comments on issues at
issues coordination meeting BIM coordination meeting BIM coordination meeting
Makes adjustments to
Attends and leads BIM Adjust models based on Adjust models based on
models based on project
Coordination Meeting project team feedback project team feedback
team feedback
Records issue
management at BIM
Coordination Meeting
Tolerance Strategy
Delivery will be undertaken through regular sharing of model data as outlined in the BEP in the form of native files and
other agreed exchange formats. Prior to sharing all data shall be checked, approved and validated as ‘Issued for
coordination” in the CDE in line with the BS1197:2007+A2:2016 and PAS1192-2:2013+A1 status codes.
Model federation, coordination and reporting responsibilities shall align with information exchange activities and roles
outlined in PAS1192-2:2013+A1, Table 2.
Item Link
The project CDE set up and management shall align with activities, roles and responsibilities as outlined in PAS1192-
2:2013+A1,Table 2.
Frequency and details of model review workshops and other collaborative working practices
Meeting Type Description Frequency Participants Location/Time
BIM Strategy Meetings to establish project aims All Key BIM
BIM Strategy Meetings Project Inception < Complete>
and ambitions. Personnel
Geometry Validation To ensure validation of the As Built Vs Virtual At set All Key BIM
< Complete>
Meetings Model milestones Personnel
Data Drop (Information To align with information exchange dates to At Set All Key BIM
< Complete>
Exchange) meetings ensure successful handover of information Milestones Personnel
Once
To discuss, agree and formalise digital handover (Align with All Key BIM
PIM to AIM Handover agreed < Complete>
requirements Personnel
information
exchange)
Additional Meetings as
< Complete>
project requires
Note: Meetings can be combined, however there should be a clear distinction between topics to ensure meeting achieves goals.
Frequency and details of design / employer team reviews using the federated model/ data
Insert frequency and details of design / employer team reviews using federated model/ data
Schedule of work stages and overview of key H&S deliverables against each stage
Insert schedule of work stage and overview of key H&S deliverables against each stage
The model development and structured delivery of information should enable the following uses under CDM2015:
3.7 Security
This section details the process set out for monitoring, managing and complying with the Employers security mandate,
including adherence to any standard or processes for data sharing.
All supply chain organisations are required to adopt the security requirements as detailed in the project BIM execution
plan.
The following security standards should be followed in respect of the proposed BIM project, defined in accordance with
the business impact levels as prescribed in the HMG Security Policy Framework
Insert proposed methodology and process for best delivery of the Employers required asset information and associated
Master Information Delivery Plan post contract award.
Model authors should ensure that the model will be modelled and edited as per construction sequence it may be further
used downstream for 4D and 5D purposes for which this is critical. It is also critical that the model represents how the
project is to be estimated and constructed. Elements must be modelled as they will be constructed and/or delivered (i.e. in
an as-built state), not in an analytical state. Elements should never overlap. If elements overlap they will cause clashes
(false positives) and generate false quantities during take-off. We have solutions for identifying and eradicating any clashes
but all stakeholders should aim to avoid creating clashes from the outset to streamline the design process. Please note the
following good practice points.
● Elements are to be modelled and classified correctly i.e. a roof is a roof not a floor.
● Elements are to be replaced not deleted and re inserted to maintain GUID/ BATID
● Architectural spaces are to be complete and accurate to match client/ CAFM requirements.
Insert details of Quality assurance/ control procedures (Verification/ Validation of Geometry and Data)
Note: This section should include detail of pre/ post construction surveys to ensure as constructed asset reflects the
virtual asset including details of any rectification workflows. Details of any existing legacy data use should also be
provided.
Associated software
Insert details of associated software
Period of Aftercare the number of years the model should be managed for (IF APPLICABLE)
Insert details of aftercare (if applicable)
Change Control
Insert details of change control process
The Employer / Employers Information Manager shall be granted access to the project CDE to enable regular compliance
monitoring and audits.
