Project Name P22-02 Project Code - : P22-XX-XX-SP-K-BEP Pre - Contract BIM Execution Plan (BEP)

Uploaded by

Juan P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
929 views29 pages

Project Name P22-02 Project Code - : P22-XX-XX-SP-K-BEP Pre - Contract BIM Execution Plan (BEP)

Uploaded by

Juan P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

Project Name

P22-02
Project Code - P22-XX-XX-SP-K-BEP

Pre - Contract BIM Execution Plan (BEP)

Approval Record
By: xx Date: xx
Apr: xx Date: xx

Revision Record
Rev Date Revision Details Rev by
xx xx xx xx

Created in collaboration by

Endorsed by
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

BIM Execution Plan Overview


This Pre Contract BIM Execution Plan (BEP) template has been prepared by the PSCP to enable the NHS Trusts to specify
their Building Information Modelling (BIM) requirements in line with PAS1192-2:2013 and associated standards. It is a
response to the EIR ref [Project_Code-P22-XX-XX-SP-K-EIR_P1.1_S2] [insert correct ref]

This document shall be read in conjunction with the:


• P22 BIM Client Guide
• Organisational Information Requirements (OIR)
• Model Production Delivery Table (MPDT)
• Asset Information Requirements (AIR)
• Government Soft Landings requirements (GSL)

Document Ownership
This document should be compiled and completed by the [project team as a collaborative submission], reviewed with all
key project stakeholders.

This document requires the completion of the Model Production Delivery Table (Appendix 1) and the Asset Information
Requirements (Appendix 2), which are to be developed and completed with the assistance and input from the Design Team,
FM Team, Clinicians and other key stakeholders with an interest in or benefiting from the implementation of BIM on the
scheme after handover.

Appendix 1 (MPDT) and Appendix 2 (AIR) hold blank templates for development and completion as described above.
Please refer to the P22 Client BIM Implementation Kit for worked examples of the same. These tables need to be made
project specific. The MPDT is to be developed and completed for all BIM projects. AIR is to be completed and developed
where data for support of FM (or other BIM uses) is required on the project.

Document Authority
Once completed, this document will define the requirements of different stakeholders that will become part of the project
delivery team at different stages of the development of project. In first instance, the requirements made within this document
are to be reviewed by the Client appointed consultants and included in their appointments.

The document should be returned as part of the Contractors tender information. At such stage, this document shall be
agreed by all the representatives of the project team, with the authority of their contracting organisation to accept this
document as the Pre Contract BIM Execution Plan (BEP) as referenced in the Terms of Engagement or subcontracts. This
acceptance also confirms that the relevant supply chains personnel have read and understood its requirements.

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 2 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Contents
1 General Project Information ............................................................................................................... 4
2 BIM PROCUREMENT AND EMPLOYER ENGAGEMENT ................................................................... 7
2.1 Document Purpose ............................................................................................................................................... 7
2.2 Document Structure .............................................................................................................................................. 7
2.3 Response to EIR ................................................................................................................................................... 7
2.4 BIM Vision and Objectives .................................................................................................................................... 7
3 INFORMATION MANAGEMENT .......................................................................................................... 9
3.1 Levels of Definition ............................................................................................................................................... 9
3.2 Training Requirements ......................................................................................................................................... 9
3.3 Planning of Work and Data Segregation .............................................................................................................. 9
3.4 Co-Ordination and Clash Detection .................................................................................................................... 11
3.5 Collaboration Process ......................................................................................................................................... 13
3.6 Health & Safety and Construction Design Management .................................................................................... 14
3.7 Security ............................................................................................................................................................... 15
3.8 Delivery of Information Requirements(should this be called AIR?) .................................................................... 15
3.9 System Performance .......................................................................................................................................... 16
3.10 Compliance Plan ................................................................................................................................................. 17
3.11 Levels & Coordinates .......................................................................................................................................... 18
3.12 Software Platforms ............................................................................................................................................. 18
4 COMMERCIAL MANAGEMENT ......................................................................................................... 20
4.1 Information Exchange ......................................................................................................................................... 20
4.2 Strategic Information Purposes .......................................................................................................................... 20
4.3 Responsibilities Matrix ........................................................................................................................................ 21
4.4 Applicable Standards .......................................................................................................................................... 24
4.5 Schedule of Contract Delivery Changes ............................................................................................................. 25
5 COMPETENCE ASSESSMENT .......................................................................................................... 26
5.1 Project Implementation Plan (PIP) ..................................................................................................................... 26
5.2 Capability Assessments...................................................................................................................................... 26
6 Appendices ........................................................................................................................................ 27
7 Glossary of Abbreviations and Terms ............................................................................................. 28

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 3 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

1 General Project Information


Table 1: Project Information
INSERT IMAGE HERE

Client Name
Project Name
Site Name
Building Name
Building Description
Site Description
Project Address
Type of asset
Form of Contract
Project Number
Design Start:
Site Construction Start:
Site Completion / Handover:
Project EIRs:
Project Description:

Project Deliverables as defined in


the EIR and COBie project
templates (see the CIPx Protocol)
Project Design Management Plan:
Project Management Plan:
Procurement Route:
Phasing:
Approximate Value:
Approximate Gross Internal Floor
Area:
CIC BIM Protocol in use CIC/BIM Protocol Second Edition 2018

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 4 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Table 2: Project Stakeholders


