‘e @ GE Power Systems
Oil & Gas
compressor ews
Subject: Ring, Compressor/Rider (C/R) Group: Cylinder Assy.
Number: 01-001 Sub Gp: Piston & Ring Gp
Date: Feb. 1, 2003 Series: 89
‘The piston rings in the 4 ¥% - 5 Y (2500 PSIG) and the 5 ¥% - 6 ¥% (2200 PSI)
cylinders have been changed to the compression/rider (C/R) type piston rings
(G00 - 100067) from the compression type piston rings (x00 - 1000000).
Cylinders shipped after January 1, 2001, and serial number 8964296 and up,
will have the compression /rider piston rings. The rings (x00-100000 and
200c-100067) are not interchangeable.
Taras [waren | Teli Toa
es
sueses | une | t-nerer
exssuosr | esssnone | zee-noag | ene. isi00851
e @ GE Power Systems
Oil & Gas
compressor {jews
Subject: Gasket, Seat,Vaive Group: Cylinder Assy.
Number: 01-003 Sub Group: Cover & Holder GP
Valve seat gaskets are now available In two thicknesses. The .062” thick
gasket can be used where more spaced Is desired between the valve and head.
7 The 062" thick gasketls the standard gasket I cylinders shipped starting the,
second quarter of 2004. The .031” thick gasket will still be avallable a
item.
Gasket Part Number
2031: Thick _| .062" Thick Valve Size Cylinder Size
50-14367 | 50-100078_| H52RX Inlet 25-3.0
'53-14367 | 53-100078 | H52RX Discharge
e ‘47-14367 | 47-100078_| HGORX Inlet 3.25 -3.75,
11-14367__[11-100078 | H6ORX Di: 4.75 -5.5
1-01-20048 | 13-100078 | 64CET & H70RX Inlet 4045, 575-65, 30-375,
1-20882 14-100078 | 64CET & H70RX Discharge arene
1-20122 | 16-100078 | 77CT & H79RX Inlet 6.75-7.5
1-01-30121 | 18-100078 | 77CT & H79RX Discharge 5.5-6.25
'56-14367 | 56-100078 _ | 77Ct inlet (SPC1) & Hi000cT Disc
63-14367__ | 63-100078_| 77CT Discharge (SPCL) 7.75-85
59-14367__[59-100078 | Hi00CGT inlet 5.5 ~ 6.25 (3600 psi)
15-14367 | 15-100078 | 1270GT & H127CGT Inlet 9.0-10.5
35-14367 | 35-100078 | 1270GT & H127CGT Discharge | _7.0- 7.5, 10-11
61-14367__ | 61-100078 | 137CHT Inlet 10-11 (95p) -
62-14367 | 62-100078 _| 137CHT Discharge
41-14367 | 41-100078 _[ 148CHT & Hi48CHT Inlet 11.0-13.0
44-14367 | 44-100078 _[148CHT & 148CHT Discharge | 8.5— 9.5, 12- 13.5
The sealing surface on the cylinder for the cover gasket (soft iron
or O-ring) will be in a different position when replacing a .031”
gasket with a .062” gasket. The new sealing surface must be
clean and free of marks, rust and dirt. The new sealing surface is
i more critical when an O-ring is used.
‘Gas Compressors002851
GE Power Systems
Oil & Gas
compressor [ews
Subject: Indicator, cycle, magnetic Group: Divider Valve Assy
Number: 01-005 Sub Group: Cylinder Lube GP
The cylinder lubrication system has been changed to eliminate one point of
possible oil leaks. A magnetic cycle indicator has replaced the cycle pin
indicator on the divider valve assembly. No more cycle pin packing and o-
rings to leak and replace. The magnetic cycle indicator is a fully enclosed
stainless steel housing with a highly visible bright color cycle indicator.
The indicator will be phased in on the M, H and B frames in the third quarter
of 2001. The indicator was phased in on the A, D, E and F frames in the first
quarter of 2000. :
The indicator is available for field replacement and repair as listed:
Part number Frame Divider Valve Manuf.
4-100077 ADE, F Lincoin
2.100077, M,H,B Dropsa
Gas CompressorsGE Power Systems
compressor (jaws
Satie Fame Nanenancr RSL KGS ina Fame GP
Recommended Spare Parts Lists (RSPL)
GE Gemini has developed an array of compressor frame maintenance RSPL kits
designed to simplify ordering and shipping of all items needed to perform specific
maintenance or repair procedures.
The objectives of Gemini RSPL kits are: *
Minimizo Customer's time required to order parts
Assurance that all parts are included for a given repair procedure
Include small hardware, gaskets and seals with major parts in RSPL kits
Expedite parts shipment by having RSPL kits pre-packaged
‘A combination of various RSPL kits may be ordered for frame overhaul
cece
RSPL kits are designed for the following frame maintenance and repair procedures:
PM Preventive Maintenance
Bearing Replacement
Crosshead Replacernent
Gasket / Seal Replacement
Oil Cooler Replacement
Oil Pump Replacement '
‘Throw Replacement (Internal Moving Parts)
Front Cover Shaft & Gears for H302, M301 & M302 frames
End User time and cost savings are derived from competitively priced RSPL kits.
RSPL kit prices are less than the total price of individual parts within the kit.
The application and content of each frame RSPL kit is described on the reverse side of
this Compressor News Bulletin.
Please Contact GE Geminl for additional Information at (361)693-3206 — Paul Orta.002851
Kit# KitName — Model Kit Description
Ki PM DEF-All —Oilfiter element and © ring seal
Ka Crosshead —_D-All Shoes, shims crosshead pin & caps. Body NOT included
Ki7 Throw Dall Xhead Ass'y, conn rod Ass'y, shims, Xhead pin & caps
25 Bearing —-D-2throw Main, conn rod & thrust bearings, Xhead pin bushings
26 Gaskel/Seal 0-2 throw Gaskets, O' rings and oil fter element
K27 Oil Cooler D-2 throw Gaskets, ©’ rings, fitter element and standard cil cooler
28. Oil Pump _—_D-2 throw Gaskets, ©’ rings, filter element and frame oil pump
K8 — Gasket/Seal_D-4 throw Gaskets, 0’ rings and oil fiter element
K11 OilCooler D4 throw Gaskets, ©’ rings, filter element and standard oil cooler
13 Oil Pump - D-4throw Gaskets, ©’ rings, fitter element and frame oil pump
19° Bearing —-D-4 throw Main, conn rod & thrust bearings, Xhead pin bushings
Kis Throw EA Xhead Ass'y, conn rod Ass'y, shims, Xhead pin & caps
K3_ Crosshead E8F-All_ Shoes, shims, Xhead pin & caps. Body NOT included
K5 Bearing E-2 throw Main, conn rod & thrust bearings, Xhead pin bushings
7 Gaskel/Seal_ E&F-2 throw Gaskets, 0 rings and oll fer element
K10 Oil Cooler E8F=2 throw Gaskets, O' rings, filer element and standard oll cooler
Kid. OilPump — E8F-2 throw Gaskets, O' rings. filter element and frame oil pump
K2 Bearing E-4throw Main, conn rod & thrust bearings, Xhead pin bushings
K6 — Gaskel/Seal E-4 throw Gaskets, ©’ rings and oil fit element
K9_— Oil Cooler EBF-4 throw Gaskets, O' rings, filer element and standard oll cooler
12 OilPump —EBF-4 throw Gaskets, O' rings, fiter element and frame oil pump.
K23 Oil Cooler E&F-6 throw Gaskets, 0” rings, filer element and standard oil cooler
K24 Oil Pump _—_E&F-6 throw Gaskets, 0” rings, filer element and frame oil pump
22 GaskelSeal E&F-6 throw Gaskets, O' rings and oil fter element
K42 Bearing 6 throw Main, conn rod &thrust bearings & Xhead pin bushings
K16 Throw F-All Xhead ass'y, conn rod assy, shims, Xhead & pin caps
Ké3. Crosshead F-All Shoes, shims, Xhead pin & caps. Body NOT included
K18 Bearing 2 throw Main, conn rod & thrust bearings & Xhead pin bushings
20 Bearing —F-4 throw Main, conn rod & thrust bearings, & Xhead pin bushings
K21 Bearing ——F-6 throw Main, conn rod & thrust bearings, & Xhead pin bushingsKitt
29
30
36
39
«40
K35
32
33
KitName
PM
Bearing
Gasket/Seal
Oil Cooler
Oil Pump
Crosshead
(Light)
Crosshead
(Heavy)
Throw
(Light)
Throw:
(Heavy)
Bearing
Gasket/Seal
Oil Cooler
Oil Pump
PM
Bearing
GasketSeal
il Pump
Shaft & Gear
Crosshead
Throw
Pkgicase
Pkg Only
PM
Bearing:
Gasket/Seal
Oil Pump
Gasket/Seal
PM
Bearing
Crosshead
Oil Pump
Shaft & Gear
Pigicase
Pkg Only
Throw
Gasket/Seal
Model
ACA
A2 throw
A-2 throw
A-2 throw
A2 throw
A-284 throw
A284 throw
A284 throw
A-28 4 throw
Ad throw
A-4 throw
A4 throw
A-4 throw
302
302
302
302
302
302 & 304
302 & 304
302 & 304
302 & 304.
304
304
304
304
301
M301 & 302
M301 & 302
M301 & 302
M301 & 302
M301 & 302
M301 & 302
M301 & 302
M301 & 302
M302
Kit Description
Oil fiter element and O' ring seal
Main, conn rod & thrust bearings & Xhead pin bushings
Gaskets, 0’ rings and cil fter element
Gaskets, O' rings, fiter element and standard oil cooler
Gaskets, 0’ rings, fiter element and frame oil pump
Xhead Ass'y, Xhead pin, caps & gaskets
Xhead Ass’y, Xhead pin, caps & gaskets
Xhead Ass'y, conn rod Ass'y, Xhead pin & std caps
Xhead Ass'y, conn rod Ass'y, Xhead pin & std caps.
Main, conn rod & thrust bearings & Xhead pin bushings
Gaskets, O' rings and oil filter element used within
Gaskets, O' rings, fiter element and standard oil cooler
Gaskets, ©’ rings, filler element and frame oil pump
Oil fiter element
Main, conn rod & thrust bearings & Xhead pin bushings
Gaskets, 0” rings and oil fier element
Gasket, ol fiter element and frame oil pump
Gears, shafts, pins & keys for front cover assembly
Xhead Ass'y, Xhead pin, gaskets & O' rings for 1 Xhead
Xhead Assy, conn rod Ass'y & Xhead pin
Rod packing, packing case assembly & gaskets
Rod packing & gaskets
Oil fiter element
Main, conn rod & thrust bearings & Xhead pin bushings
Gaskets, 0’ rings & oil fiter element
Gasket, oi fiter element & frame oil pump
Gaskets, © rings and oil fier element
Cilfiter element
Main, conn rod & thrust bearings & Xhead pin bushings
Xhead Ass'y, Xhead pin, gaskets & O' rings for 1 Xhead
Gasket, filter element frame oil pump
Gears, shafts, pins & keys for front cover assembly
Rod packing, packing case assembly & gaskets
Rod packing & gaskets,
Xhead Ass'y, conn rod Ass'y & Xhead pin
Gaskets, ©” rings & oil fiter elementGE Power Systems
compressor (ews :
Date: May 13,2002 Series: All
New Preservation Procedures for Frames and Cylinders
GE Gemini has revised its preservation procedures to allow for outdoor
‘storage for up to 6 months before re-preservation is required!
The most noticeable change in the preservation procedure is the red “preservation tag”
that is attached to every unit. This tag identifies when the unit was initially preserved
and when It must be re-preserved. Other features of the new preservation procedure
are:
4) Mobilarma 624 lubricating oil containing’ rust preventatives is used during
nodoad testing. Mobilarma 524 oil provides superior rust and corrosion
prevention and antioxidation characteristics.
2) NOX-RUST 502 petroleum based rust preventative is applied to all interior
surfaces of the frame, including the crankshaft. NOX-RUST 502 is miscible
with lubricating oils and does not need to be removed prior to packaging and
start-up.
3) 3M 4811 Preservation Sealing Tape is used.on the crankshaft and flywheel, If
Present, to prevent corrosion. The tape is applied to the piston rod of’
cylinders that are shipped loose.
4) The Oil Fill Cap on D, E, and F frames is now shipped loose in the tool box
that accompanies each frame. This prevents moisture from entering the
fram
5) Desiccant bags are placed in front of the crosshead in each guide. Desiccant
bags are also attached to the blind flanges for the cylinder suction and
discharge passages.
ANY ROTATION OF THE CRANKSHAFT COULD CAUSE THE DESICCANT BAGS TO
BREAK, CONTAMINATING THE FRAME AND CYLINDERS.C7
The following steps must be performed prior to packaging:
Compressor Frame Inspection and Preparation:
1) Remove all frame covers and remove the desiccant bags. Remove
the sealing tape from the breathers, crankshaft and oil fill cap.
Inspect the inside of the frame for corrosion and moisture. Remove
all traces of moisture with lint free cotton rags.
2) Any corroded parts must be removed from the frame before
attempting to remove any corrosion with abrasive media such as
emery cloth, crocus cloth or Scotchbrite. Failure to do so will result
in contamination of the frame with abrasive particles that will result
damage to the frame.
3) The frame oil should be changed after one hour of operation if the
frame has been stored outside for more than 6 (six) months.
Compressor Cylinder inspection and Preparation:
1) Remove the suction and discharge blind flanges from the cylinder
and remove the desiccant bags.
2) Remove the sealing tape from the piston rod.
3) _ Inspect the inside of the cylinder for corrosion and moisture.
e 4) Remove all traces of moisture with cotton rags. Any corroded parts
must be removed from the cylinder before attempting to remove
any corrosion with abrasive media such as emery cloth, crocus
cloth or Scotchbrite. Failure to do so will result in contamination of
the cylinder with abrasive particles that will result in damage to the
cylinder.
5) Oil the cylinder bore with the dil to be used for cylinder lubrication.
Replace the valves, valve retainers and valve caps,
Please Contact GE Gemini for additional Information
j JAGOMPRESSOR NEWSICN 02-007 - NEW PRESERVATION PROGEDURE.DOGGE Power Systems
Oil& Gas
‘Gemini
‘Subject: Cylinder Maintenance RSPL Kits Group: CYLGP’s
Number: 02-008 Sub Group: Cylinder
Date: May 29, 2002 Series:___D, E and F Series
Recommended Spare Parts Lists (RSPL)
GE Gemini has developed an array of compressor cylinder maintenance RSPL kits
designed to simplify ordering and shipping of all items needed to perform specific
maintenance or repair procedures.