Compliance Plan for Compliance Plan for Compliance Plan for Compliance Plan for Compliance Plan for BIM
Project Delivery Manager Information Manager Lead Designer Task Team Managers Implementation Manager
Comply with the Comply with the Comply with the Comply with the Comply with the
requirements of the BEP requirements of the BEP requirements of the BEP requirements of the BEP requirements of the BEP
(this document) (this document) (this document) (this document) (this document)
Host meetings scheduled Validation of model Generate federated model Issue information in agreed Develop and maintain Post
in section 3.5. Information utilising for coordination review formats to the CDE at the Contract BEP (this
manual and automated process (all models are to agreed frequency. document)
means. be aligned with agreed
Suppliers with asset data deliverables should align their model attributes consistent with the data exchange format
outlined in BS 1192-4:2014.
4 COMMERCIAL MANAGEMENT
4.1 Information Exchange
This section communicates the timing and content of information exchanges between the Project Team / Supplier and the
Employer and how information exchanges are aligned to work stages. Information may flow both ways.
The NHS Trust work to the RIBA Plan of Work 2013. At a project level, the frequency of required information exchanges
will be defined in further detail within the project AIR & MIDP. Whilst information can be shared at any time during the
course of a stage, formal published information deliverables should be exchanged prior to the end of a stage to advise the
decision gateways, as indicated by the project MIDP.
Information deliverables required at each information exchange will be as defined by the project MIDP. In general, those
information deliverables range from files that may consist of any of the following:
●
COBie as a transmittal sheet (project directory, facility, docs and component tabs as a minimum).
●
Native and PDF documents (reports, schedules)
●
3D Models – in their native discipline (un-federated) and in open standard IFC format.
●
Drawings – cut from the models, and other documents, in PDF and DWG format
●
Structured data – manual input or from models, in BS1192-4: 2014 format, all exchanged as files and
referenced in the COBie transmittal sheet, to be issued in both IFC and XLS format.
COBie-BS1192-4:2014 excel sheet data structure shall be used as the default exchange format for all project related
information whether 3D modelling is involved or otherwise. For all mandated projects the expectation shall be for the
following COBie-BS1192-4 tabs to be completed as a minimum:
Insert project specific Information Exchange requirements here in line with the Project AIR
Site evaluation
Feasibility Study
Visualisation Visualisation Visualisation
Stakeholder Stakeholder Stakeholder
engagement engagement engagement
Design Authoring
Coordination
Structural Analysis
Lighting Analysis
Energy Analysis
Sustainability
Assessment
Statutory Compliance
Site Logistics (4D) Site Logistics (4D)
H&S Planning H&S Planning
Cost Management Cost (QTO) Cost (QTO)
CDM2015 CDM2015 CDM2015 CDM2015 CDM2015
Off Site manufacture
As-Built Asset data
Soft Landings Soft Landings
Planned Maintenance Planned Maintenance
Scheduling Scheduling
Lifecycle Analysis Lifecycle Analysis Lifecycle Analysis Lifecycle Analysis Lifecycle Analysis
Asset Management
Facilities
Management
Space Management
Post Occupancy
Evaluation (POE)
Project Information Name and Organisation – ● Enable reliable ● Accept / reject TBC
Manager (PIM) Refer to Project Directory information exchange information exchanges
through the CDE within the common
● Maintain and receive data environment
information into the ● No design
Information Model responsibility or right to
● Enable integration and issue instructions
co-ordination of
information within
Information Model
● Configure information
for Project Outputs
● Populate the
information exchange
format for the
Information Model
Lead Designer Name and Organisation – ● Co-ordinated delivery of ● Confirm status and LD
Refer to Project Directory all design information approve information for
● Manage information issue within the CDE
development and ● Approve design
information approvals changes proposed to
● Confirm design resolve clashes
deliverables
● Overall lead for
configuration
management
Task Team Manager(s) Arch - Name and ● Production of design ● Issue approved TTM(s)