Discipline Role Organisation Originator Key Contact
Code Code
Architect & Lead Designer A Insert Company XYZ Insert Name – Refer to Project
Name Directory
Building Surveyor B Insert Company XYZ Insert Name – Refer to Project
Name Directory
Civil Engineer C Insert Company XYZ Insert Name – Refer to Project
Name Directory
Drainage, Highways D Insert Company XYZ Insert Name – Refer to Project
Engineer Name Directory
Electrical Engineer E Insert Company XYZ Insert Name – Refer to Project
Name Directory
Facilities Manager F Insert Company XYZ Insert Name – Refer to Project
Name Directory
Geographical and Land G Insert Company XYZ Insert Name – Refer to Project
Surveyor Name Directory
Heating and Ventilation H Insert Company XYZ Insert Name – Refer to Project
Designer Name Directory
Interior Designer I Insert Company XYZ Insert Name – Refer to Project
Name Directory
Client/Employer Insert Company XYZ Insert Name – Refer to Project
Name Directory
Landscape Architect L Insert Company XYZ Insert Name – Refer to Project
Name Directory
Mechanical Engineer M Insert Company XYZ Insert Name – Refer to Project
Name Directory
Public Health Engineer P Insert Company XYZ Insert Name – Refer to Project
Name Directory
Quantity Surveyor Q Insert Company XYZ Insert Name – Refer to Project
Name Directory
Structural Engineer S Insert Company XYZ Insert Name – Refer to Project
Name Directory
Town and Country T Insert Company XYZ Insert Name – Refer to Project
Planner Name Directory

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 5 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Contractor W Insert Company XYZ Insert Name – Refer to Project


Name Directory
Sub-Contractor 01 X1 Insert Company XYZ Insert Name – Refer to Project
Name Directory
Specialist Designer Y1 Insert Company XYZ Insert Name – Refer to Project
Name Directory
General (non-disciplinary) Z Insert Company XYZ Insert Name – Refer to Project
Name Directory
Expand as necessary.
Note: Role codes are as identified in BS1192:2007+A2:2016. The role code and originator codes identified above will
form part of the naming conventions. Any changes to these codes must be agreed with the project team.

Table 3: Project Milestones


RIBA Plan of Work 2013 Period Project Milestone BIM Deliverable
0 | Strategic Definition Insert Period Insert Milestone Insert Description of BIM Deliverable
1 | Preparation and Brief Insert Period Insert Milestone Insert Description of BIM Deliverable
2 | Concept Design Insert Period Insert Milestone Insert Description of BIM Deliverable
3 | Developed Design Insert Period Insert Milestone Insert Description of BIM Deliverable
4 | Technical Design Insert Period Insert Milestone Insert Description of BIM Deliverable
5 | Construction Insert Period Insert Milestone Insert Description of BIM Deliverable
6 | Handover and Closeout Insert Period Insert Milestone Insert Description of BIM Deliverable
7 | In Use Insert Period Insert Milestone Insert Description of BIM Deliverable

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 6 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

2 BIM PROCUREMENT AND EMPLOYER ENGAGEMENT


2.1 Document Purpose
This Pre Contract BEP is a response to the NHS Trust Employer’s Information Requirements (EIR’s) and as such provides
details on how the deliverables stated in the EIR’s are to be achieved each team member's responsibility and allocation of
said deliverables according to discipline and specialism. Upon contract appointment this document will be updated to a
Post Contract BIM Execution plan and should be updated to include additional details on how each deliverable will be met.

2.2 Document Structure


NHS TRUST has defined their Information Requirements using the following:
● Project code-P22–XX-XX-SP-K-EIR-001 Employer’s Information Requirements (EIRs)
● Project code-P22–XX-XX-SP-K-OIR-001 Organisational Information Requirements (OIRs)
● Project code-P22–XX-XX-SP-K-AIR-001 Asset Information Requirements (AIRs)
The EIRs, OIRs and AIRs set out all information deliverables (models, documents and data) including traditional project
documents, surveys, reports and appraisals.
This document Project code-P22–XX-XX-SP-K-BEP-001 BIM Execution Plan (BEP) is a response to the above.

2.3 Response to EIR


This BEP is a response to the EIR and includes the following sections in line with PAS1192-2:2013:
● BIM Delivery & Response to the EIRs
● Management processes
● Planning & Documentation processes
● Standard Method and Procedure (SMP)

2.4 BIM Vision and Objectives


BIM as a concept is ‘the adoption of information rich Building Information Modelling (BIM) technologies, process and
collaborative behaviours that will unlock new more efficient ways of working at all stages of the project life-cycle’. The
Government Construction Strategy has mandated the implementation of BIM to Level 2 maturity for Government
Departments by 2016.
To drive a more effective solution to collating the O&Ms, generating Asset Registers, create commissioning schedules,
populate data to a Computer Aided Facilities Management (CAFM) systems etc. and working with a collaborative approach
driven through Soft Landings.
NHS Trust has set out their BIM Vision and Objectives to enable:

Vison and Objective Delivery Mechanism Responsibility


Visualisation & Stakeholder Through 3D modelling and collaboration Design Team/ Employer
engagement
Improved design coordination Through coordination and clash detection Design Team/ Contractor
utilising 3D models
Cost & risk reduction Via informed information available Design Team/ Contractor
through 3D models and information
Space and facilities management, Via handover of digital asset information Employer
Asset management Utilising data within CAFM tools for PPM Employer
Task management Via informed data driven decisions. Employer

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 7 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Plan preventative maintenance Via CAFM tools with easy access to Employer/ FM Provider
information
Efficiently execute reactive By having better access to reliable Employer/ FM Provider
maintenance information
Standardise services and streamline Utilising information to make better Employer/ FM Provider
processes decision quickly and efficiently
Improve long-term planning of Utilising information to make better Employer/ FM Provider
service requirements against budgets decision quickly and efficiently
to ensure alignment with core
business needs