The objectives of Gemini RSPL kits are:
e Minimize Customer's time required to order parts '
© Assurance that all parts are included for a given repair procedure
e Include small hardware, gaskets and seals with major parts in RSPL kits
e Expedite parts shipment by having RSPL kits pre-packaged
‘A combination of various RSPL kits may be ordered for cylinder overhaul
RSPL kits are designed for the following Cylinder maintenance and repair procedures in
‘addition to Preventative Maintenance:
© Rod Packing Replacement
© Rod Packing Gase with Packing
Piston Ring Kits with O-Rings
Liner Replacement
Valve Replacement
Valve Internals Repair
Piston and Rod Assembly
Variable Volume Clearance Pocket Seals
End User time and cost savings are derived from competitively priced RSPL kits. RSPL
kit prices are less than the total price of individual parts within the kit.
The application and content of each cylinder RSPL kit is described on the reverse side
of this Compressor News Bulletin.
Please Contact GE Gemin! for additional information at|
os.21-02 -JCompressor Newe-CN02-008-Cylndor Maintenance RPL Kits Page ots.GE Gemini Cylinder Kit Part Numbering System
, (Wo Spaces Between Characters)
Rod Packing Replacement Kit*
Example/Template: KRP,_E , 12.0-16.6 , Available Kits Do Not Include Distance Piece Models
v Ly cylinder Bore Diam. Range > See Table “A" For Choices
Kit Rod Packing 5 the Model (D:E.F)
Example KitIncludes: Part QTY Description
22-2107 1 Gasket-Aluminum Pkg Case to Cylinder
272-PS-2988 1 O-Ring False Head to Cylinder
216-PS-2988 4 O-Ring False Head to Packing Case
10-PS-6058 4 —_—Pressure Packing-TEICI
10-75-4288 -2-—_—Pressure Packing-TFEICI
10-PS-4338 «2 -~—_—~False Head Oil Wiper Per Packing-Ci
4.026114 2 Gasket-Cross Head Door
Rod Packing Case With Packing
Example/Template: KPC, CE, 420-465, Available Kits Do Not Include Models with Distance Piece
¥ Ly cyinder Bore Diam. Range > See Table “At” For Choices
Kit Packing Case EE me Model (0.6,F)
Example Kit Includes: Part # QTY Description
22-2107 1” Gasket-Aluminum Pkg Case To Cylinder
11-026744 1 Packing Case Pressure
272-PS-2088 1—_O-Ring - False Head to Cylinder
216-PS-2988 — 4-—O-Ring- False Head to Packing Case
11-PS-6058 4 ~—_—Pressure Packing - TFE/CL
11-PS-4288 = 2-—_—Pressure Packing - TFE/CL
11-PS-4338 ©—-2-—_“False Head Gil Wiper Packing - CL
1-026114 2 Gasket - Cross Head Door
* Must Order Separately Head End “O" Ring Per Cylinder Range as Required See Table “A2"
Piston Ring Kit With O-Rings*
Exemple/Template se DEF, 62
Ly cylinder Bore Diam. > See Table “B- For Choices
KitPiston Ring toda!
Example Kit Includes: Part # QTY Description
2042-10067 '§ ~——Rings-2 Pc CFT - 6.25" Diameter
445-PS-2987 1 O-Ring - Cylinder Head
GE Gemini Parts Sales: Contact Parts Specialist For:
Paul Orta Special Valves.
NACE Hardware
Legacy Models
‘Other Cylinders Not Listed
* Must Order Separately the Head End O-ring Per Cylinder Range as Required - See Table *A2"
05.21.02 -!AGompressor News-CN02-008.Cyindor Maintenance RSPL Kits Page 20f5002851
GE Gemini Cylinder Kit Part Numbering System
Liner Repl it Kit* (No Spaces Between Characters)
Example/Template: KCL, DEF, 127,
v ‘
Ly cylinder Bore Diam. See Table “B° For Choices
Kit Cylinder Liner pame Model
Example kit Includes: part QTY Description
81-PS-830 1 Dowel
5.031718 1 Liner- 12.75" D.E & F - 50,60 & 70 Frames
Valve Replacement Kit
Example/Template: KVR, DEF, 120-137
v Ly cylinder Bore Diam. Range > See Table
kit Valve
Replacement Model
Exemple Kit Includes: Part # QTY Description
1-01-5141 4 Inlet Valve Assembly
41-100078 4 Gasket - Seat - Soft Steel
260-PS-2987 8 O-Ring Cover to Cylinder
406-3301 8 O-Ring Cover to Studs
1-01-5142 4 Discharge Valve Assembly
e 441000078 4 Gasket Seat - Soft Steel
Scope:
Complete Set of Standard Inlet and Discharge Valve
Assemblies, Seat and Cover Gasket For One (1) Cylinder
Ive Internals Repair
Example/Template: _KVI, _DEF,
12.0 -13.7
12.0437,
Ly cylinder Bore Diam, Range > See Table “C" For Choices
a
kavave manos yy
Example Kit Includes: part # QTY Description
55141 2 Valve Plate - MT Meterial
111-01-55100 2 Wafer Spring
14-01-03262 48.—_Closing Springs (16 Inlet 32 Discharge)
41-400078 1 Gasket - Seat - Soft Stee! (Inlet)
44-100078 1 Gasket - Seat - Sof Steel (Discharge)
260-PS-2987 2 O-Ring - Cover to Cylinder
2
406-3301
‘Scope:
(O-ring - Cover to Studs
Plates and Springs to Repair 1 Inlet and 1 Discharge Valve,
‘Seat and Cover Gasket Included
GE Gemini Parts Sales:
Paul Orta
Contact Parts Specialist For:
‘Special Valves.
NACE Hardware
Legacy Models
Other Cylinders Not Listed
* Must Order Separately the Head End O-ring Per Cylinder Range as Required - See Table “A2
05-21-02
-INCompressor News-CN02.008-Cylinder Maintenance RSPL Kits
Page SotPi id Rod AssembI
Exemple/Template:
iston
Kit Piston Rod
‘Assembly
Part #
4.026875
9.484245
5-PS-16
4-611-386
4.011387
2.403164
2.102929
2067-1000067
460-PS-2987
1.026114
NOTE:
Example Kit Includes: ary
Nokeneesee
Ki
et
Frame Model (D5,06,E5,66,E7,F5,F6,F7)
GE Gemini Cylinder Kit Part Numbering System (Cont'd)
(No Spaces Between Characters)
Available Kits Do Not Include Distance Piece Models
Cylinder Bore Diam. > See Table “B" For Choices
Description
Piston Rod 2.25" Diameter
Piston Nut
‘Set Screw
Bushing - Piston - HE
Bushing - Piston - CE
Piston Hub (HE & CE) 12.6" Diameter
Carrier Ring - 12.5" Diameter
Rings Combo - 2p¢ CFT - 12.5" Diameter
‘O-Ring - Cylinder Head
Gasket - Cross Head Door
Piston Rod Assembly is Fully Assembled and Torqued.
ie DEF,
-
Part #
2-1000063
248-PS-2987
5-100014
1-PS-254
Example/Template:
45-65
Kit Variable
Clearance
ary
1
1
1
1
Example Kit Includes:
Variable Volume Clearance Pocket Seals
Gylinder Bore Diam. > See Table “D* For Choices
Qescription
Ring
O-Ring Seal
Thread Seal
Grease Fitting
GE Gemini Parts Sales: Contact Parts Specialist For:
Paul Orta ‘Special Valves
e NACE Hardware
pauroraGps gecom Legacy Models
Other Cylinders Not Listed
0521-02
-!8Compressor News-CN02-008.Cyknder Maintenance RSPL Kits
Page 4 0F5e GE Gemini Cylinder Kit Part Numbering System (Cont’d)
Table “A” (Rod Packing) ‘Table “B (Piston Rings, Liners and Table “C” (Valve Kits)
Piston Rod Assembly Kits)
D.E or F All Strokes D.E or FAll Strokes
Cylinder Rar in) ‘Gylinder Bore (in) Cylinder Bore Ranges (in
DSOI60 5.5-11.2 inc. 14.75NL 55 100 55-65 ne 70NL
120-165 87 102 67-77 inc. 8.25 NL
60 == 105, 85-97 ine 10.25NL
aa eee 62 107 10.0-11.2 ine. 14.75 NL
# 65 11.0 12.0 - 13.7 inc. 14.25 NL.
FSOIGO/70 5.8-11.2 ine. 11.75 NL Clair Ti) 14.0- 18.0
120-165 70 125 185-165
qe
: 75 130
77 135
65 140
a7 145
so 180
92155
95 160
e 165
Table “A1” Packing Gase Table “A2” HE “0” Ring For Table “D” (wvGPs)
With Packing Packing and Piston Rod
D.E or F All Strokes Part # D.E or F All Strokes
Cylinder Bore Ranges (in) Cylinder Bore Ranges (in Cylinder Bore Ranges (in)
*45-5.2inc SSTLEONL 441-PS-2087 45-65
oO Rear TeM -85-BSkc rom 445-PS.2087 67-97 me. s025N
ioataes 67-77inc 825. 448-PS.2987 10.0 ~13.7 ne. 11.7560
85-97 ine 1028M. — 482-PS-2987 140-165
ES0I60/70 5.5-6.5 nc 70M. 100-112 ine 125M. 455-PS-2987
G7-11.2ie14.75N 12.0137 ne 425K 460-PS-2987
120-165 140-150 466-PS-2987
F50I60/70 5.5 -6.5 inc. 7.0NL ares Beadle
= 11.2 ine
Stee een
NOTE:
1. Designation above Refer to Cylinder Designs with MAWP up to 2200 PSIG and are Only Include Those For
Which Kits are Available... See Parts Specialist for Other Sizes or Pressure Ratings
2. 114 and 3/4 inch Bores are Truncated in the Nomenciature to .2 and .7 Respectively.
3. Valve Kits are '95 Series Cylinder Models Except 5.5-6.5 in Bore Cylinders and are Designed for Standard
Valves Only
GE Gemini Parts Sales: Contact Parts Specialist For:
Paul Orta Special Valves.
NACE Hardware
[email protected] Legacy Models
Other Cylinders Not Listed ie Pipeline and Other Sizes
05-21-02 J8Compressor News:CN02-008-Cylindor Maintenance RSPL Kits Page Sof5002851
GE Gomini
2707 North Loop West, Sufte 200
Houston, TX 77008
@ GE OIL AND GAS
compressor (2.5
Low Lift Valves Group: D,E,F
03-004 ‘Sub Group: All
A 03 95 Ser id
‘A quick solution to impact related valve problems is to convert the cylinder to low lift valves.
Although it is expected that some performance will be sacrificed with this approach, this,
approach has been proven to be an effective method of solving impact related valve
problems. Below is a listing of the low lift valves currently available for the 89 & 95 Series of
watercooled, linered cylinders sold with the GE Gemini Model D, E, and F Frames (formally
designated 550, 650, 565, 665, 765, and DH). Low lift valve options for the remaining
cylinder sizes will be relayed at a later date.
MAWP
(Psig)
Bore
Diameter
# Valves
Valve Type _Per End
BSEa | — SOD Ota | OTTO ROTRET | TOSS
rare | iso wor arsow | ansows | oreo | cessor
ases | tooo act ors | xagssiat | xcorssrae | xansntea
woorto | i250 arc 4 Xovsoure | Jeossoun | xorsoure | Xonsoure
wzoi3s| soo vaacr__s__—Xarasrar | xossorat | xovanvas | xossotes
standard | towiin
Inet Vave_} net Valo
Discharge charge
Valve Valve
ce | Tow
Valve Nomenclatu:
X-01-XXXXX = Standard Valves
X-03-XXXXX = Low-Lift Valves
X-05-XXXXX = NACE Valves
The use of the “03” digits in the valve
part number indicates a low lift valve.
GE Oil & Gas
2707 North Loop West, Suite 200
Houston, TX 77008
713-803-0900 (Switchboard)
713-603-0499 (Fax)
wwiw.gepower.com\Gemini
weww.gepower comlgil&gas
Valve Impact Force is a function of mass
and acceleration, by reducing the
distance the-compressor valve plate
travels, the time upon which the valve is.
. allowed to accelerate prior to contacting
the damper spring is reduced.
Low Lift Valves can affect compressor
capacity and horsepower. Please
contact GE.Gemini for a performance
estimate.
Low Lift valves are priced competitively,
and available on short notice.
Contact the GE Ger
for price and delivery.
parts department
Emergency Phone Numbers:
Parts: 832-978-6233
Service: 832-978-9780
oe ‘Compressor News\CNO3-004 Low Lit ValvesGE 1333 West Loop North, Suite 800
Houston, Texas’ 77027 U.S.A.
OIL & GAS ete
mye i
compressor (jaws
Subject: © PRODUCT UPGRADE NOTICE Group: Frame
Number: 03-005-1 Sub Group:
Date: June 12, 2003 Series: D, E&F
Date: june 12,2003 Series: DEF
Crankshaft Upgrade - Model D, E, and F Frames
As part of the GE Oil & Gas commitment to deliver quality products to our Oil & Gas customer,
we are pleased to announce the following product improvement,
The crankshafts for the D, £, and F series of compressor frames will now be offered with
integral counterweights. When our current inventory of crankshafts. with “bolted: on”
counterweights is fully utiized, all future crankshafts will have “integral” counterweights, We
‘anticipate thet all new crankshafts shipped from GE Oil & Gos - Oshkosh will have integral
counterweights by Fall 2003
Both the "bolted on” and “integral” counterweights designs are fully interchangeable, Also,
both crankshaft designs are fully warranted by GE Oil & Gas, per the terms of our applicable
Packager or distributor agreement
There is no anticipated change in price related to this product improvement. if you have any
‘questions, please don't hesitate to contact the GE Oil & Gas- Gemini team.
Regards
Crankshaft with integral Counterweights
Colman de Jong
Director of Sales and Marketing - Gemini
GE OI & Gos
2707 North Loop West, Suite 200
Houston, TX 77008
713-803-0444, 713-803-0499 (Fox)
[email protected]
www.geoilandgas.com
'¥you hove ony questions concerning this procedure, please contact GE's Technical Hotline
24 Hour Assistance Phone Numbers:
Parts: 832-978-6233
Technical Service: 832-978-9780
oes (Compresser NowsiCN 03-008-4e @ GE ENERGY 2707 North Loop West, Suite 200
Houston, TX 77008
OIL AND GAS USA
compressor ews
Subject: Discharge Temperatures Group: All
Number: 04-002 SubGroup: All
The following clause has been added to all of our operations manuals:
Cylinder Discharge Temperature
‘Shut Down Setting Recommendations
The purpose of the discharge temperature switch setting is to shut the unit down
e due to rising temperature of a given cylinder before major damage results,
Discharge temperature shut down set point of each cylinder is as follows:
The discharge temperature shut down set point of each cylinder must be
set at 10% but NEVER more than 25 degrees F. above the highest
NORMAL. daily discharge temperature of that cylinder.
