Key Plan Concrete Area 1-Model

The document provides a key plan showing the pouring sequence for concrete on the 6th floor of a building project. Concrete will be poured in discrete areas starting with areas labeled FB2, followed by areas labeled FB3, and finishing with areas labeled SB2. The pouring will involve 14 mixers with the 13th, 12th, 10th, 7th, 6th, 3rd, 14th, 11th, 9th, 8th, 4th, and 1st and 5th mixers being utilized in the specified sequence.

Uploaded by

KevinNavidad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views1 page

Key Plan Concrete Area 1-Model

The document provides a key plan showing the pouring sequence for concrete on the 6th floor of a building project. Concrete will be poured in discrete areas starting with areas labeled FB2, followed by areas labeled FB3, and finishing with areas labeled SB2. The pouring will involve 14 mixers with the 13th, 12th, 10th, 7th, 6th, 3rd, 14th, 11th, 9th, 8th, 4th, and 1st and 5th mixers being utilized in the specified sequence.

Uploaded by

KevinNavidad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FB2 FB2 FB2

3rd Mixer
13th Mixer 12th Mixer 10th Mixer 7th Mixer 6th Mixer

FB3
14th Mixer 11th Mixer 9th Mixer 8THth Mixer 4th Mixer
SWB 2nd Mixer

FB2 FB2 FB2

1st, 5th Mixer

SB2

Key Plan for Pouring of Concrete on 6th Floor


Area 1