NHS Trust has set out the benefits of BIM as follows:

Benefits Delivery Mechanism Responsibility


Every maintainable asset listed, per space, Via COBie data set Design Team/ Contractor/
per building of each type and instance Suppliers
All Product specific maintenance and Via either COBie data set or upload FM Team
warranty information fed into the CAFM template
system
Full PPM and Lifecycle capability Efficient CAFM database provided by FM Team
FM
Knowledge of specific equipment per room Via COBie data set or CAFM System Design Team/ Contractor/
for replacements Suppliers/ FM Team
Avoidance of additional site visits to Via PPM Schedules within CAFM FM Team
ascertain equipment required System
Spares management Via PPM Schedules within CAFM FM Team
System
Barcode tagging per asset for tracking and Bar code management system Contractor
management
Structured data to enable the population of Via either COBie data set or upload Design Team/ Contractor/
the CAFM software template Suppliers

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 8 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

3 INFORMATION MANAGEMENT
3.1 Levels of Definition
Level of Definition is used to determine both the level of geometry detail (LOD), and level of associated information (LOI)
for any given model element at an agreed project work stage. Defining LOD and LOI informs suppliers of the degree of
information reliability when using the model.
Further guidelines on Level of Definition are available at https://toolkit.thenbs.com/definitions.
The project Level of Definition requirements, delivery work stages, and model originators are as outlined in the Model
Production and Delivery Table (MPDT) and post contract Master Information Delivery Plan (MIDP)
The project information requirements are as outlined in the Asset Information Requirements (AIR) appended to this
document. The LOI requirement for each asset element will be delivered using the COBie UK – 2012 (Construction
Operations Building information exchange) schema in accordance with BS 1192-4:2014.

3.2 Training Requirements


The purpose of this section is to provide the supplier details of training to be provided in connection with project systems,
or training requirements to be delivered by the supplier as part of their appointment/ contract.
Training for access and operation of the Employer’s CDE shall be provided by the Employer to suppliers as required.
Employer security or induction requirements will be highlighted to the suppliers on a project specific basis.
Training and education needs of the project delivery team involved in the production, analysis and review of the Project
Information Model are recorded here in the BIM Execution Plan (BEP). Unless noted below as a specific Employer
training requirement(s), project delivery training will remain the responsibility of the relevant supplier members.

Training Requirement Organisation Providing Training Requirements Completed


Training

Client Common Data Client All persons accessing the


Environment client Common Data
Environment

Contractor Common Data Contractor All Persons accessing the


Environment Contractors Common Data
Environment

Site BIM Induction Contractor All site operative who


interact with model and
data requirements

*Extend as required to include details of all training requirements for successful project delivery.

3.3 Planning of Work and Data Segregation


The purpose of this section is to set out management and modelling process requirements for the supplier.
Data segregation planning and information management responsibilities shall be in accordance with the processes
described inside of PAS1192-2:2013+A1, clause 5.3 A) 3) and BS1192:2007+A2:2016. The following are required as a
minimum and shall be documented inside the project BIM Execution Plan:

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 9 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Model management
Insert any specific model management requirements here

Volumes zones and areas


Insert details of Volumes, Zones and Areas here

Naming Conventions
Insert details of any specific naming conventions here.
Note: Naming conventions should follow BS1192:2007+A2:2016 for Files and Layers (provide examples)

Annotations, Dimensions , Abbreviations & Symbols


Each discipline should provide the Design Manager and the Lead Designer with a full list to be used on the project.
This list should be published to all members of the project team to ensure consistency of the document graphical
presentation and shall be consistent throughout the project. Also see BS8541 Parts 1, 2, 3 and 4. As identified in 4.1
Applicable standards.
Dimensions should be derived automatically from the underlying CAD coordinates by using the 'associative
dimensioning' function of CAD systems. Dimensions should not be entered as 'text' as they are purely graphic
characters having no relationship with the underlying CAD coordinates and will cause the relative positions of elements
in a drawing to be compromised.

Type of Information Millimetres Metres Degrees Radians Clockwise Counter Clockwise


Survey ● ●
Civils ● ●
Models ● ●
Drawings ● ●

Publishing Processes
Insert specific publishing process here or refer to separate guidance document.

The Employer expects all suppliers to work in a collaborative manner utilising intelligent 3D geometry models. Supplier’s
3D model will be the originating source for drawing production. Object standards shall align with BS 8541:1,3,4 and BS
8541-2 for project 2D symbols.
Technical limitations of production hardware and software systems should be identified and recorded in the BEP during
the initial planning of work and data segregation phase.

Technical Limitations
Insert any specific technical limitations and mitigating factors here.

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 10 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

3.4 Co-ordination and Clash Detection


Project quality and de-risking through model and information co-ordination is a key employer’s objective and requirement.
The purpose of this section is to define the project coordination process including quality control requirements.
The project clash detection and avoidance process is detailed herein this BEP as follows.

Software Utilisation

Federation Insert details and outputs of federation software including


year of release and version.

Review Insert details of how task teams and client team interact
with federated model and review issues.