Due to changing operating and ambient conditions, itis the operator's
responsibilty to daily check, justify, confirm and adjust (as may be
required) all safety shut down devices.
‘The maximum allowable operating temperature on the cylinders is 350 degrees
F. on hydrocarbon gases.
24 Hour Emergency Phone Numbers:
Parts: 832-978-6233
Tech Service Support: 632-978-9780
@ www.geoilandgas.com
eee Compressor Newson 64-002GE Energy GE Energy Ot 8.6, ne
2707 North Loop West, Suite 200
Oil & Gas Houston, Texas 77608 USA
com pressor [ews
The attached recommendations for the maintenance of GE Oil & Gas high speed
reciprocating compressors is being added current GE Gemini Operation and
Maintenance manuals.
!fyou have any questions concerning this procedure, please contact Geminis Technical
Hotline.
GE Oil & Gas
Emergency Phone Numbers:
Parts: 1832.978-6233,
Service: 832.978.9780
GE Oi & Gas
Gemini High Speed Reciprocating Campressors ~ Headquarters
Sates, Parts, Service Customer Service
207 North Loop West, Suite 200
Houston, TX 77008
Tel. 1-713-603-0960 (Switehboara)
Fax 17-713-803-0498
wn. geoilandgas.com
1 OF 4 Compresscenewscn orang “SeGE Energy GE. Ena O18 Gas, re.
2707 North Loop West, Suite 200
Oil & Gas Houston, Texas 77008 USA
Gemini Compressors - All Models
Recommended Maintenance
All operating compressors require a periodic maintenance program, It should be
established in conjunction with any recommended startup and initial operations checks.
The program should be reviewed at regular intervals and modified as required to address
any special situations or concerns.
A compressor maintenance logbook should be kept on each unit. The logbook allows for
detailed records, so that maintenance costs, troubleshooting and trending can occur. An
operator's log sheets should be routinely reviewed by qualified personnel, to determine
‘compressor any maintenance or performance trends.
The frequency of a compressor's maintenance intervals is determined by a number of
factors, including its physical operating environment, actual operating conditions and the
degree of gas contaminants. If performed and documented properiy, a unit's
maintenance history will be well documented should any troubleshooting situations arise.
A regular compressor oil analysis program is recommended through the oil supplier,
‘even if the crankcase sump is sweetened with makeup oil due to cylinder lubrication use.
Compressor oil service change intervals are based upon your oil supplier's specific
analysis recommendations. If the oil supplier recommends a more frequent oil change
interval than Geminis, then his recommendations should be followed. Ifa situation
develops that contaminates the crankcase sump, the compressor oll should be changed
as recommended, with the problem's cause determined and corrected.
The following typical maintenance program Is offered as a basic guide only, and may be
expanded due to actual operating conditions. Time intervals begin with the startup of the
unit. This program assumes the compressor operates continuously, 80 the time hour
intervals are loosely tied to daily, monthly, quarterly, semi-annual & annual time intervals
If maintenance. is performed on hourly record micrometer readings based time frames,
refer to the associated time interval column.
FOF 4 Compressor NewsCN OF.008GE Energy
GE_Enorgy O18 Gas, Inc.
f 2707 Noth Loop West, Suite 200,
Oil & Gas Houston, Texas 77008 USA.
Maiitefance CRSCe= Dall) HSER
Frame oil supply pressure, 45 to 55 psig, adjust pressure regulating
valve as required when unit at normal operating speed & temperature. | 24 hours
Note: 30 psig falling pressure, minimum Low Oil Pressure Shutdown.
Frame oil supply temperature, adjust cooling water flow as required Pa hous
Note: Maximum 185°F - high temp shutdown, 180°F Minimum.
Cooling water flowitemperature, for oll cooler & cylinder cooling 2a Rous
Frame oil level, mid-evel of sight glass - hot 24 hours
Gil fiter differential pressure, filer housing pointer or gauge(s) 24 hours
Note: Change fiter element fcfferential pressure exceeds 10 psid
Cylinder lubricator Box cycle fime, seconds/cycle (Max 100 seticycla) | 24 hours
Note: See job book for unit specific break-in & normal lube rates
Cylinder lubricator oil supply level, separate day tank used 2a hours
‘Compressor Leaks — oil, gas or water, correct as required 24 hours,
‘Compressor operating conditions compressor RPM, 24 hours
suction/discharge temperature & pressure by cylinder
Valve cover temperature — each suction & discharge valve by oyinder_| 24 hours
High cylinder discharge gas temperature shutdown, lesser of 10% or
25°F above normal discharge temperature of each cylinder 24 hours
Note; 350°F shutdown, max allowable gas discharge temperature
Process gas pressure shutdown set points — high/low settings fo be aS
close as practical to actual operating conditions, Set points are
typically 10% above and below normal operating pressures. Confirm 24 hours
hile pressure shutdown points will not aliow operation in excessive
rod load conditions.
‘Unusual noises or vibrations: Da hours
‘Scrubber level & drain operation 24 hours
‘Check gas vents for leakage — piston red packing, blow down & 24 hours
pressure safety valves (PS\
(Check vent lines for ice blocks, when ambient femps below 40°F. 2a hous,
eaeeeaL
720 hours
‘Normal panel & gauge operation 720 hours
Verity cylinders lubricating oil presence, i oyinder operating pressure
‘eater than 3500 psi (verify lubrication fim adequate with 2 cigarette | 720 hours
Paper swab test along oylinder wal)
‘Grease VVCP unloader stem threads 720 nours,
‘Check cylinder lube line check valves for high temp and/or leakage "720 hours:
3 OF4
Compressor Newscnce-oo6 "=@ GE Energy
G.E. Energy Oil& Gas, Ine
2707 Noth Loop West. Suite 200
Oil & Gas Houiton, Texas 77008 US.A
[hime Interval Zs
| Check frame & crosshead guide mounting bolts for fghtness, “shim & 2000 hours
fe-torque as required to eliminate any “soft foot" found.
External frame & cylinder fasteners, for loose or broken bolts 2000 hours
‘Check discharge bottle supports snug fit adjustment, with unit 2000 hours
stabilized at normal discharge temperatures
Drain pulsation bottles liquids, inlet and discharge 2000 hours
‘Remove and inspect process gas a screen strainers (if used) 2000 hours
Tineareral
Compressor crankcase oil, ‘change. OF: 28 recommended by =
‘supplier's monthly oil analysis 4000 hours
Note: Remove crankcase top cover & inspect intervals for foreign
materialidebris whenever oll is changed
Frame oil filter, change or ff differential pressure exceeds 10 psid 4000 hours
Inspect cylinders’ valve for damaged or broken components, rebuild or 4000 hours:
replace as required
(lean crankcase breather ooo RUS
ee Checks Annuals
ee Sma oiecoe
significant pressure & temperature points
@
Check drive alignment, coupling (rim & a ineluding axial thrust. ‘8000 hours
‘Check eriical frame running gear clearances — main, connecting rod & | 8000 hours
thrust, if readings outside tolerance limits, repair or replace affected
‘components as required
‘Check critical crosshead pin/bushing & guide clearances, record ‘8000 hours
micrometer readings. If readings outside tolerance limits, repair or
replace affected components as required. Replace pin roller bearings,
ifso equipped,
Inspect cylinders’ valve for damaged or broken components, rebuld or | 6000 hours
replace as required
Inspect cylinder bores for wear or damage, record micrometer ‘8000 hours
readings
Pull cylinders piston rod assembly — clean & inspect for wear, replace | 6000 hours
worn or damaged components as required
Rebuild packing cases ‘8000 hours
Record clearances between crosshead & guide bore, by throw 4000 hours
Pressure (leak down) test cylinder’s lubrication distribution block(S) ‘8000 hours
assemblies, replace oF repair as required
Inspect "no-flow” on cylinder lubrication distribution lube blocks for 8000 hours
roper operation
Change or re-cerfy process pressure safety valves (PSV) ‘8000 hours
Calibrate and re-certify accuracy of gauges and transmitters, for all "8000 hours
‘Compressor Newsicn 04.006 See GE Energy eee cee ie
Oil & Gas "amon Teae 17608 USA
compressor (jews
Subject: Trouble Shooting Group: All
Number: 04-007 Sub Group: All
Date: 17 Sept 04 Series: A
The attached trouble shooting procedures have been added to the current GE.
Gemini Operation and Maintenance Manuals.
Ifyou have any questions conceming this procedure, please contact Gemini's
Technical Hotline.
GE Oil & Gas
Emergency Phone Numbers:
Parts: 832-978-6233
Service: 832-978-9780
GE Oil & Gas
Gemini High Speed Reciprocating Compressors ~ Headquarters
Soles, Parts, Service Customer Service
207 North Loop West, Suite 200
Houston, TX 77008
Tel. +1-713-803-0900 (Switchboard)
Fax +1-173-805.0499
www.geoilandgas.com
1 of7
Compressor NeweiGN 04.007GE Energy GE Energy O18 as, ne
fs 2701 Noth Loop West, Sue 200,
Oil & Gas Houston, Texas 77008 US.A
GE Gemini High Speed Reciprocating Compressors — All Models
Compressor Trouble Shooting
Minor situations can occur during the operation of a GE Gemini compressor that
Fequire trouble shooting. Otten these situations can be attributed to gas.
contaminants (liquid & solids carryover), actual conditions different from design
(improper adjustments), unsuitable lubricant selection, or operating personnel
unfamiliar with the compressor and its setup. These difficulties can usually be
addressed with personnel training, proper lubricant selection, proper compressor
adjustments, correction of adverse operating conditions, or replacement of minor
parts.
Major situations may also occur, generally during longer periods of operation
Often these situations can be attributed to use of the compressor for purposes
different than design, unsuitable lubricant selection (generally cylinders & packing
lubrication), valves not tailored for operating conditions, or improper operations
and maintenance,
|tis important to use a compressor log sheet to record interstage pressures and
temperatures by stage on multi-stage compressors. When interstage operating
conditions vary from normal it indicates trouble with one of the stages. Generally,
when the interstage pressure suddenly drops look at the lower pressure cylinder. If
the interstage pressure suddenly rises look at the higher pressure cylinder.
The following trouble shooting cause and effect is offered as a basic guide only. It
lists the more common issues with their most probable causes. It may be
expanded to address specific package designs and actual operating conditions
Situation Potential Common Causes
Compressor Gylinders gas pressure loaded
Will Not + Piston end clearance improper, piston hiting head end head or
Rotate crank end head
* Foreign, incompressible material in cylinder
+ Mechanical seizure in running gear (crankshaft, bearings,
connecting rod, crosshead, packing/piston rod, piston)
Cylinder Noise + Piston loose on rod
Or Knock «Piston end clearance improper, piston hitting head end head or
crank end head
* Loose crosshead batance weight
‘+ Damaged crosshead or excessive clearance
‘+ Loose crosshead pin or pin caps
* Loose packing case or false head
+ Broken or leaking valves
* Worn or damaged piston rings or wear Band
* Valve improperly seated or damaged seat gasket
‘Cylinder incompressible contaminants, liquid or solid carryover
3
2 of7 Compressor NewsiON 04-007GE Energy GE Energy O18 Gas, ne
fs 2707 North Lop West, Sue 200,
Oil & Gas Houston, Texas 77008 USA
GE Gemini High Speed Reciprocating Compressors — All Models
Compressor Trouble Shooting
Situation Potential Common Causes
Frame Noise Loose crosshead pin or pin caps
Or Knock * Loose or wom main, crankpin or crosshead bearings
‘Knock coming from cylinder end
+ Loose crosshead balance weight
+ Damaged crosshead
+ Loose crosshead pin or pin caps
+ Improper lube ol selection
Cylinder or ‘+ Compressor frame or crosshead guide mounting bolts loose
Frame + Discharge bottle wedges loose or improperly adjusted
+ Drive train misalignment
+ Bottle/piping acoustical pulsations
‘+ Excessive crosshead guide clearance (crosshead stap)
Low oil + Low oil level
‘Supply + Oil pump faiture
Pressure ‘* Oil pump cavitation from excessively cold oil
* Oil pressure regulating valve improperly adjusted
*Oil fiter element — ditty, restricted or collapsed
‘Low oil pressure switch setting too low
+ Defective pressure gauge
* Oil foaming - high ol level being struck by counterweights
* Internal running gear leakage - excessive bearing clearance
High Oil * Cold oil
Supply * Oil pressure regulating valve improperiy adjusted
Pressure * Defective pressure gauge
Low/High Oil '* Cooling water supply restricted
Supply * Cooling water isolation valves closed
Temperature * Temperature control valve temperature incorrect, ‘improperly,
installed or stuck
Crankcase Oil —_* Oil makeup system isolation vaive ciosed or strainer plugged
Level High/Low — « Oil makeup system out of adjustment or leaking
‘* Cold oil / insufficient head pressure
High Oil Filter + Filter media plugged
Differential * Cold weather / high oil viscosity
Pressure ‘+ Oil contaminated with water (condensed during shutdown)
* Oil pressure gauge(s) reading improperly
_ ££e GE Energy eae
; ja oacmmnes oan
Oil & Gas Houston, Texas 77008 USA
GE Gemini High Speed Reciprocating Compressors — All Models
‘Compressor Trouble Shooting
Situation Potential Common Causes
"No-flow” Lube line blockage of crushed tubing, causing rupture disk to
Shutdown, blow-out
Cylinder Lube» Rupture disk cap torque excessive, scored disk lowers rupture
pressure setting
* Incorrect rupture disk or fiting for application
+ Inadequate lube oil supply to pump
‘+ Faulty high pressure oil pump feeding distribution blocks
+ Distribution block failure
+ DNFT failure
* Oil injection point check valve blockage or failure
Valve Breakage © « Liquid canyover
or Wear '* Improper valve tailoring — lift, material, springing, assembly
Abnormal ‘* Solid abrasive debris entering cylinder with gas stream
‘* Excessive oil supply
'* Off design operating condition
+ Gas composition change
* Gas system resonant pulsation
Carbon Coated — + Excessive cylinder lubricating oil
Valves + Improper cylinder lube oil selection
‘+ Oil carryover from inlet scrubber or from previous stage
‘* High temperatures from leaking or broken valves
+ Excessive temperatures due to high compression ratio across
cylinder
+ Excessive temperatures due to high inlet gas temperature to
cylinder
Packing Over inadequate lube oil supply rate, break-in versus normal rates
Heating + Lubrication supply failure
‘+ Inadequate packing water coolant flow. if so equipped
‘+ Improper lube oil selection and associated lube rate
‘= Worn packing rings
+ Contaminants (liquid or solid) affecting packing rings
+ Improper packing ring side or end clearance
fon rod wear ~ scored, tapered or out of round
+ Excessive piston rod run out
2GE Energy GE Energy O18 Gas, ne
2707 Norn oop West Sate 200
Oil & Gas Houston, Texas 77008 USA
GE Gemini High Speed Reciprocating Compressors — All Models
‘Compressor Trouble Shooting
Situati Potential Common Causes
Excess Worn packing rings
Packing + Packing case bolts loose
Leakage + Packing rings incorrectly assembled/nstalled
+ Improper lube oil selection and associated lube rate
‘+ Contaminants (liquid or solid) affecting packing rings
‘* Packing not seated or property run-in
‘+ New packing installed on worn rod or damaged packing case
‘Improper packing ring side or end clearance
‘* Piston rod wear — scored, tapered or out of round,
+ Excessive piston rod run out
Piston Rod or —_» Cylinder or piston wom or scored
Packing Wear —_« Oil dilution from liquid carryover
Excessive ++ Improper cil supply — excessive or inadequate
‘Inadequate lubrication — incorrect oil type, viscosity or amount
+ Solid abrasive debris entering cylinder with gas stream
‘+ Piston Rings Worn, Stuck or Broken’
Ring, Piston, _ Piston Rings Worn, Stuck or Broken
Liner & Cylinder + Cylinder or piston worn or scored
Wear Excessive — « Oil dilution from liquid carryover
+ Inadequate lubrication — incorrect oil type, viscosity or amount
* Solid abrasive debris entering cylinder with gas stream
Piston Rod Oil» Wom packing rings
Wiper Packing + Packing rings incorrectly assembled/installed
Leaks * Packing not seated or properly run-in
‘+ Worn or scored piston rod
‘= Contaminants (liquid or solid) affecting packing rings
‘* Improper packing ring side or end clearance
_— 2GE Energy GE. Energy O18 Gs. re
Oil & Gas
2707 North Loop West, Suite 200
Houston, Texas 77008 US.A.