(TTM) Organisation – Refer to outputs related to a information within the
Project Directory discipline specific, CDE
package based or time-
Struct - Name and based task
Organisation – Refer to ● Approval of Task Team
Project Directory Information prior to
MEP - Name and Sharing to the CDE
Organisation – Refer to
Project Directory
Task Information Arch - Name and ● Direct the production of Confirm that information is TIM(s)
Manager(s) (TIM) Organisation – Refer to task information in suitable for issue within the
Project Directory compliance with CDE
standards and methods
Struct - Name and
● Direct the production of
Organisation – Refer to
task information using
Project Directory
agreed systems
MEP - Name and
Organisation – Refer to
Project Directory
Information Author(s) Arch - Name and ● Develop constituent Inform
Organisation – Refer to parts of the information ation
Project Directory model in connection Author(
with specific tasks s)
Struct - Name and
● Production of project
Organisation – Refer to
outputs
Project Directory
MEP - Name and
Organisation – Refer to
Project Directory
Interface Manager(s) Arch - Name and ● Manage spatial co- Propose resolutions to Interfac
Organisation – Refer to ordination on behalf of a clashes e
Project Directory task team Manag
● Propose resolutions to er(s)
Struct - Name and
co-ordination clashes
Organisation – Refer to
Project Directory
MEP - Name and
Organisation – Refer to
Project Directory
Information Originator Arch - Name and ● Develop constituent Ownership of model Inform
Organisation – Refer to parts of the information information ation
Project Directory model in connection
BS1192:2007 ☐
PAS1192-2:2013 ☐
PAS1192-3:2014 Lifecycle ☐
BS1192-4:2014: COBie ☐
PAS1192-5:2015 Security ☐
PAS1192-6:2018 Health and Safety
BS8536-1:2015 Facilities Management ☐
BS8541-1, 2, 3, 4, 5, 6 Library management ☐
BS7000-4:2013 Design Management ☐
Uniclass 2015 Classification* ☐
RIBA Plan of Works 2013 ☐
BIM Toolkit (DPoW), including Level of Definition* ☐
CIC BIM Protocol 2ND Edition 2018 ☐
Other – State here ☐
* Under development (date stamped tables will be issued and are to be adhered to by all model
authors)
Provide any clarity required on changes to standard roles, responsibilities and competences.
Provide any additional information regarding changes to CIC BIM protocol and IP Changes requested by Insurers and full
descriptions of amendments and reasons.
5 COMPETENCE ASSESSMENT
5.1 Project Implementation Plan (PIP)
Supply Chain Capability Summary
Insert Supply Chain Capability Summary (PAS 6.3.2)
6 Appendices
EIR Employer’s information requirements - Pre-tender document setting out the information to
be delivered, and the standards and processes to be adopted by the supplier as part of the
project delivery process
Federated model A federated model is an assembly of distinct models or design disciplines, to create a single
complete model of the building. Eg Architectural, Structural and Mechanical models may
be viewed in a single ‘federated’ model.
Graphical data Data conveyed using shape and arrangement in space
Level of Definition Collective term used for and including “level of model detail” and the “level of model
information”
MIDP Master information delivery plan - Primary plan for when project information is to be
prepared, by whom and using what protocols and procedures, incorporating all relevant
task information delivery plans
Pre-contract BEP The pre-contract BEP is to demonstrate the supplier’s proposed approach, capability,
capacity and competence to meet the EIR. It is utilised prior to the appointment of any
stakeholder.
Post-contract BEP The post-contract BEP is the document defining standard methods and procedures
adopted during the contract in order to meet the objectives and requirements set forth in
the EIR. It is utilised following the appointment of project stakeholders and in particular the
main contractor.
PIP Project implementation plan - Statement relating to the suppliers’ IT and human resources
capability to deliver the EIR
SMP Standard method and procedure - Set of standard methods and procedures covering the
way information is named, expressed and referenced.
Volume Manageable spatial subdivision of a project, defined by the project team as a subdivision
of the overall project that allows more than one person to work on the project models
simultaneously and consistent with the analysis and design process