Lead Consultant Task Team A (Arch) Task team B (###) Employer Contractor
Undertakes internal clash Undertakes internal clash
Issues Models to CDE for
Issues Models to CDE detection and coordination detection and coordination Receives Models via CDE
CDP elements
prior to issue prior to issue

Receives Models via Reviews federated model


Issues Models to CDE Issues Models to CDE Receives Models via CDE
CDE from CDE

Federates Models
provided by Task Teams Reviews federated model Reviews federated model Reviews coordination Reviews federated model
from CDE from CDE report from CDE
(inc sub contractors)

Reviews federated model Reviews coordination


Reviews coordination report Reviews coordination report
from CDE report

Undertakes Visual Issue Undertakes Visual Issue Undertakes Visual Issue Undertakes Visual Issue
detection utilising detection utilising federated detection utilising federated detection utilising
federated model model model federated model
Undertakes clash
Contributes and
detection utilising Brings any issues to Brings any issues to
prioritises issues to
specialist software to Coordination meeting Coordination meeting
Coordination meetings
agreed workflow

Reviews report and BIM Reviews report and BIM Reviews report and BIM
Issues Coordination
Issues prior to BIM Issues prior to BIM Issues prior to BIM
report
coordination meeting coordination meeting coordination meeting

Issues BCF file of BIM Comments on issues at BIM Comments on issues at Comments on issues at
issues coordination meeting BIM coordination meeting BIM coordination meeting

Makes adjustments to
Attends and leads BIM Adjust models based on Adjust models based on
models based on project
Coordination Meeting project team feedback project team feedback
team feedback

Monitors the design


review process to ensure
review is reflective of the
Assigns Owners to design management plan
Issues and appropriate
construction timeline.

Closes out issues with


task team approval

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 11 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Records issue
management at BIM
Coordination Meeting

Creates saved views of


issues discovered and
saved views of floor
plans, sections and
elevations plus other
views as directed by the
Design Manager to
enable model review.

Output Owner Content Frequency

Coordination Report Lead Designer Geometry Issue review 2 weekly

Full audit review of protocols,


BIM Review Contractor process, data delivery and Monthly
management.

2 Weekly (Mandated) Ad hoc as


BCF File* Lead designer Geometry and Issue Management
required by task teams

2 Weekly (Mandated) Ad hoc as


NWD File* Lead Designer Federated Model
required by task teams

2 Weekly (Mandated) Ad hoc as


SMC File* Lead Designer Federated Model
required by task teams

Error notification issued via 2 Weekly reports supported by


Electronic Notification, PDF Report Contractor collaborative platform supported online notifications as coordination
by PDF report and information is collected

*Complete as required or delete

Technical Query Workflow

Inset workflow diagram to illustrate technical query


workflow

Tolerance Strategy

Inset workflow diagram to illustrate tolerance strategy

Clash Resolution Process

Inset workflow diagram to illustrate clash resolution


process

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 12 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Delivery will be undertaken through regular sharing of model data as outlined in the BEP in the form of native files and
other agreed exchange formats. Prior to sharing all data shall be checked, approved and validated as ‘Issued for
coordination” in the CDE in line with the BS1197:2007+A2:2016 and PAS1192-2:2013+A1 status codes.
Model federation, coordination and reporting responsibilities shall align with information exchange activities and roles
outlined in PAS1192-2:2013+A1, Table 2.

3.5 Collaboration Process


This section defines how, when and where project information will be shared.
All processes follow BS1192:2007+A2:2016 & PAS 1192-2:2013+A1, utilising the described four Common Data
Environment (CDE) phases; Work In Progress, Shared, Published and Archive during all project work stages.

Item Link

CDE Tool Insert web link to CDE tool

CDE Administration Insert Name and contact details of CDE administrator

CDE Help Insert details of CDE help process or web link

The project CDE set up and management shall align with activities, roles and responsibilities as outlined in PAS1192-
2:2013+A1,Table 2.

Frequency and formats of information exchanges


Insert details of frequency and formats of information exchanges

Format and extent of model sharing at every stage of the project


Insert details of frequency and extent of model sharing at every stage of the project

Frequency and details of model review workshops and other collaborative working practices
Meeting Type Description Frequency Participants Location/Time
BIM Strategy Meetings to establish project aims All Key BIM
BIM Strategy Meetings Project Inception < Complete>
and ambitions. Personnel

This meeting will confirm the herein BIM Execution


Plan (BEP) It will define the full scope of packages All Key BIM
BIM Kick-off Meeting Once < Complete>
and agree appropriate fees to plan model Personnel
progression to meet procurement schedules
Design Team,
Pre-or Post-
To define the scope for the FM requirements and Project Information
BIM to FM Strategy Contract to be < Complete>
establish the link from BIM to CAFM Manager,
agreed
FM/Client
To monitor and report on the BIM progress of the All Key BIM
BIM Audits Monthly < Complete>
project Personnel
3D and data coordination of federated BIM
All Key BIM
BIM Coordination Meetings including a review of BIM Issue Log and resolution Every 2 Weeks < Complete>
Personnel
priority.

Geometry Validation To ensure validation of the As Built Vs Virtual At set All Key BIM
< Complete>
Meetings Model milestones Personnel

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 13 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Data Drop (Information To align with information exchange dates to At Set All Key BIM
< Complete>
Exchange) meetings ensure successful handover of information Milestones Personnel

Once
To discuss, agree and formalise digital handover (Align with All Key BIM
PIM to AIM Handover agreed < Complete>
requirements Personnel
information
exchange)

Additional Meetings as
< Complete>
project requires

Note: Meetings can be combined, however there should be a clear distinction between topics to ensure meeting achieves goals.

Frequency and details of design / employer team reviews using the federated model/ data
Insert frequency and details of design / employer team reviews using federated model/ data

3.6 Health & Safety and Construction Design Management


The Employer expects the BIM process to support the project Health & Safety and CDM monitoring aligned to the project
work stages. This includes the utilisation of BIM to identify and reduce H&S hazards/ risks in design, construction and
operational phases through early identification and mitigation. Residual hazards/ risks should be communicated through
the CDE and where possible within the model environment.