GE Gemini High Speed Reciprocating Compressors — All Models
Compressor Trouble Shooting
Potential Common Causes
Excessive compression ratio across cylinder — back pressure from
Gas Temperature leaking suction valves or piston rings of next higher stage cylinder
High Discharge
Gas Pressure
Inadequate
Compressor
Output Flow
Crankshaft
Drive End
Seal Oil Leak
* High cylinder suction gas temperature
+ Reduced cylinder suction pressure - flow restriction, inlet strainer
Screen debris, suction pressure control valve or inlet scrubber
restriction
‘+ Leaking discharge valves or piston rings
‘+ Fouled intercooler piping
+ Improper lube oil selection or rate
# Change in cylinder mode of operation, from single acting (SA) to
double acting (DA)
‘+ Excessive compression ratio across cylinder - back pressure from
leaking suction valves or piston rings of next higher stage cylinder
‘Downstream line obstruction or isolation valve closed
‘+ Unit recycle, vent or scrubber dump valve open or leaking
‘* Compressor speed lower than rating
+ Compressor suction pressure lower than rating
‘+ Cylinder head end VVCP unloader improperly adjusted
* Suction pressure gauge reading higher than actual
* Incorrectly calibrated gas flow meter
+ Damaged or incorrectly installed orifice plate in gas flow meter
‘+ Leaking vaive around gas flow meter
+ Liquid drop out between stages of compression ~
+ Downstream line obstruction or isolation valve closed
+ Damaged cylinder valves
+ Damaged piston rings
+ Incorrect compressor valve use, valve not properly tailored for
application
‘+ Metered gas flow inaccurate or not counting upstream deductions
for engine startfuel gas, dehydration unit and other auxiliary
equipment
‘+ Clogged top caver breather
+ Back pressure from excessive cylinder packing leak
+ Excessive seal wear due to drive coupling misalignment
+ Excessive seal wear due to incorrectly adjusted front cover
6 of7
‘Compressor NewsiCN 04-007GE Energy ron SE FONE Ges re
; 07 Nori Locp Vest Sut 203
Oil & Gas Houston, Texas 77008 USA
GE Gemini High Speed Reciprocating Compressors — All Models
Compressor Trouble Shooting
Potential Common Causes.
Faulty or improperly adjusted pressure safety valve (PSV)
‘+ Back pressure from leaking suction valves or piston rings of
higher stage cylinder downstream
‘+ Downstream line obstruction or isolation valve closed
+s Discharge line check valve restriction - sticking or damaged
‘* Gas cooler tubing restriction fouled or exceeds flow capacity
— 2GE Energy GE. Energy O18 Gas. re.
2707 North Loop West, Suite 200
Oil & Gas Houston, Texas 77008 USA
compressor (aws
Subject: “Hold Down”Bolts
Number: 04-011
All Frames
All
‘The GE Gemini compressor installation and maisitenance manuals are being modified to include the
following information.
‘The attached table lists the hold down bolting sizes and minimum torquing requirements recommended for
(GE Gemini reciprocating compressors. High strength studs and bolts are recommended to secure the
‘compressor frame feet and crosshead guide to the compressor skid. Proper hold down bolting selection,
installation and torque are required to transfer and resist normal inhecent reciprocating compressor shaking
forces and couples into this skid, Failure to install and maintain compressor mounting fasteners can resuit
in equipment vibration, drive train misalignment and compressor main bearing bore misalignment.
Reciprocating compressors will develop unbalanced farces and couples due to the tolerances in the
reciprocating weights and the offset of the compressor throws. The resulting unbalance results in the
presence of horizontal and vertical forces and horizontal and vertical couples. The compressor skid and
foundation must be designed to dampen and transfer these shaking forces originating from the compressor
into the skid and foundation. Secure mounting of the compressor frame and crosshead guide to the skid is
necessary to minimize the vibrations associated with these forces.
Note: Bo't lengths extending only through the compressor mounting foot & Kbeam may not be sufficient
to prevent loosening. All hold down bolts must be periodically checked for tghtness, and
retightened as required
Bolting Requirements
1. The compressor frame's hold down bolt is typically 1/8" smaller in diameter than the mounting foot
hole opening, unless otherwise specified
2. The length of hold down boting should be as long as possible and stressed using a torque value
appropriate with the batting material
The following “Compressor Hold Down Botting” table lists the minimum frame foot and crosshead
guide bolting sizes and torque requirements.
Use of the tabled values is based upon bolting materials with proof loads greater than 100,000 psi
Higher strength bolting material is preferred,
Compressor frame foot bolting typically uses ASTM A193 GR B-7 threaded studs or Grade 8 bolts,
along with hardened steel washers and ASTM A194 nuts.
Hold down botting used for M&H model compressor mounting and all models’ crosshead guide
‘Suppor is recommended to be Grade 8 or 9 bots.
Tighten the mounting fastener to stress its material to a value greater than 55% of its proof load
rating. A higher strength bolting material will result in torque values higher than those listed.
8. Hold down bolt torque value, ‘sof foot deflection and proper crosshead guide support shimming
verifications must be made at startup and periodically during the compressor's normal operation.
Bolt Fastener Tightening
1. Fastening hardware's threads and contact surfaces are to be clean and free of burrs or dings. This
includes bolt, stud and nut threads, along with washer, nut, bolt head and associated contact
surfaces,
2, Threaded fasteners are to be installed free turing, with minimal hand force.
eee eee mene eee
1 OF 2 compressor NewsCn o4-011@ GE Energy Oe ce ora ce
2707 North Loop West, Sute 200
Oil & Gas Houston, Texas 77008 USA
3. Torque values are based upon the use of a petroleum lubricant applied to both the threads and
seating surfaces. Use of the compressor sump’s SAE 30 or 40 WF oll is preferred,
Caution: Friction reducing lubricants, such as molybdenum disulphide or Never-Seez, are not to be
Used unless specified. Friction reducers using the specified torque values can result in excessive
fastener stresses,
4. Fasteners should be installed with some radial clearance. Avoid placing the fastener threads in
shear or loaded against the fastener's opening in the feet or skid
5. Use a calibrated torque wrench, and a torque multiplier as required
6. Incorporate hold down bolting torque verification and soft foot checks inlo your routine compressor
maintenance program
Frame Foot Crosshead Guide to Suppor
GE/Gemini Hole | Recommended | Torque Torque
Reciprocating | Diameter | Boltor Stud | Range. tb-t| Bolt Size _|_Range, Ib-t
Compressor inch Size Min [Max] inch TPL [Min | Max
Model ch - TP
iY Threaded |“5/8"- 77 UNC | 160] - NA fees
boit hole,
Gi Threaded [~3/"-T0UNC [250] NA - p>
bolt hole
@ a 8" 7-8 420 | -460_| 5/877 UNC | 100 | 120
5 T 71-8 | 280 | 300 |“3/a"- 10 UNC | 200_| 220
“Dazz 74 Tae 4-10"-7 | 845 | 880 | 3/4710 UNC | 200 | 220
[_ D602 7 607 1-3/8 1a -7 845 [880 _|/3/4"- 10 UNC _|~200 [220
5047608 | 7-172" 4-3/8"-6 [1100 | 1140 | 3/4" 10 UNC | 200 | 220,
E 12" 4-3/8"=6 [1700 | 1140 | 3/4" 10 UNC | 200 | 220
FE 172" 4-3/8"= 6 |1100 [1140 |-3/4"— 10 UNC | 200-| 220
1-3/8" 7-318"—6
sume | (44mm) | (35mm) __| 1400 | 1140] 4-38"-6 | 1100 | 1140
Reciprocating Compressor Hold Down Bolting Table
Notes:
1. Larger compressor frame feet have a “through bolt” hole that can accommodate an all-
thread fastener, hardened washer & nut
2. M&H compressor frames incorporate threaded bolt holes, bottom iocated, for
‘compressor mounting, These units do not have an additional crosshead guide end
‘support. Use Grade 8 or stronger bolts to mount the framelguide combination to the skid,
eee eee
2 OF 2 Compressor Newscn O4 011GE OIL & GAS £046 605,
1335 West Loop Noth suite 800
Houston, Texas 77027 USA
compressor ews
Subject: “Rupture Discs” Group: Frames
Number: 05-003 Sub Group: Lubrication
Date: 23 June, 05 Series: All
Operating Manuals for high-speed reciprocating compressors are being modified to include the following
information,
Cylinder Lubricator System - Over Pressure Protection
A thorough understanding of the cylinder and packing lubrication system can improve compressor rliobilty,
‘and prevent damage to components,
The Basic System
Figure #1 represents 0 typical cylinder (and piston rod packing! lubrication system, Oilis pressurized by o
lubricctor pump, then fed through stainiess st2el tubing to @ divider Block ossembly that meters the ol to the
cylinder bore(s| and pressure packing. & typicol system includes
‘+ Check vaives,to prevent oil from traveling in reverse direction
‘+ Overpressure indicator rupture cisk to prevent damage tothe system by high pressure,
* Aino flow switch, [ONFT or Kenco ore our current standards) io rip the compressor in situations when
flows inadequate,
+ Cycle pin indicator to provide visual confirmation of system cycles.
‘Arrangements will vary depending on the compressor configuration, ond with the operating system's conditions
‘of service. Contact the Technical Services hotline with specific questions about your system.
System Function:
Ifa blockage occurs in the divider blocks, lube lines, check valves or injection points, the system will Increase
Pressure to overcome the blockage, Excessive system pressure is limited by the use of an over pressure
Protection device (rupture disk located between the pump dischorge and the distribution blocks. When the oll
pressure exceeds the roting of the rupture disk, a charge of lubricating oilis released. Without ol flow, the
‘ubrication “no flow" switch will activate, normaly shutting the unit down,
cece ottobre sano
a ee
Figure #1: Typical Cylinder Lubrication System Schematic
cee Compressor NewsiCN 05.003,GE OIL & GAS 6086 os In
1535 West Loop North, Suite 600,
Houston, "ence. 77027 USA,
compressor (jews
Important
Itis necessary to have a properly sized ond working atmospheric rupture ossembly instolled in all lubricating
divider block systems. Never remove, modify or plug on atmospheric rupture assembly since equipment
damage con result. The exclusive use of genuine OEM componentsis recommended (see Tobe 1.
Trouble Shooting
Typical causes of Lubrication blockage in divider biock systems oe
4. Crushed or pinched a tubing lines
2. Contamination blockage - crt or foreign material affecting systern components
3. iror gos inthe system - con cause system lockup. inadequate lubrication or intermittent (phantom)
lubicotion shutdowns
Blocked of injection points)
Improperly driled ol passoge
Incorrect magnetic housing assernbly instaliotion,cousing divider block pistons] to over travel and jam,
Details:
‘Atmospheric rupture assemblies contain on aluminum disc, which is sized and designed to rupture ct o
designated pressure, venting lubricating oll to the atmosphere, The pressure ot which the disk ruptures Isa
function of the aluminum disc's thickness and corresponding fitting cop hole diameter, The different discs are
‘color coded to indicate the relieving pressures. Rupture disc pressure ratings ore selected based upon the gas.
‘operating conditions and MAWP of the cylinder {and packing casel being lubricated. Table 1 ists rupture disc
‘ossemblies for both 1/8" and" cop holes, along with replacement dises by color thot can fit ether assembly
Medium Pressure Assemblies
‘Medium pressure (less thon 3500 psilrupture assemblies typically use a 1/4” (0.250 inches, 64 mmlcop hole. see
Figure #2,
High Pressure assemblies
High pressure (greater than 3500 psi rupture assembles typically use o 1/8" 0.125 inches, 32 men) cap hole, see
Figure #2, ‘
—
NOTE:
@ Torque Cap to no more
e@ e@ Color Coded Rupture Disks than 3 ft-lbs (36 in-lbs).
Figure #2: Rupture Assembly, with either a {" medium pressure or 1/8" high pressure cop,
20F 3
Compressor NewsiCN 06-003@ = GEOILSGAS ania
1535 West Loop North, Suite 800
Houston, Texas 77027 USA,
\\ fe
al WV a)
4" Medium Pressure! 1/8" High Pressure Replacement Rupture Discs
Rupture Disc Assembly Rupture Disc Assembly
Porte Re Port # Rating, Part # Color Thickness
Pst PSI Inches
1-PS-5808 900 NA Black 0.006"
2-PS-5808 1150 N/A Green 0.008"
3PS-5806 —-1480=«12-PS-5808 3700 Yellow 0.010"
4-75-5808 «1750 ——«13+PS-§804 4600 Red 0.012"
5-75-5808 2050 «14-PS-5804 5500 Orange 0.014"
6-75-5808 2350-«—15-PS-5804 6400 Aluminum 0.016"
8-P5-5806 2950 «16'PS-5804 7300 Blue 0.020"
9-75-5804 «5250. -—17-PS-$804 «8400«««58-PS-5804 Purple 0.022"
Table 1: Part Numbers for Atmospheric Rupture Assemblies supplied by Lincoln St. Louis
Coutions
1. To effectively seal the iting without damage to the dsc, the rupture assembly cop must be torqued to no
‘more than 3 ft-lbs (36 in-Ibsl Over tightening ofthis cop con cut into the aluminum dsc and reduce the
fitting’s rupture pressure rating for that disc thickness,
2, The some aluminum disc thickness can be used with both 1/8" ond %" hole caps. However, the rupture
assembly's pressure rating will be significantly different due to the change in disc's exposed surfoce oreo.