Schedule of work stages and overview of key H&S deliverables against each stage
Insert schedule of work stage and overview of key H&S deliverables against each stage

Confirmation of how information shall be stored and shared


Insert details of how information shall be stored and shared

Requirements for disaster planning


Insert details of disaster planning requirements

Approach to design authoring and model interrogation


Insert details of approach to design authoring and model interrogation

The model development and structured delivery of information should enable the following uses under CDM2015:

BIM uses under CDM2015 Delivery Mechanism Responsibility


Design to construction coordination 3D native and Federated models Design Team
providing regular design review and
look ahead.
Site logistics and site safety, plant and Temporary works modelling to Contractor
pedestrian segregation, traffic and delivery deliver design review and look ahead
management

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 14 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

4D simulation with programme and 4D time/ Programme Visuals Contractor


logistics
Pre-fabrication Off Site manufacture Contractor
Installation management checklists – Automated checklist for site Contractor/ Sub Contractor
mobile devices installation
BIM virtual animation to fly through and Animation file Contractor
around site, indicating all H&S issues on
site during site inductions
Visual method statements 3D visuals to support method Contractor/ Sub Contractor
statement
Access to the BIM model by all Shared Federated model in hosted Facilitated by Contractor
subcontractors and visitors on site platform space
Completion of the H&S File and asset Supported by model delivery Contractor
information for soft landings, training etc.
[UPDATE AS APPLICABLE]

3.7 Security
This section details the process set out for monitoring, managing and complying with the Employers security mandate,
including adherence to any standard or processes for data sharing.
All supply chain organisations are required to adopt the security requirements as detailed in the project BIM execution
plan.
The following security standards should be followed in respect of the proposed BIM project, defined in accordance with
the business impact levels as prescribed in the HMG Security Policy Framework

Security Status Description Requirement

IL1 Not Protectively Marked Insert Requirement


IL2 Protect Insert Requirement
IL3 Restricted Insert Requirement
IL4 Confidential Insert Requirement

● All project information must be shared via the project CDE


● The use of CDs, USB drives is not permitted
● The use of other online document exchange tools is not permitted
● Project documents must not be shared via email
● All CDE users must have their own user name and password – please contact the project administrator
● The project team have confirmed their company security standards as part of the BIM Capability
Assessment.

3.8 Delivery of Information Requirements


This section defines the information exchange standard for the information deliverables, and enables the employer to
obtain proposals in relation to asset information delivery for the FM environment.
The information exchange format and requirements for the Asset Information Model are prescribed in the Asset
Information Requirements (AIR’s) document Project code-P22-XX-XX-SP-K-AIR-001. Asset information requirements
and handover format shall be in accordance with BS 1192-4:2014, delivered at work stage exchange points noted herein.
Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 15 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Insert proposed methodology and process for best delivery of the Employers required asset information and associated
Master Information Delivery Plan post contract award.

Task Information Delivery Plan (TIDP)


A task information delivery plan (TIDP) for each task within the project should be prepared by all task team authors
identifying their information deliverables and not limited to models and drawings. This is to align with milestone dates and
project Programme. When completed by all team members the TIDPs should be published on the CDE and updated
regularly to reflect the information deliverables on the project. The template is provided to align with the MIDP and allow
cutting and pasting of information.
<Provide reference to TIDP here>

Master Information Delivery Plan (MIDP)


The master information delivery plan (MIDP) will be developed by PSCP’s from the separate TIDPs produced for each task
within the project aligned with the project programme. This detailed, co-ordinated MIDP must be developed and agreed
with the project team. When completed the MIDP should be published in the CDE as a project plan. The MIDP should list
all the information deliverables for the project, including but not limited to models, data, drawings or renditions,
specifications, equipment schedules, room data sheets, and shall be managed via change control. If unsure please seek
advice from ICL BIM Core Team.
<Provide reference to MIDP here>

Model authors should ensure that the model will be modelled and edited as per construction sequence it may be further
used downstream for 4D and 5D purposes for which this is critical. It is also critical that the model represents how the
project is to be estimated and constructed. Elements must be modelled as they will be constructed and/or delivered (i.e. in
an as-built state), not in an analytical state. Elements should never overlap. If elements overlap they will cause clashes
(false positives) and generate false quantities during take-off. We have solutions for identifying and eradicating any clashes
but all stakeholders should aim to avoid creating clashes from the outset to streamline the design process. Please note the
following good practice points.
● Elements are to be modelled and classified correctly i.e. a roof is a roof not a floor.
● Elements are to be replaced not deleted and re inserted to maintain GUID/ BATID
● Architectural spaces are to be complete and accurate to match client/ CAFM requirements.

3.9 System Performance


This section communicates any constraints in the Employer’s systems or specific IT requirements, which may need
additional resources or non-standard solutions.
Model size – no size limitation but practically 100Mb max refer to section 3.3 for Volumes and Zone requirements to
manage model size and delivery.
Software Uses – It is essential native file formats delivered can be openly shared, and software platform systems can
export to IFC (2x3) for information extraction, verification, archive and free model viewing purposes. Inherent model data
must be extractable in a format exchangeable with Microsoft Excel for information exchange purposes.
Security issues – as noted in 3.7 herein.

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 16 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

3.10 Compliance Plan


The purpose of this section is to enable the supplier to communicate how the integrity and quality of the model and other
data sources will be maintained.
All published information exchanges will be validated to COBie UK -2012 in accordance with BS 1192-4:2014 guidance
and recommendations, and to the delivery requirements as outlined in the Asset Information Requirements appendix
documentation.
The methodology for model delivery and data compliance procedures including references to standards and compliance
software is outlined in the tables below.

Quality assurance/ control procedures (Verification/ Validation of Geometry and Data)

Insert details of Quality assurance/ control procedures (Verification/ Validation of Geometry and Data)
Note: This section should include detail of pre/ post construction surveys to ensure as constructed asset reflects the
virtual asset including details of any rectification workflows. Details of any existing legacy data use should also be
provided.

Associated software
Insert details of associated software

Period of Aftercare the number of years the model should be managed for (IF APPLICABLE)
Insert details of aftercare (if applicable)

Security requirement assurances


Insert details of security requirement assurances.

Change Control
Insert details of change control process

Legacy Data Use


Insert details and control mechanisms for use of legacy data, if none state n/a

The Employer / Employers Information Manager shall be granted access to the project CDE to enable regular compliance
monitoring and audits.

Compliance Plan for Compliance Plan for Compliance Plan for Compliance Plan for Compliance Plan for BIM
Project Delivery Manager Information Manager Lead Designer Task Team Managers Implementation Manager
Comply with the Comply with the Comply with the Comply with the Comply with the
requirements of the BEP requirements of the BEP requirements of the BEP requirements of the BEP requirements of the BEP
(this document) (this document) (this document) (this document) (this document)
Host meetings scheduled Validation of model Generate federated model Issue information in agreed Develop and maintain Post
in section 3.5. Information utilising for coordination review formats to the CDE at the Contract BEP (this
manual and automated process (all models are to agreed frequency. document)
means. be aligned with agreed

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 17 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)


coordinates detailed in
section 3.11)
Produce MIDP Communication of model Complete coordination Derive 2D drawings from Conduct BIM Audit checks
issues via collaboration review as detailed in models against the BEP (this
platform section 3.4 document) at agreed
frequency.
Manage change control Monitor and report on Attend and respond to Develop models in Attend and respond to
process and regularly audit information uploaded to issues discussed at the accordance with TIDP issues discussed at the
and review the CDE and ensure it relevant meetings MIDP to the agreed LOD relevant meetings
aligns with MIDP scheduled refer to section LOI scheduled refer to section
3.5. 3.5.
Attend and respond to Self-audit all
issues discussed at the documentation prior to
relevant meetings issue to CDE
scheduled refer to section
3.5.
Carry out internal clash
detection/ data validation
prior to issue to CDE
Attend and respond to
issues discussed at the
relevant meetings
scheduled refer to section
3.5.
Produce TIDP

3.11 Levels & Coordinates


This section defines the requirements for the common coordinate system for all BIM data, with consistent adoption on all
project models.
The following is a minimum spatial coordination requirement:
● Intersections of grids XX and YY – xxxxxx.xxxE and xxxxxx.xxxN
● Intersections of grids AA and BB – xxxxxx.xxxE and xxxxxx.xxxN
● Ground Floor FFL = xxx.xxx
● Origin rotation = 000.000deg
● Offsets = xxx.xxx
● Datum Information = xxx.xxx

3.12 Software Platforms


This section defines the platforms for the Building Information Modelling as well as other software platforms to be used.
Platforms and versions used by the Design/Construction Team on this project are outlined in the below table:
Table 2: Software formats

Method of Data Exchange: NHS Trust CDE


Format of 3D Graphical Data Exchange: .IFC (2x3), native and .NWC (20xx) (all required)
Format of 2D Graphical Data Exchange: PDF, DWG
Documentation PDF, DOC
Non Graphical Asset Data IFC (2x3), XLSX (COBie UK 2012)
(extend as required)

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 18 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Suppliers with asset data deliverables should align their model attributes consistent with the data exchange format
outlined in BS 1192-4:2014.

Model data compilation to COBie.

Insert details of Model data compilation to COBie

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 19 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

4 COMMERCIAL MANAGEMENT
4.1 Information Exchange
This section communicates the timing and content of information exchanges between the Project Team / Supplier and the
Employer and how information exchanges are aligned to work stages. Information may flow both ways.
The NHS Trust work to the RIBA Plan of Work 2013. At a project level, the frequency of required information exchanges
will be defined in further detail within the project AIR & MIDP. Whilst information can be shared at any time during the
course of a stage, formal published information deliverables should be exchanged prior to the end of a stage to advise the
decision gateways, as indicated by the project MIDP.
Information deliverables required at each information exchange will be as defined by the project MIDP. In general, those
information deliverables range from files that may consist of any of the following:

COBie as a transmittal sheet (project directory, facility, docs and component tabs as a minimum).

Native and PDF documents (reports, schedules)

3D Models – in their native discipline (un-federated) and in open standard IFC format.