@ Example: A yellow (0,010" thick disc wll rupture at 1450 psiin the " hole cop. but 3700 psiin the 1/8 hole
cap.
Individual arrangements can vary depending on the conditions of service, and Specific compressor
‘orrangement, Contact GE Oil & Gas customer service with any specific questions regarding your compressors.
If you hove ony questions concerning this procedure, please contact GE's Technical Hotine
24 Hour Assistance Phone Numbers:
832-978-6233,
832-978-9780
30F3
Compressor News!CN 05-003GE 1333 West Loop North, Suite 200
OIL&GAS Houston, Texas 77027 USA
compressor (|\\
Subject: Oil Filter Upgrades Group: Frame
Number: 05-006, Rev 2 Sub Group: Lubrication
ES, F, F!
GE Oil & Gas has upgraded its ol fitration fiter element standard offering and associated options as a
product improvement for al of the following frames. The fiter head now comes equipped with two plugged
0.25" NPT taps (side mount) for‘fiter differential pressure monitoring
‘+ All Frames — FESO Series, FE65 Serios
+ AILD, DS, E, ES, F, FS Series
il fitration is vital for successful operation of a compressor and deserves special attention
The standard canister type fiter housing is a
4 Non-bypassing design that uses a
replaceable, full flow cartridge type filler
element. The fiter canister assembly bolts to
the ol distribution manifold. internally the
fiter element has top and bottom o-ring type
‘seals. The top seal fits over a steel tube,
while the bottom seal has a formed metat
cap that’s held in place with a col spring.
{the fiter housing’s formed metal end plate (PN 124827) or spring
(PN 124826) are wom or damaged, always replace with OEM
Components. Failure to do so could allow unfitered oil to bypass the
{iter elements, which could damage the compressor,
‘This Compressor News describes the new standard 10 micron filers elements used on the 9” & 18" fiter
housing assembles. it also details the new 18" fer conversion option for these frarnes. The 18° fiter
‘element can be provided as an option with new equipment, or as a retrofit to the standard 9° housing with
‘minimal component changes. An 18” canister can replace @ standard 8" canister, utilizing the samme o-ring,
internat cap & spring. Always check for adequate package clearance required for maintenance purposes,
See attached sketch.
Note: if water or condensate is allowed to collect in the bottom of this canister, erosion or corrosion of the
spring and plate can occur
‘The optional 18° fiter element is a one-piece element design, with twice the surface area as a standard 9°
element. The increased fiter surface area can be beneficial infield applications where extended change
intervals, or decreased cold weather startup differential pressure is desirable.
The fiter head assembly now has two fiter differential pressure indicators, the existing pointer plus two
ew 14" NPT tapped ports for gauges. The pointer utlizes a spring loaded piston to measure differential
pressures, and requires the following differential pressures to move the pointer (visual indicator] to the colored
regions as follows:
‘+ 420 Psi differentiol is required to move the pointer to the green / yellow line.
‘+25 Psi differentials required to move the pointer to the yellow / redline
+ 430 Psi differentials required to move the pointer to the full red limit.
FOF 2 compressor NewsiGN 05.006GE 1535 West Loop North, Suite 800
Houston Texos 77027 USA
OIL & GAS
compressor (>
Note: The actual ol fiter element has a collapse pressure rating of 150 psid
‘The 9" fiter element willbe interchangeable with the 9° legacy oil filer elements, All new 9" & 18° fiter
elements have @ nominal fitration rating of 25 microns, and are made of pleated synthetic media, We also
Offer the option of @ 10 Micron fiter for applications where increased fitration capabiliy is desired.
‘Std 9" fiter
housing assembly
(Optional 18° Fiter Assembly,
Note: Anew DS, ES or FS frame will ship with a 9" fiter installed,
The 18° canister and fiter element must ship foose, since it
extends approximately 8 to 9" below the compressor frame's mounting feet.
Filter Options - Table 4
“Old 9” Oil Filter__[ New 9" Oli Filter__| New” Oil Filter |
Status ‘Obsolete Optional ‘New Standard,
Media Type. Cellulose ‘Synthetic ‘Synthetic
Nominal Rating (microns) 25 25 10
[Old Part Number | “New Part Number | New Part Number
Filter Element TEPS-2203 25Z-PS-2203, 102-PS-2203
Filter Assembly
With Element 9.PS.2203 9Z-PS-2203, 422-PS-2203
Filler Canister 34-PS-2203 34:PS-2203 34-PS-2203,
New 18" Oil Filter_| New 18 Oil Filter _|
Status Optional Optional
Media Type ‘Synthetic Synthetic
Nominal Rating (microns) 25 10
7 New Part Number | New Part Number
Emer canaiet 35-PS-2203 35PS2203
7Z-PS-2203 162-PS-2208
ilter Assembly
| With Element 182-PS-2203 192-PS.2203
jeplacoment Plate 124827 2A827
Replacement Spring 120828 120828
Replacement o-ring kit (1) H-PS-2208 41-PS.2208
(1) Canister & differential pressure pointer o-rings included
20F2
(Compressor NowstCN 05.008GE OIL & GAS Ge018 Ges, te
+1839 West Loop North, Sute 800
Houston, Texas 77027 USA
compressor (ews
———
Subject: Rotating Inertial Data Group: Frame
Number: 05-007 ‘Sub Group: All
Date: 16 June, 2005 Series: DS (D), ES (E), FS (F)
Many GE Oil & Gas’ high speed reciprocating compressors are driven by Waukesha engines. When the engine is
equipped with an ESM controller. the compressor inertia data is requited. This compressor news provides
rotating moment of inertia dota far its 0S 0}, €S (6) ond FS (F) compressor models
|n 2004 Woukesha Engine introduced its Engenius ESM Engine System Manager controller that is being used on
variety of large horsepower engines driving GE reciprocating compressors. This ESM conteoller requires the
moment of ine‘tio, os on input value, associated withthe driven equipment or “load” itis driving. In the case of
_gos compressors, the criven equipment includes both the recipracoting compressor and its dive coupling.
Listed below in Toble 1 are the GE compressors’ rotating moment of inertio values, At some point Waukesha
‘may include these values, along with other compressor OEM dato, in its ESM manual. The ESM manual expicins
how to calculate and input driven equipment inertial dote inte its controler, Please refer to Woukesha ESM
documentation or contact your coupling supplier forthe couplings moment of inertia value
Ifyou have any questions about your Waukesho engine or its ESM controller, please contact Waukesha or one of
its outhorized distributors.
‘Waukesha Engine
1000 W. St Poul Avenue
Waukesha, wi 53188 USA
Phone: 262-547-3311
Emoit www waukeshaengine dresser.com
bead ‘Compressor NéwsiCN 05.007002851
@ GEOIL&GAS £018 Gas, ne
1393 West Loop North, Suite 600
Houston, Texas 77027 USA.
compressor [ows
Compressor Rotating Moment of inertia.
Manufacturer Model Ret Tbfin-sec! igh
3502 & 0502 1500 a7 2
(05504 & 0504 1500 34 %
5 5 7
[03602 & D502 1200, 16 2
3604 6 D608 1200 42 5
3502 6 E502 1500 65 75
F502 6 F502
#5504 & £508 1500 5 iz
F350 6 F504
£5506 & E506 1500 w 35
7 eet ne TE ee)
T5602 & £602 1200 38 86
5602 & F602
€5608 & E604 1200 1 Ts
F3604 & F604
#5606 & €606 1200 705 ie
e 3606 & F606
nie epee ee aS
©5702 6 £702 1000, 35 62
F5702 & F702
E5706 G E708 O00 Ti Ts
|__F5704 86704
£5706 & E706 i000 Tes wz
S706 & F706
i
Table T: Compressors rotating moments of inertia - oppronmote values
Ifyou have any questions concerning this procedure, please contact GE's Technical Hotline
24 Hour Assistance Phone Numbers:
Parts: 832-978-6233,
Technical Service: 832-978-9780
Ee SEES EEE
20F 2 Compressor Newsicn 05.607GE OIL & GAS 199 West tcp No, Suto 850
Houston, Texas 77027 USA
compressor [120 |
Subject: Coupling Adapter Frame
Number: 05-008, rev 3 SubGroup: All
Date: 26 Oct 07 Series: D, DS, E, ES, F, FS
The attached procedure replaces Compressor News 04-004. Two additional diameters
of oversize coupling adapter bolts & associated reamers have been added to the tables
included in this procedure.
This updated bulletin was developed to assist with coupling installation for GE Oil & Gas
model D, DS ,E, ES and F, FS compressor frames. This procedure is also often
applicable to many of the earlier “FE” compressor frames. The attached cross-reference
sheet will assist with identification of your frame.
|Fyou have any questions conceming this procedure, please contact GE's Technical
Hotline
DS Series Frames] [ES Series Frames | {_ FS Series Frames
Curent] Legacy | [Curent] Legacy | [Current] Legacy
08422 |FE 4500-2] | E5502 |FE s85C-2| | FSs02 FE sesDH
saa |Fe 4500-4] | ess04 |Fe s8c-a| | Fssce | FE 56s0H-4
oss02 |Fe 5500-2| | ess0s re sesc-6| | Fssos | FE s6s0H.6
ss0é [Fe 5500.4) | es60 |FE 6asc-2) | Fseoe | Fe essDH.2
602 |FE 6500-2] | es6o4 re 6asc-4| | Fs6oe | FE 68sDH.4
8608 |FE 6500-4] | Ese0s |re essc-e| | Fs60s | Fe 6650H.6
E8702 |FE 7esc-2| | Fs702 | re 7650.2
es704 |e 765¢-4| | F704 | FE 7e5DH-4
estos |Fe 7esc-s) | Fsvos [Fe 7esDH6
24 Hour Technical Assistance: 832-978-9780 (Phone)
24 Hour OEM Replacement parts: 1-866-565-2303 (Phone) 1-513-774-4018 (Fax)
Parts Webpage: wwiw.parisdirect gexpro.com
Email address for replacement parts inquiries: oilgasstreambox gexpro.com
GE Ol & Gas
GE High Speed Reciprocating Compressors ~ Headquarters
‘Saies, Parts, Service Customer Service
1333 Wost Loop North, Suite 600
Houston, TX 77027
Tol, +1-713-803-0900 (Switchboard)
Fax +1-713-803-0499
www. geollandgas com
10f6
Compressor Newsich 05:08, ev 3GE OIL & GAS £018 Ges, ne.
1333 West Loop North, Suite 800
Houston, Texas 77027 USA
GE High Speed Compressor Crankshaft Flange Adapter
Procedure for Installation of Coupling Flange Adapter & Bolts
DS, ES & FS Compressor Frames
This coupling adapter bolt installation procedure is applicable to GE compressor current frame
models DS, ES and FS. Itis to be used for the initial coupling bolt installation or whenever an
oversized bolt replaces a standard bott.
‘Some crankshafts (DS, ES & FS models and their earlier models D, E, F, FESO and FE6S
Series) come standard with a machined coupling flange, see Figure 1.” This flange is an integral
Part of the compressor crankshaft and will accommodate various coupling designs. A drive
‘coupling adapter is an optional component, available from GE. The coupling adapter may be
installed on the crankshaft at the factory, to match a specific coupling chosen by the Packager.
Additionally, there are times when the adapter must be installed by the Packager or in the field.
Every time the bolts are replaced, a new oversized hole, and new oversize bolts should be
used. The existing flange and adapter bolt holes are enlarged by use of a special stepped
feamer. Specific bolts-are matched with the corresponding hole diameter (refer to table on the
‘next page). Proper ft between the bolt and hole is critical, The coupling adapter is then
installed, with the Packager or Customer furnishing the specified coupling assembly (shim,
spider, hub or engine/motor adapter). Please contact GE if you have questions concerning the
use or installation of a coupling adapter.
Note: Please notice the difference in bolt diameters between the initial
(standard) and field replacement (oversize) bolt hole reaming sizes,
Caution: ‘Sharp steel metallic burrs may be present, Use proper personal protective
equipment and tooling to prevent injury.
Warning: Failure to propery install and torque coupling adapter bolts can
result in serious equipment damage.
Required Materials & Tools
For the installation of a standard coupling adapter to a GE compressor crankshaft flange,
the following specialty items will be needed:
- Magnetic base drill press, 3/4” or larger chuck preferred.
~ Three 3/4" (0.75") diameter studs, 9” long with nuts and washers
= Hammer, 16 Ib. minimum,
~ _ Drift punch (1” to.1.5" in diameter x 6” long), steel
~ Torque wrench & Adapter to fit a 11/16" nut,
~ Pilot drill & stepped reamer to match the body ofthe fitted bolt being used, standard or
oversize, see the following table.
20f6
Compress Hew 05-008 3e GE OIL & GAS GE 01802 re,
1383 West Loop Nort, Suto 860
Houston, Texas 77027 USA
GE High Speed Compressor Crankshaft Flange Adapter
Procedure for Installation of Coupling Flange Adapter & Bolts
DS, ES & FS Compressor Frames
[ ‘DE DS Frames
Bok Pan # T
Govping | Adapter | Slandsrd Sze [T"Oversze | 2" Ovenae [I Overae | Nut | Hardened | Bot
Sae(ypical |Pat# —[oses'tn |ossete | taste | tosr% | Pane | Warner | ayy
Designation cose xs4e | tooox | roax | tose Pan
tong 3.48°1onq__| 3.48°Iong_| 348" long
07606 | aRBTA
70/700 | 15A622
751750 —[ 473-0407] 114209 423.9053 | 427-6309 | 427.6000 | 110009 | s-100063 | 6
120/800 | 180591
85 /650_—_| 158023
62/905 [160379
ETF EESTFS Frames
Bon Part ae
Couping | Adapter Siang ze | 2" Ovemae |FGvente | Nt | Hardened | Bot
Seetugca) | Pate” [SORT [i"Ovenze 72° Overie [IOwemae | Nt , | Hadoned | pot
Designation osesto | toorx | rox | s08ax Pane
0.966" ae" | 448" tong | 448" long | 448" ong
Jeng
e wor e00 | Waar
701700 15A822
eres] HATE! rsao0s | azreat0 | azr-esi1 | s1aove | e-to00es | 12
307600] 1SAG01
35,7850] 16AS79
321925 16AR7O
Body FRBON size Pict Bri Sze ‘Stepped Reamer Description
‘Standard ‘Siaight uted, stepped reamer with a major
Size e168" diameter of 0.966"
0.965" (0.3537) ‘The stepped ream should have a 0.952" 0.953" pilot
to iameter x long,
| _ 0.966 Reamer part# 357-9514
TF Oversize Sifaigh uted, stepped reamer wih a major
o.9e" eae" diameter of 1.000".
‘ (0.984) ‘The stepped ream should have a 0.983" /
1.000" 10.964" pilot diameter x 1" ong
Reamer part# 427-5654
2nd Overs Siraight futed, stepped reamer witha major
1031" +1164" lameter of 1.032"
to (016) ‘The stepped ream should have a 1.015"
1.032" 1.016" pilot diameter x 1" long,
Reamor part# 1-104498,
31d Oversize ‘Straight futed, stepped reamer with @ major
1.062" 11132" diameter of 1.063".
to (1937) ‘The stepped ream should have a 1.091" /
1.063" 1.032" plot diameter x 1" long
e Reamer part# 1-104499
30f6
Compressor News\eW05-008 1 3e GE OIL & GAS E018 as, ne
1939 West Loop North, Suite 800
Houston, Texas 77027 USA,
GE High Speed Compressor Crankshaft Flange Adapter
Procedure for Installation of Coupling Flange Adapter & Bolts
DS, ES & FS Compressor Frames
Installation Procedure
1, Remove any preservatives from the crankshaft flange and adapter with a solvent /
de-greaser.
2. Clean and deburr the mating surfaces, pilot diameter & faces, of the crankshaft
flange and coupling adapter.
3. Mount the coupling adapter to the crankshaft flange.
4. Confirm that the adapter piate's male pilot fits properly into the crankshaft hubs
female counter bore. Verify that the two mating faces are fully in contact with each
other.
5. Rotate the coupling adapter relative to the crankshaft ange, to optimize unreamed
bolt hole alignment, see note below. Punch mark the two flanges’ OD to indicate
flange bolt holes alignment for proper reassembly.
Note: Align the mating holes on the adapter with the holes in the crankshaft. if one
hole(s) of either the crankshaft lange or coupling adapter is larger or smaller
then the other, center the smaller hole to the larger hole as closely as possible.
6. Remove adapter to confirm NO burrs have been ‘pulled’ between the adapter and
e crankshaft mating surfaces.
7. Reinstall the adapter plate following above steps 2 thru 5.
8, Install the three (3) %" studs, evenly spaced, to hold the adapter securely on the
crankshaft during subsequent steps.
9. Tighten the three studs evenly to hold the adapter securely in place on the
‘crankshaft,
10. Use the magnetic dril to pilot drill one of the holes to the diameter
required for that bolt size, see table above.
Note: Be sure to use a drill that has been properly sharpened so the resulting hole will
Not be oversized.
11. Clean the drilled hole of all of the cuttings and lubricate with cutting of
12. Use the magnetic drill to match ream one hole set, adapter to flange,
using the stepped reamer for the bolt size selected for installation.
18. Clean the reamed hole of all ofthe cuttings and lubricate with ol
14, Drive the coupling bolt through the match reamed hole until it seats
solidly against the coupling adapter.
Note: The head of the GE supplied bolt has coarse knurled splines (anti-rotation) that
must be driven into the coupling adapter’s counter bore. A properly installed bolt
will have its head recessed approximately 0.200" below the surface of the
coupling adapter, see Figure 2.
Caution: Make sure the bolt has bottomed in the coupling adapter’s counter bore.
@ Replacement mounting hardware must include a new nut and new hardened washer.
40f6
Compressor News\ON 05-008, re 3GE OIL & GAS Ge O18 Gas, te
1399 West Loop North, Suite 600,
Houston, Texes 77027 U.S.A
GE High Speed Compressor Crankshaft Flange Adapter
Procedure for Installation of Coupling Flange Adapter & Bolts
DS, ES & FS Compressor Frames
Warning: Failure to properly install and torque coupling adapter bolts may result in
inadequate bolt preload and subsequent equipment damage.
15. Lubricate the bolt threads and mating nut face with oil (SAE 30WT or
40WT)
16. Install a hardened washer and lubricated nut, then tighten the nut to
80 ft. bs,
17, Repeat steps 10 through 16 on the hole approximately 180° opposite
from the first hole
18. Remove the 3/4°studs that were used to temporarily hold the coupling
adapter in place
19. Repeat steps 10 through 16 for the remaining bolt holes.
20. Final torque for all bolts is 200 to 220 f. Ibs. Apply final torque in three incremental
steps (i. 80, 150 and 200 f-Ibs). When torquing boits, avays use the following cross
patter’s alternating tightening sequence.
Bolt Tightening Sequence — 12 Bolt Pattern
Bolt Seating Verification
1. Using the hammer and drift punch, sharply strike each bolt head one time.
2. Re-torque each bolts nut to determine ifthe bolts have reseated in the coupling adapter.
Caution: Any bolt that has a reduced torque value has not properly seated in
the adapter. Drive that bott until it firmly seats and re-torque the nut
to 200 to 220 ft. Ibs.
5 of6
Comoressor Newel 05-068, 0603GE OIL & GAS
GE O18 Gas, Ine.
1893 West Loog North, Suite 860,
Houston, Texas 77027 USA,
GE High Speed Compressor Crankshaft Flange Adapter
Procedure for Installation of C
oupling Flange Adapter & Bolts
DS, ES & FS Compressor Frames
Z
COUPLING ADAPTER NG
Boor FIT DIAMETER —
CRANKSHAFT.
W/COARSE KHURLEE HEAD
FIGURE 1: COUPLING AD/
; ZZ
Z|
HARDENED WASHER
IAPTER.& HARDWARE
o%
porn eS
Baur HEAD
REZESSCO.
Hy ADAPTER
FIGURE 2: COUPLING ADAPTER HAF
COUPLING ADAPTER - CRANKSHAFT BOLTING
\RORARE PROPERLY INSTALLED
6
of 6
‘Compressor NewsleW 05-0081 3GE OIL & GAS Gé 018 Gas, re
1333 West Loop North, Sute 800
Houston, Texas 77027 USA,
compressor {jews
Subject: — DNFT Magnetic Assemblies Group: All Frames
Number: 05-009 Sub Group: Lubrication
Date: 17 June, 2005 Series: All
This compressor news is written to assist Packagers ond customers instoll the correct digital no-low timer
{DNFT-LED) switch and associated magnet assembly on the compressor’s cylinder lubrication distribution block
system. Failure to install the correct magnet assembly will result in a blown rupture disc after the divider block
Piston locks up and stops oil flow, triggering « no-flow shutdown. Refer to Compressor News #05-003 for rupture
disc detail
The DNFT-LED iso micro-processor bosed switch thats used to sense a no-flow or slow-flow condition on
lubricating oil going to cinder or piston rod packing. see Figure #1. The DNFT-LEO manufacturer itercture
‘refers to several electrical opprovol ratings, including CSA, NEC, Class | Division |, Groups. A B.C D. The some
ONFT-LED switch may be used for ll ofthese classifications. To apply the DNFT switch propery, the magnet
ssembly must be matched to the proper divider block manufacturers include Lincoln, DROPSA, Trabon, etc),
See Figure #2
‘The ONFT-LEO switches con be used as both an olarm and o shutdown, depending upon how the switches ore
utllzed. Eoch ONFT-LED switch must be wired separately. The ONFT-LEO contains an amber colored light-
emitting diode (LED| as a cycie indicator, to provide o visual indication thot the system is functioning, This LED is
‘ypically used to manually monitor the cycle time Iseconds/strake} of the distribution black system, The Gemin|
Supplied DNFT-LED is typically shipped loose in the toolbox, for packager installation and adjustment.
‘Adjustment instructions are included in the DNFT-LED box,
The DNFT-LED works in conjunction with c magnetic pin, which cycles in time with the divider block piston
‘movement - flashing the'LED to indicate o completed divider block cycle. The DNFT-LEDis intemally powered,
‘operated with o field replaceobielthium battery. f battery voltage drops below its minimum power level, the
DNET-LEO goes into o shutdown mode. The compressor cannot be restarted with o non-functioning DNFT-LED
tnt the battery power is restored.
‘When @ DNFT-LED is instolled on a GE high speed reciprocating compressor. there are several magnetic
‘ossembiies avilable depending upon the manufacturer of distribution block used Listed in Table 1 ore the
distribution block manufacturers, GE Compressor Models and associated OFNT-LED port numbers for the correct
switch assembly forthe instalation, The name of the distribution block manufacturéris usually stamped on the
face of each divider block
the manufacturer of ONFTS. Whitlock instrument has detailed DFT information ond troubleshooting guides
ovoilable on-line. This information con be found on Whitlock instrument's website (waw.nofla.coml. adgitional
informtion and troubleshooting of divider block lubrication systems ond DNFTS is also available from C.C
Technology, Inc, at their web site (awwcct nul
Please call GE Oil & Gos with any questions you may have,
10F2
Compressor NewsiCN 05.009@ GEOL&GAS cone
1338 West Loop North, Suite 600
Houston, Texas 77027 USA,
compressor ()aws
Distribution Block ‘Compressor ONFT-LED part #, [Magnetic Housing
Monufacturer Model includes magnet | Assembly Description
assembly
Lineoin St Louis ADSIOL ESE FSIA 427-4837 Tincoin o-ting seal,
extended nose, 7/16" ~ 20
TP threads 2
DROPSA B,H&M, W27-4820, Dropsa 4" 6SP threads
Table 1: Typical ONFT-LED part numbers by compressor model
Notes:
(2) DNFT part number includes the correct mognet housing assembly requited for that monufacturer.
(2 7/16" - 20 TP threads are also used on magnetic assemblies whose nose design only fits Trabon blacks
PORN tree
09.66% te
28 OE nnn
o.oo
Figure #1: Digital No-Flow Timer (ONFT-LED) Switch
‘Assembly, including magnetic housing assembly
Urea 0g Sat
‘ended Neat
ce
me-20
Figure #2: Magnetic Housing Assemblies
Caution: ONFT must be nstolled with the correct,
magnetic assembly for each divider block
‘manufacturer.@ Ge
OIL & GAS
002851
41333 West Loop North, Suite 800
Houston, Texas 77027 U.S.A.
compressor (12\/S |
Subject: Upgraded Frame
Number: 05-013 Rev 2
Date: __29 Feb 07
GE Oil and Gos has upgraded the running gear of the “F*
crosshead, crosshead pin, ond connecting rod. Frames
in earty 2008. and ore identified with the designation “FS”
Group: Frames
‘Sub Group: All
Series: LFS
frame. These upgrades include changes to the
Containing these upgraded camponents began shipping
frame, All new frames being shipped from GE Oil &
‘Gas contoin these upgraded components, These upgrades are ¢ further expansion of the upgrades ovalloble for
the Chicago Pneumatic ond Energy Industries “FES65DH, FEGESDH, and FE76S0H" frames,
Building on technology from its proven Nuovo Pignone APIE1S process compressors, GE Oil & Gas has uparaded
the running geor to provide greater robustness. The u
ES ond FS Teodition Series of high-speed compressors,
ipgraded frames ore now identified as the GE Oil & Gas, DS,
« Upgrade Summary-F to FS Connected Rod and Crosshead
Connecting Rod:
(1) Cap Alignment pin has been added, also,
the pin is offset to ensure proper cap
installation
(2) Bolts are 12.point capscrew type with
hardened washers.
(3) Clamping force of the connecting rod cap
‘has been increased with the upgraded
‘components and an upgraded attachment
procedure.
(4) Tri-Metal bearings, babbit coated bronze
bearings with steel backs are now standard,
Crosshead:
{5) Single piece forged stee! crankshaft with
Integral counterweights.
(6) Adjustable aluminum shoes have been
replaced with babbitied integral shoes.
(7) FS crosshead is now a single piece
ductile iron casting
(8) FS crosshead pin is increased from
3.875" inches to 5.25" in diameter, increasing
pin surface area over 183%.
(8) The “F" piston rod locking pin device has
been discontinued,
The fame upd oo eters eroded ing of he ses fone om bt cenpeessen od
@ vote esther ure creosote combente sesame tom
TOF 2 compressor tensiCn 05:13GE 1533 West Loop North, Suite 800
Houston, Texas 77027 US.A,
OIL & GAS
r fews
SWS)
‘Summary of FS Frome Ratings
ane Sar Sa] FSI FSTE | PERG] FRESE] FST] FSR FSG FTO
fer troy Bee (fees | sea ote | erate] erate deeaee | need ae
Seow “incre st eaten feo ee we etl feet fer ts.
ra nx ie | v0 | sco | soo | azo | sco | 500 | eo | sow
fun ene moo | 20 | ben | deo | dio | to | ram | taco | Joo
sx od Loses coos
Sonprsion e |e] ef ola] ew] ol om | «
Season s/s |)e]/o)5)8)/e)ele
ad Dla -mches ze | 5 | os | 2s | os | os | as | Sef 2
Grants Sata Sains a | és | as | as | as | as. | as | a8 | es
ren eng Whee as | 3a | as | os | oe | ce | sa | fs |
a-tnenes, es | ss | os | es | os | ce | os | te | at
inches a | se | is | oe | se | ce | se | S|
[econesing Rod testy: enes se | sz | sm | se | ie | ie | ts | o& | 2
[canning os ering Leng wehes a] EY SE |) Se | a | ss | se 1 82
[goonied Gace ches aiweteisetaltatlelsts
Items of importance:
Proper throw balancing of the compressor frames critical to sofe and smooth operation. The FS
sunning geor has o different weight tbefore balance adjustment) thon the “F* running gear. To prevent.
vibration, this weight must be accounted for when boloncing the frame, The nominal crosshead weight
of the FS frome is 128.01 lbs. This represents an increase of 12.11 Ibs over the F crosshead weight of
11539 Ibs. F and FS frame bolance weights oré interchangeable.
‘+ Proper running geor cleorances are critical to safe ond smooth compressor operations. Due to the
change in running geor dimensions and materials, the recommended FS frame clearance specifications
‘ore not the some as those applicable to the F frame, consult the FS operations manucl
‘+ Proper connecting rod cap bolt torque is crticol to safe compressor operation, The four connecting rod
‘cap bolts hove « recommended torque of 165 ftlbs plus an adcitional 99 degree rotation,
‘+ New special tools - A connecting rod cop removal tool port number 427-6200 and connecting fod cap
tightening 90 degree gouge 427-6292,
Details and instructions on the proper procedures and settings forthe above points can be found in the FS frome
‘operations and maintenance manual, or contact the Technical Assistance hotine - 832-978-9760.
‘Attached is o parts listing for the FS connecting rod and crosshead, these items con be purchased ina kt form
‘95 port number: Kit907. This kitincludes the ports necessary for one throw of running gear upgrades, including
the crankoin bearinas.