Drawings – cut from the models, and other documents, in PDF and DWG format

Structured data – manual input or from models, in BS1192-4: 2014 format, all exchanged as files and
referenced in the COBie transmittal sheet, to be issued in both IFC and XLS format.
COBie-BS1192-4:2014 excel sheet data structure shall be used as the default exchange format for all project related
information whether 3D modelling is involved or otherwise. For all mandated projects the expectation shall be for the
following COBie-BS1192-4 tabs to be completed as a minimum:
Insert project specific Information Exchange requirements here in line with the Project AIR

4.2 Strategic Information Purposes


The Project Information Model (PIM) and Asset Information Model (AIM) will be used for the following purposes:
Stage 0 – 2 Stage 3 – 4 Stage 5 Stage 6 Stage 7
Definition & Brief Design Construct Handover Operation

Site evaluation
Feasibility Study
Visualisation Visualisation Visualisation
Stakeholder Stakeholder Stakeholder
engagement engagement engagement
Design Authoring
Coordination
Structural Analysis
Lighting Analysis
Energy Analysis

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 20 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Sustainability
Assessment
Statutory Compliance
Site Logistics (4D) Site Logistics (4D)
H&S Planning H&S Planning
Cost Management Cost (QTO) Cost (QTO)
CDM2015 CDM2015 CDM2015 CDM2015 CDM2015
Off Site manufacture
As-Built Asset data
Soft Landings Soft Landings
Planned Maintenance Planned Maintenance
Scheduling Scheduling
Lifecycle Analysis Lifecycle Analysis Lifecycle Analysis Lifecycle Analysis Lifecycle Analysis
Asset Management
Facilities
Management
Space Management
Post Occupancy
Evaluation (POE)

4.3 Responsibilities Matrix


The purpose of this section is to bring to the attention of the project team the allocation of roles associated with the
management of the model and project information.
The assignation of roles is noted below, derived from PAS1192-2:2013 7.5 Table 2. The Information Management role is
additionally defined in CIC/INF MAN/S 2013. The roles are not new appointments, rather roles that are applied to named
individuals working on the project to assign task ownership. These roles may be transferred and migrate to different
individuals as the project progresses.
The following roles will be applied to the project in line with PAS1192-2:2013.

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 21 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Role Activities PAS1192_2 Table Authorities PAS1192-2 Carried


2 Table 2 out by

Employer Name and Organisation – ● Define the EIRs, OIRs EMP


Representative / PIM Refer to Project Directory and AIRs, including PIM
(receiver) structured data
(refer also to BS8536-1) requirements (COBie)
● Define the IDP,
including PLQs
● Establish the Employer
AIM CDE and/or CAFM
● Authorise information
from Shared to
Published
● Ensure information
exchanges from PIM to
AIM
● Accept / reject
information exchanges
to AIM
● Validation of AIM
information
● Enable data integration
to the employer AIM
CDE
● Ensure information
exchanges to the
Employer CAFM
● Validation of CAFM
information
Project Delivery Name and Organisation – ● Assure delivery of ● Accept / reject TBC
Manager (PDM) Refer to Project Directory information exchanges information exchanges
● Confirm suppliers ability within the common
to deliver information data environment
requirements

Project Information Name and Organisation – ● Enable reliable ● Accept / reject TBC
Manager (PIM) Refer to Project Directory information exchange information exchanges
through the CDE within the common
● Maintain and receive data environment
information into the ● No design
Information Model responsibility or right to
● Enable integration and issue instructions
co-ordination of
information within
Information Model
● Configure information
for Project Outputs
● Populate the
information exchange
format for the
Information Model

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 22 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Lead Designer Name and Organisation – ● Co-ordinated delivery of ● Confirm status and LD
Refer to Project Directory all design information approve information for
● Manage information issue within the CDE
development and ● Approve design
information approvals changes proposed to
● Confirm design resolve clashes
deliverables
● Overall lead for
configuration
management

Task Team Manager(s) Arch - Name and ● Production of design ● Issue approved TTM(s)
(TTM) Organisation – Refer to outputs related to a information within the
Project Directory discipline specific, CDE
package based or time-
Struct - Name and based task
Organisation – Refer to ● Approval of Task Team
Project Directory Information prior to
MEP - Name and Sharing to the CDE
Organisation – Refer to
Project Directory
Task Information Arch - Name and ● Direct the production of Confirm that information is TIM(s)
Manager(s) (TIM) Organisation – Refer to task information in suitable for issue within the
Project Directory compliance with CDE
standards and methods
Struct - Name and
● Direct the production of
Organisation – Refer to
task information using
Project Directory
agreed systems
MEP - Name and
Organisation – Refer to
Project Directory
Information Author(s) Arch - Name and ● Develop constituent Inform
Organisation – Refer to parts of the information ation
Project Directory model in connection Author(
with specific tasks s)
Struct - Name and
● Production of project
Organisation – Refer to
outputs
Project Directory
MEP - Name and
Organisation – Refer to
Project Directory
Interface Manager(s) Arch - Name and ● Manage spatial co- Propose resolutions to Interfac
Organisation – Refer to ordination on behalf of a clashes e
Project Directory task team Manag
● Propose resolutions to er(s)
Struct - Name and
co-ordination clashes
Organisation – Refer to
Project Directory
MEP - Name and
Organisation – Refer to
Project Directory
Information Originator Arch - Name and ● Develop constituent Ownership of model Inform
Organisation – Refer to parts of the information information ation
Project Directory model in connection

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 23 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

Struct - Name and with specific tasks Origina


Organisation – Refer to ● Production of project tor
Project Directory outputs
MEP - Name and
Organisation – Refer to
Project Directory

4.4 Applicable Standards


The purpose of this section is to define the BIM Standards and protocols that are incorporated into the Information
Requirements on the project. The following standards will be applied to the project.
Industry Standards Applicable

BS1192:2007 ☐
PAS1192-2:2013 ☐
PAS1192-3:2014 Lifecycle ☐
BS1192-4:2014: COBie ☐
PAS1192-5:2015 Security ☐
PAS1192-6:2018 Health and Safety
BS8536-1:2015 Facilities Management ☐
BS8541-1, 2, 3, 4, 5, 6 Library management ☐
BS7000-4:2013 Design Management ☐
Uniclass 2015 Classification* ☐
RIBA Plan of Works 2013 ☐
BIM Toolkit (DPoW), including Level of Definition* ☐
CIC BIM Protocol 2ND Edition 2018 ☐
Other – State here ☐
* Under development (date stamped tables will be issued and are to be adhered to by all model
authors)

Corporate Standards Applicable

Process EIR, OIR, AIR ☐


Asset Tagging ☐
Room Naming/ Numbering ☐
Room Data Sheets ☐
O&M Manuals ☐

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 24 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

CDE Standards including folder structure to align with PAS1192-2 ☐


Zoning for CAFM ☐
Bar Coding ☐
Level Standards ☐
System Naming ☐

4.5 Schedule of Contract Delivery Changes


The purpose of this section is to outline any changes to the standard roles, responsibilities and competences set out in
the contract.
Confirm that all BIM requirements, roles and responsibilities are included in appointment scope of services and the
Supply Chain BIM deliverables will be included in applicable Subcontractor orders.

Provide any clarity required on changes to standard roles, responsibilities and competences.

Provide any additional information regarding changes to CIC BIM protocol and IP Changes requested by Insurers and full
descriptions of amendments and reasons.

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 25 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

5 COMPETENCE ASSESSMENT
5.1 Project Implementation Plan (PIP)
Supply Chain Capability Summary
Insert Supply Chain Capability Summary (PAS 6.3.2)

Supplier Building Information Management Assessment Forms


Insert Supplier Building Information Management Assessment Forms (PAS1192-2 6.3.2a)

Supplier Information Technology Assessment Forms


Insert Supplier Information Technology Assessment Forms (PAS1192-2 6.3.2b)

Supplier Resource Assessment Forms


Insert Supplier Resource Assessment Forms (PAS1192-2 6.3.2c)

5.2 Capability Assessments


The Supplier should confirm that the project team have been assessed in line with the following:
● PAS1192-2:2013
● CPix BIM Capability Assessment
● CPix IT Questionnaire

Insert supplier confirmation and evidence as applicable.

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 26 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

6 Appendices

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 27 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

7 Glossary of Abbreviations and Terms

BEP BIM Execution Plan


BIM Building Information Modelling
BSRIA Building Services Research and Information Association
BWM BIM workgroup meeting
CIC Construction Industry Council
CDE Common Data Environment
EIR Employer Information Requirement
IFC Industry Foundation Class
LOD Level of Detail
LOI Level of Information
MPDT Model Production Delivery Table
NBS National Building Specification
WIP Work In Progress
4D 3D representation of an asset with the element of time included to enable simulations.
5D 3D representation of an asset with the element of time and cost included to enable
simulations, commercial management and earned value tracking to take place.
BEP Plan prepared by the suppliers, facilitated by the Employer or the Employer’s BIM
representative to explain how the information modelling aspects of a project will be carried
out
BIM Process of designing, constructing or operating a building or infrastructure asset using
electronic object-oriented information
CIC Scope of Services Multi-disciplinary scope of services published by the Construction Industry Council (CIC)
for use by members of the project team on major projects
COBie Construction Operation Building information exchange. Structured facility information for
the commissioning, operation and maintenance of a project often in a neutral spread sheet
format that will be used to supply data to the employer or operator to populate decision-
making tools, facilities management and asset management systems
CDE Common data environment - Single source of information for any given project, used to
collect, manage and disseminate all relevant approved project documents for multi-
disciplinary teams in a managed process. This is commonly a cloud based SaaS solution
synchronised with party servers to host the information model
Data Information stored but not yet interpreted or analysed
Design intent model Initial version of the project information model (PIM) developed by the design suppliers
Document Information for use in the briefing, design, construction, operation, maintenance or
decommissioning of a construction project, including but not limited to correspondence,
drawings, schedules, specifications, calculations, spread sheets
Drawing Static, printed, graphical representation of part or all have a project or asset
Employer Individual or organization named in an appointment or building contract as the employer

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 28 of 29
Project Name 350-03

Pre Contract BIM Execution Plan (BEP)

EIR Employer’s information requirements - Pre-tender document setting out the information to
be delivered, and the standards and processes to be adopted by the supplier as part of the
project delivery process
Federated model A federated model is an assembly of distinct models or design disciplines, to create a single
complete model of the building. Eg Architectural, Structural and Mechanical models may
be viewed in a single ‘federated’ model.
Graphical data Data conveyed using shape and arrangement in space
Level of Definition Collective term used for and including “level of model detail” and the “level of model
information”
MIDP Master information delivery plan - Primary plan for when project information is to be
prepared, by whom and using what protocols and procedures, incorporating all relevant
task information delivery plans
Pre-contract BEP The pre-contract BEP is to demonstrate the supplier’s proposed approach, capability,
capacity and competence to meet the EIR. It is utilised prior to the appointment of any
stakeholder.
Post-contract BEP The post-contract BEP is the document defining standard methods and procedures
adopted during the contract in order to meet the objectives and requirements set forth in
the EIR. It is utilised following the appointment of project stakeholders and in particular the
main contractor.
PIP Project implementation plan - Statement relating to the suppliers’ IT and human resources
capability to deliver the EIR
SMP Standard method and procedure - Set of standard methods and procedures covering the
way information is named, expressed and referenced.
Volume Manageable spatial subdivision of a project, defined by the project team as a subdivision
of the overall project that allows more than one person to work on the project models
simultaneously and consistent with the analysis and design process

Copyright © P22 Document Name Version Status Date Page Number

All rights reserved


Document uncontrolled when printed
Project code-P22-XX-XX-SP-K-BEP P0.1 S0 14 July 2018 29 of 29