(FS Throw Ri Pon wimier ROOT Weems 1.70
hem [Description Be
ROD ASSY.CONW ESS BUSHWIO feme2S_ 0.103307
_TIeAPScREW i207, 125-128 DES CONN — 20m
2 diosa a
ares 9
NA
1103305
Se Seer
| CROSSHEAD GROUe FS Fram
—]eaP cROSSHEAD 1103300
© ssso1
a ‘360-100062
WASHER FLAT. HARDENED. 625 STL ~ "7-105
[CROSSHEAD, sa
[an Se FE sarc HI]
15 ne Sa ae Sarre Tae —— 1S
aoe CComprossor NewelCN 05-013,GE 1333 West Loop North, Suite 800
Olé Gas Houston, Texas 77027 U.S.A.
NAW
compressor (ac
Subject: Crankshaft Counterweights Group: Frame
Number: 06-002 Sub Group: Maintenance
Date: __11Jan 06 Series: EF
1 2004, GE Oil and Gos began providing “single piece" crankshafts for the “E" and "F frame os described in
Compressor News CN-03-005-1. Since then, crankshaft with integrat counterweights are the stondard for the
‘new ES and FS series of compressor fromes. These improvernents are further expansion ofthe “E* upgrades
valloble for the Chicago Pneumatic and Energy industries "FES65, FE66S, and FE765" frames described in
Compressor News CN-02.006, Crankshafts with either the “bolted on” or the “integral” counterweight designs
tre fully interchangeable
ESSeriesFrames___| [FS Series Frames
Current, Legacy Current ‘Legacy
£5502 | E502 or FES6SC-2 | [S502 | F502 orFE SESDH-2
fs504 | Es04orreS6sC-4 | | Fs504 | . F504 or FE S6SOH-4
e506 | E506 orFES6sC-6 | | Fs506 | F506 0rFE SE50H-6
es602 | e60z0rFEe6sC-2 | | Fs602 | F602 or FE 6ESOH-2
3604 | £604 oF FE 665C-4 F604 | ~ F604 or FE 685DH-4
£606 | E606or FE G6SC-6 | | FS606 | F606 0° FE 6ESDH-6
€s702 | e70zorFE76sC-2 | | Fs702 | Fr020rFE7650H-2
Es70% | E704orFE765C-4 | | FS704 | F704 or FE TESDH-4
es7os | e706 orFe765¢-6 | |_£5706 | F706 or FE 7650H-6
GE Oil 6 Gos does not recommend removal of the counterweights, On the rare occasion when counterweights
‘must be removed for service needs, proper re-installation of the counterweights is erical. Improper installation
of the counterweight hardware con result in severe compressor damage. Hf you have any concern or questions
‘regarding the counterweight installation on your E, or F series compressor. contact the GE Oil ond Gos high speed
reciprocating compressor technical support hotline immediately, 832-978-9780,
Whenever the counterweights ore removed, they must be reinstalled using the new counterweights and
hardware shown in Table 1 below. Also, itis critical that the counterweights ore installed in strict adherence to
the attached maintenance procedure. The redesigned counterweights have specially roughened surfaces thot
mote to the crankshaft. Adcitionally, the counterweight bolting hardware uses Superbolt® nuts to control bolt
preload, The counterweight replacement procedure {1-103545, attached) applies to the following list of
‘Compressor crankshafts by model and stroke, One replacement kits required per crankshaft
Typical crankshaft
with "Bolt On"
counterweights
TOF 2 compressor NewsiCh 06-002e GE 1333 West Loop North, Suite 800
oH iy
compressor (05
VAY SD
Model ‘Stroke ‘Crankshaft Part # ‘Maintenance Replacement Kit *
Inches Portit Throws
Table I: Field Cronkshaft Counterwaight Replacement Kits
Ifyou hove any questions concerning this procedure, please contact GE's Technical Hotline
24 Hour Assistance Phone Numbers:
Parts: 832-978-6233,
e Technical Service: 832-978-9780
20F2
‘Compressor Newstn 06-002GE 4333 West Loop North, Suite 800
Houston, Texas 77027 USA.
OIL & GAS
Maw WIR
compressor (ics
Subject: ONFT LED, Model 506 Group: All Frames.
Number: 06-003 Sub Group: Cylinder Lubrication
Date: 11Jan06 Series: All
This compressor news is written to inform Packagers and Customers on proper installation and wiring
of the digital no-flow timer (DNFT] LED, model 506 switch. Failure to install and wire the DNFT correctly
will resuit in on inadequately protected compressor lubrication system,
‘The DNFT-LED is a micro-processor based switch thatis used to sense 0 “no-flow’ or “slow-flow’
condition in lubrication oil going to cylinder or piston rod packing, see Figure #1. The ONFT-LED
manufacturer literature refers to several electrical approval ratings, including CSA, NEC, Class I
Ovvision |, Groups, 8, C, D. The some ONFT-LEO switch may be used for all of these classifications. To
‘opply the DNFT swatch properly the magnet assembly must be matched to the proper divider block
{manufacturers include Lincoln, OROPSA, Trabon, etc). see CN# 05-009
The DNFT-LED switches can be used os both on alarm and a shutdown, depending upon how the
switches ore utilized. Each DNFT-LED switch must be wired separately, see Figure #1 for typical
"Normally Open’ or "Normally Closed’ configurations.
NOTICE: WHEN MORE THAN ONE DNFT IS INSTALLED ON THE COMPRESSOR, EACH DNFT MUST BE
WIRED TO A SEPARATE ALARMCIRCUIT ON THE CONTROL PANEL, ANNUNCIATOR OR PLC. THIS
WILL SIMPLIFY TROUBLESHOOTING THE LUBRICATION SYSTEM AND DNFT.
The DNFT-LED contains an amber colored light-emitting diode (LED! as a cycle indicator, to provide a
visual indicotion that the system is functioning, This LED is typically used to manually monitor the cycle
time (seconds/stroke) of the distribution block system. The GE supplied DNFT-LED is typically shipped
loose in the toolbox, for packager installation ond agjustment, Adjustment instructions are included in
the DNFT-LED box
‘The DNFT-LEO works in conjunction with a magnetic pin Figure #4, which cycles in time with the
divider block piston movement - flashing the LED to indicate o completed divider block cycle. The
DNFT-LED is internally powered, operated with o field replaceable lithium battery. IF bottery voltage
drops below its minimum power level, the DNFT-LED goes into a shutdown mode. The compressor
cannot be restarted with a nonfunctioning ONET-LED until the battery power is restored
A the manufacturer of ONFTs, Whitlock Instrument has detoiled DNFT instollation, mointenance
information and troubleshooting guides available on-line, This information can be found on Whitlock
{nstrument’s website iwunw.nofla,com). Additional information and troubleshooting of divider block
lubrication systems and DNFTSis also available from C.C. Technology, Inc. at their web site
(onwor ect
OF 2 compressor NewsiCN 06-003GE {933 west Lop Hort, Sula 00
fo Houston, Tenas 77027 USA,
compressor (ows
sae og wen woe a
=
cevneec ovens rountencomecron
Fe hae reine nee
cs
DNFT-LED
000506 Sienna
WIRING LEGEND
OPEN LOOP MODE | CLOSED LOOP MODE
neo 4
Vo 7 Seer \ Dees) sgaer
DBR tera
o00508 my ForuntwosSuaton a00s06 my FSnuieeseuon
Figure #1: Digital No-Flow Timer (ONFT-LEO} Switch Assembly, with NO and NC switch wiring
diagrams
ELETRICAL TESTING OF DNFT ALARM CIRCUIT
NORMALLY OPEN - Attach ohmmeter to red wires. Meter should read 10 mega-ohms in operation
‘ond less than 10 ohms in alarm stote.
2, NORMALLY CLOSED - Attach ohmmeter to orange wires. Meter should read less than 10 ohms in
operation and infinity in alarm state,
Piease call GE Oil & Gas with any questions you may have.
GE Oil & Gas
High Speed Reciprocating Compressors
24 Hour Assistance:
Parts: 832-978-6233,
Technical Service: 832-978-9780
2OF 2 Compressor NewsiCN 05.003@ Ge 1333 West Loop North, Suite 800
Houston, Texas 77027 USA.
OIL & GAS ee
compressor {ews
Subject: Volume Pockets Group: ‘All Cylinders
Number: 06-004 SubGroup: All
Date: _11 Jan 06 Series: All
‘The attached procedure outlines the adjustment of manual variable volume clearance pockets
{WvcPs|, and replaces CN 04-010. This VWCP adjustment procedure is applicable to all GE compressor
‘gylinders using head end [HEI VCPs. Failure to properly adjust and maintain WCPs, can result in
damage to the compressor.
Capacity Control
The WCPis an optional capacity control device used to adjust the head end clearance of the cylinder.
Most compressor cylinders can be equipped with WWCPs, by replacing the fixed clearance HE cylinder
head,
Reciprocating compressors are positive displacement devices, compressing a specific volume of gas
with each piston stroke, The operating conditions can vary across a range of pressures, temperatures,
flows and gos mixes, depending upon the actual field applicotion. The use of a VCP is one method of
e ‘copacity control that can be used to efficiently adjust the compressor throughput and power.
The WGP is designed to add o variable amount of volumetric clearance to a compressor cylinder. As
the piston approaches the cylinder HE, gas tronped in the WWCP clearance volume and does not exit
the cylinder. As the piston travels back toward the crank-end of the cylinder, this trapped HE gos re-
expands into the cylinder bore.
Please contact GE if you have questions concerning the installation or use of @ VWCP as a capacity
control device.
vvcp
Assembly
VCP Piston
‘Stem and Jam Nut
ver
e nis
Figure #1 - Typical Variable Volume Clearance Pocket (Installed)
10F4
‘Compressor NewsiCN 06.004GE 1333 West Loop North, Suite 800
OIL &GAS Houston, Texas 77027 U.S.A.
compressor [120s
Authorized GE high speed reciprocating packagers are provided with performance prediction software
which allows them to chéck the entire performance operational envelope, Contact GE Oil & Gas for
your local authorized packager location con contact,
Caution: The use of a WCP to change load conditions should always be reviewed to verify acceptable
compressor performance before adjustment. Using a VWCP for capacity conta will have an impact on
compressor performance characteristics os well os horsepower and flow. Performance parameters to
check, includes volumetric efficiency, gas temperatures, driver power limitations, crosshead pin
reversals, interstage pressures, system torsional response, compressor valve dynamics ond procéss
‘gos acoustical affect. The added cylinder clearance may significantly change process gas pressures
‘and require valve modifications (usually spring changes} to achieve optimum valve ife for long-term
‘operation
‘Warning: Improper adjustment to or servicing of WWCPs, in hazordous or toxic gas service, can present
asofety hazard.
WCP Adjustment Range
‘The WCP is used to adjust o cyinder’s HE clearance. The amount of change in clearance volume will
vary depending upon the position of the WP piston, see figure #2, The expected change in
compressor flow and horsepower is a function of compression ratio ond the gos properties.
VCP adjustment can range from the He's fixed clearance (WCP fully closed, 0% travel to maximum
clearonce iVWCP fully open, 100% travel. Clearance is often calculated in cubic inches, WCP position
is commonly communicated to equipment operators in “inches of travel’. A cross reference can be
found by consulting your GE High Speed Reciprocating compressor operations and parts manu!
Jam Nut VVC P Piston
over Sea Sealing Ring
Washer 8 a
Z
Y
LT
‘Manual Drain Plug
Figure # 2
Effectivé Rod Extension: Amount pocket is open, in inches = B- A
Consult your latest GE High Speed Reciprocating Compressor
Parts Manual for specific cylinder clearance data,
24 Hour Assistance Hotline:
Parts: 832-978-6233
Technical Service: 832.978.9780
20F4
‘Compressor NewsicN 06-004GE 1333 West Loop North, Suite 800
Houston, Texas 77027 U.S.A.
OIL & GAS
compressor )\2\/5
Variable Volume Clearance Pocket (VVCP) Adjustment Procedure
The adjustment of manual variable volume clearance pockets ICP} is applicable to all GE high speed
‘reciprocating compressor cylinders using head end (HE) WCPs. The VUCP clearance volume may be
agjusted with the compressor running or stopped. ifthe compressor cylinder is pressurized, VVCP
adjustments can be made ifthe following precautions are oddressed:
Operating Condition Description
‘Compressor shut down with gas pressure
‘Compressor shut down ond de-pressurized
‘Compressor running ot iow idle and de-pressurized
‘Compressor running at low idle with inlet pressure and bypass / recirculation volve
‘open
5. ‘Compressor sunning at reduced speed on line with re-circulation valve closed.
6 ‘Compressor running online ot normal operating conditions
GErecommends all VCP adjustments are made under above operating conditions 1, 2or 3.
However,if VUCP adjustments under above operating conditions 4, 5, or 6 ore required, then the
following minimum precautions are recommended.
CAUTION: Flammable of toxic process gas may leak from the VWCP piston stem whenever the
Jom nut is loosened. The seal washer under the jarm nut is used to seal gas fiow across
the stem threads, Exercise all necessary safety precautions when toxic or potentially
explosive gos/air mixtures are present.
WARNING: Whenever the process gos contains hydrogen sulfide (HS) or other toxic gases under
1 circumstances should you adjust the VCP during compressor operation,
General information
The VWCP's piston ring is purposefully designed not to be completely gas tight. Ths allows for minor
{Gos and liquid migration across piston ring / O-ring, Ths allows for easier VWCP piston adjustment
when the cylinder is pressurized, Gas tropped in the VCP housing will slowly vent across the VCP
piston ring or O-sing during'cylinder de-pressurization. However, accumulated liquids, debris or rust
‘around the WWCP's piston con trap gas in the housing, substantially increasing WCP gas
depressurization time,
WARNING: . Co NOT remove or loosen any gas containment bolting, or the WWCP housing bottom
drain plug, until gas trapped in the housing has fully vented,
WCEP Adjustment - Required Materials & Tools
‘When adjusting a standard HE WCP on a GE compressor cylinder, the following items will be needed
‘9 WCP clearance tables or graphs
Performance program output showing desired WCP setting in inches or %.
Tope measure
Large adjustable wrench to loosen WCP jam nut & to turn WWCP stem
Greose gun, to lubricate WCP piston stem threads
Greose - high quality, heavy duty, high temperature lithium
Anti-seize, for WCP jom nut & washer lubrication
eococe
‘Compressor Newsicn 06-006GE 1333 West Loop North, Suite 800
Houston, Texas 77027 U.S.A.
OIL & GAS
compressor (wows:
Sw
WP Adjustment PrdMedure
1. _ Inspect the cylinder’s HE for any special spacers, between the WCP and the cylinder: in
certain high cleorance applications a special HE compression clearance spacer may have
been added to the cylinder’s "base" cleorance.
2. ‘Determine the desired WCP stem extension dimension “os-is" on the cylinder and "as-
tequired" from WCEP charts or performance runs.
3. To set the VCP at the desired percentage (9) open position, fully close the WWCP, and then.
fully open it, counting the number of turns to the full open position, Fully close the WP.
Multiply the totol number of tums by the desired percentoge open, and open the VCP the
‘resulting number of tus.
4. During WWCP adjustment, exercise all necessary safety precautions.
5. Apply stem thread lubricating grease compatible with the process gas through the WCP
flange lubrication fitting
6 Prior to adjustment, loosen the WCP stem jam nut.
NOTE: Some chattering and / or light knocking of the WCP stem/piston may be
experienced during WWCP stem adjustment with the jar ut loosened.
7. Tominimize gas leakage across the seol washer during stem adjustment, loosen the WCP
‘stem jam nut no more than one hal turn from its tightened position.
& Adjust the VCP in oF out to the desired clearance position determined in step 2, while
‘maintaining the half-turn jom nut position in step 7,
NOTE: Turn the piston stem clockwise (CW! to move the piston in and
reduce clearance. Turn the piston stem counter-clockwise (CCW)
to move the piston out and increase clearance,
9. After adjustment, securely tighten the VCP jam nut against the VWCP thread seal washer,
Using torque values shown in Table 1.
TToble 1: VCP Jam Nut Recommended Torque
Threaded Rod Size Jom Nut Torque, ibs |
T-8UNC 200 ft-lbs
a-i/2" - UNC
2.3/4" - UNC 600 ft-lbs
2°-4acme
CAUTION: Foilure to maintoin proper VWCP jam nut torque can result in vibration of the VWCP
piston in it's housing, ond possibly lead to a fatigue failure ofthe pistor/stem connection. Piston
Jam nut tightness should be checked on a doily basis.
30. Reapply grease to the VCP stem threads through the flange lubrication fitting
11. After final UCP adjustment and Jom Nut tightening, verify there is no gas leakage from
the WCP stem seal washer area, If leaks are detected, replace stem seol washer, or
provide other repairs as required
12, _ Reset high/low process gos shut down points (pressure ond discharge
temperature) to proper set points
FOF 4 compressor NewsiCN 08.004GE 1355 West Loop North, Suite 00
Oil & Gas Houston, Texas 77027 USA.
AIG
compressor jaws
Subject: Oil Pressure Regulating Valve Group: All Frames
Number: 06-009 Sub Group: _Lubrication
: 21 Mar 21 ries: A,B,D, EFS
Proper lubrication is critical to successful compressor frame operation. The type (grade). cleanliness, flow,
pressure, and temperature of the oil are all important factors in proper lubrication. The overall compressor
lubrication system is described in the appropriate GE High Speed Reciprocating Compressor Operations,
and Maintenances Manual,
‘An important component in the frame lubrication system is the oil pressure regulating vaive. This
compressor news is written to provide operators of GE High Speed Reciprocating compressors with the
details on the Fulfo oil pressure regulating valves (PRV), see Figure #1. These valves are standard
equipment on A.B, D, DS, E, ES, F, FS frames and are used as an oil backpressure control device. The
PRV valve is not considered a relief valve, since in normal operation the PRV valve is open, bypassing cl.
The PRV is typically adjusted during normal operating conditions to maintain consistent oil supply pressure
to the #1 main bearing connection. Since the #1 main bearing oll supply connection is furthest from the
‘pump, itis recommended that the Packager install alow oil pressure shutdown switch at this iocation.
‘With this arrangement, operation with inadequate oil pressure and flow to the bearings can be prevented.
Proper operation of the PRV is necessary for correct oil system operation during cold and normal {hot)
operating conditions, therefore proper installation, maintenance, and setting of the pressure regulating
valve is important
vo coencsce ou sire
aaa oct
vase acct
Hants ice re
Hea ee |
Fr-4
{QI
lo
SORE BFE
Figure #1: Typical Compressor Frame Lubrication Schematic
* cooler ncrmaly suposed by GE on A 8, OS, ES, and FS frames
10F3 ‘Compressor NowsioN 05-000eed eaee gee geee ed eaee Seeger gece geese gE SSPEC ATT
@ GE alah ccaeae
Oil & Gas : een
compressor (aws
APPLICATION
‘The Futlo “V" Series valves used on GE Oil & Gas compressors are %4", 3/4” or 1" and operate efficiently
‘with compressor lubricating oll of any viscosity, controling pressures between 30 and 100 psig. The PRV
has a cast iron body with threaded FNPT inlet/outlet connections, a hardened steel piston & an adjustable
spring range of 30%# to 100# (see Figure #2),
Pressure Regulating
Valve Partit NPT Size & Spring Rating Compressor Mode!
‘BW-PS- 1284 3 ENPT, 30# to 1008 ‘ASS2/A354
DS504/604
4W-PS-1284 2314" FNPT, 30# to 1008 ESIFS 504/604/704
ESIFS 06/606/706
G50-1534 T-FNPT, 308 to 100% ALB Frames.
‘SW-PS-1284 TFNPT, 30# to 100# DS502/602
ESiFS 02/602/702
INSTALLATION
Prive cat mtd nan soso, bu arent te aay os par cf conpesa fare
Sum Te Ps seugned orice oaresolvoue pertcibawn an Gotan rend
Sats ol etches Te ake sured connons pees ese Soran
rte posse The vales dushrge e's seed oss ike cnereoes Foe su bets
@© ihrer asian seston Toa hep omnes ceanvoren omens tave
oon
‘SETTING VALVES
GE initially sets the unit's PRV vaive during its factory test run. The PRV utilizes a manual adjusted, spring-
loaded piston to control cil pressure between throughout the unit's operating speed range, Since higher oll
pressures occur during cold startups when the cil is cold and viscous, itis common that the oil supply
pressure must be adjusted during normal (hot) operation. An adjustment to the PRV's spring-loaded piston
regulates cil flow to the frame sump by means of observed oll pressure at the #1 main bearing,
‘The compressor “Startup Checklist” recommends field adjustment, during startup and normal compressor
‘operations, to maintain the unit's cil supply pressure within GE specifications. PRVs are not designed to be
‘a positive shut-off, and will bypass a minimal amount of oil in operation even with the spring is fully
tightened, Turning the adjustment screw clockwise (into the valve body) increases spring tension, which
also increases system pressure. Turning the adjustment screw counter-clockwise (out of the valve body)
{decreases spring tension, which also decreases system pressure. The adjustment screw has a locknut to
hhold the spring tension setting.
MAINTENANCE
PRV valves provide reliable ‘chatter-ree" operation when the system is free of abrasives and foreign
materials. Since the piston fits loosely inthe valve body, small debris can become trapped between the
piston and valve body. if you suspect the piston is stuck, shutdown the compressor and disassemble the
PRV. Inspection of the piston and cylinder body will show whether trapped debris or scoring has caused
the piston to *hang up”. The loose fiting piston should move freely within the valve body. Minor scratches
‘or scoring can be polished out. Major intemal component damage requires replacement of the entire valve.
‘The valve should be disassembled and inspected annually as part of the compressor’s scheduled
e maintenance program.
aon Compressor NewsiCN 06-009GE 1535 West Loop Nort, Suite €00
Oil & Gas Houston, Texas 77027 USA
Ware
SVWNTS)
compressor 1:
1d Parts lustration
TYPICAL DISASSEMBLY OF STANDARD PRESSURE REGULATING VALVE
Caution: Shutdown compressor before disassembling this valve. Failure to relieve oil pressure
prior to disassembly can result in personal injury.
Disassembly Procedure
Refer to Figure #2 for exploded pars illustration
Remove cap "B”
Remove O-Ring “E”
Remove lock nut "F*
Remove adjusting screw *C*
Remove retainer ‘D"
Remove spring "G*
Remove piston "I"
Remove stop ring "H" (Not Recommended - Special tooling is required to install new stop ring.)
eNopren=
Inspection
Inspect valve bore and piston for wear and scoring. Replace broken or damaged parts as required. Clean
all parts thoroughly and re-assemble by reversing the above procedure.
Re-assembly Procedure
1. Reassemble valve by reversing the above disassembly procedure
Please call GE Oil & Gas with any questions you may have.
24 Hour Technical Assistance: 832-978-9760
24 Hour OEM Replacement Parts: 1-800-727-8443 (Phone)
1-513-774-2925 (Fax)
Parts Web Page: woww partsdirect.ge.com
30F3
Compressor NewsiCn 06.008GE 1333 West Loop North, Suite 800
ro Houston, Texas 77027 USA.
oi eee
compressor [ews
Subject: Balance Weight Configurator Group: Frame
Number: 06-011 ‘Sub Group: Maintenance
Date: 06 ‘ies: D:
Proper balancing of opposing compressor throws is essential for safe and reliable operation, When
compressors are reconfigured, there will often be a change in the weight of the running gear components
(Giston, piston rod, crosshead). In these instances, the opposing compressor throws must be re-balanced,
To assist with proper balance weight selection, the GE High Speed reciprocating compressor Technical
Data CD includes an Excel too! designed to assist with proper balance weight selection (bill of material or
SOM). This tool is titled “DS ES FS balance weight configurator Version C.xls”. This tool includes.
instructions on its use. Attached is an example the balance input and output worksheets.
Items of Importance:
‘+ To avoid confusion conceming what constitutes individual items or pairs/sets, please note that
‘when ordering a quantity of (1) each of crosshead pin weights, you will receive two (2) pieces (1
pair). When installing crosshead pin weights, the weighted caps should be installed on each side.
of the crosshead pin. Ref PIN 1-026511 for the DS frame, and 2.027073 for ESIFS series frame.
+ Weight rings and weight ring adapters, are designed to form a complete citcle, and are sold as a
ring set consisting of two pieces. Order quantity of one each consists of these two “half circle
steel pieces.) Ref PIN _X_-026510 for weight rings, and 1-102903 for weight ring adapters.
I'you have any questions regarding this tool, or balancing your compressor, refer the operations and
‘maintenance manual, o* contact the Technical Assistance hallin listed below
24 Hour Technical Assistance: 832-978-9780 |
24 Hour OEM Replacement Parts; 1-800-727-8443 (Phone)
1-513-774-2925 (Fax)
worw partscirect ge.
Parts Web Page:
TOF 2 compressor NewsiCN 06-011GE 11535 West Loop North, Suite 600
Houston, Texas 77027 USA.
Oil & Gas
compressor (awe
Throw Location - DS, ES, FS Compressor Frames
Le Lele
ema me a
Cl os.esrs A,DS, £5, FS Models ES & FS Models,
freon
Balance Weight Configurator Input Sheet
GE HIGH SPEED RECIPROCATING GAS COMPRESSORS,
Buses vRrons ea
Balance Weight Configurator Ouput Sheet @
20F2 Ny
(Compressor NowsiCN 06-011GE 1833 West Loop North, Suite 800
Houston, Texas 77027 USA.
Oil & Gas eed
compressor [)@./s
Subject: 3-Piece Piston Design Upgrade Group: 06 Cylinders
Number: 06-012, revi Sub Group: “03 Pistons”
May 200: ies: Di 'S),F(S) Seri
'n 2006 GE Oil and Gas upgraded its 10° to 16.5" piston design ('03 series), which is used in the 98 series
cylinders installed on the D(S), €(S), F(S) and SHMB frames. Effective June '08, the 6.75" to 9.75" piston
Fange will be upgraded to the new '03 series design, see Table 1. This piston upgrade affects the
compressor's operational envelope, interchangeability, maintenance procedures (piston rut torque), and
compressor throw balancing. The cylinder nameplate tag (size line) will identify these '06 cylinders, which
Row come with the upgraded '03 series pistons, see Figure 4
Piston Upgrade Summary:
Figure 1: “89/95 Series” Piston Figure 2:
‘The upgraded three-piece piston combinations ('03 series) are listed in Table #1. The *03 Series” piston
‘esign can be used with the legacy (D, €, F) running gear or the uprated (DS, ES, FS) running gear
“03 Series” Piston Upgrade
[if Operation: Cylintler Bors Ranged (iniches) Sama] MAWAIOSII) |
Double Acting 6.76, 7.00, 7.25, 7.50, 7.75, 8.25 1800
Double Acting 8.00, 8.50, 8.00, 8.50, 9.75, "1800
Double Acting 10.0, 10.26, 10.5, 10.75, 110, 1725, 1175 1250
Double Acting 41.50. 11.75, 12.0, 125.12 76, 13.0 13.5, 1375, 1426] 800
Double Acting 14.0, 14.25, 145. 15.0 635
Double Acting 15.5, 16.0, 165 635
Pipeline Applications
AHR SOK Bre (a) RE MAW Ipal
9.76, 10.0, 10.25, 10.6, 10.75, 11.0. 14.25, 1250
Doubie Acting 11.00, 11.26, 11.60, 11.75, 12.00, 1680
Ductile iron
‘Table #1: '06 Series Cylinder Bores and MAWP
10F9
Compressor NeweICK 06-012, eviG E 1333 West Loop North, Suite 800
Houston, Texas 77027 USA.
Oil & Gas
compressor (ows
ITEMS OF IMPORTANCE:
Intorchangeability
The “03 Series’ piston assembly can be retrofit to existing “95 Series” cylinders, Both ‘95 and 03 pistons
‘can be mounting on the same piston rod with the same piston nut. However, the individual components of
the 03 and '95 pistons are NOT interchangeable
Piston Rod NutTorque and piston rod torque stamping
‘The new piston assemblies require a higher torque value than the 95 series pistons, see Table 2
below. When retrofitting “03 Series” pistons, remove the old torque value stamped on the piston rod end,
‘The “03 Series” piston rods will not have this torque value. The “03 Series" piston rod assembles will have
the torque values stamped on the piston face. Torque values can also be obtained from the operator's,
‘manual. Below is a table of torque values for the D(S)/E(S)F(S) frames.
k =! hes) i
Dy) [2.00 | 1400-1500 | 2450-2600
E(S) 2.25 | 2600-2700 | 3250-3300
FS) 2.50 _- | 2600-2700 | 3250-3300
Table 2: “03 Series” Piston Nut - torque valu:
Note: Ensure that Molykote P-37® (or equivalent anti-seize lubricant) is used
‘on the piston rod threads, piston rod pilots, and piston nut face when
assembling the components, Refer to Figure #3 for locations.
Apply Molycoat P-37@ on
piston rod pilot diameters
and piston rod
threads, nut &
bushing faces
igure #3: Assembly Instructions
20F9
‘Compressor Nows\CN 06-012, revGE 11333 West Loop North, Suite 800
Houston, Texas 77027 USA
Oil & Gas
compressor [ows
ITEMS OF IMPORTANCE CONT'D:
Reciprocating Weights
‘The increased reciprocating weights associated withthe '03 Series pistons may exceed current guidelines
for rod load. crank pin load, and cross head reversals. In these sitvalions, the operating erwvelope must be
revalidated, Extra consideration should be given to any cylinder running in a partly loaded o° “blow
through’ cylinder configuration. Refer to CN 08-014 (Operational speed tits) for addtional details on
speed imitations of unloaded cylinders. There's no change in frame rod load ratings associated with this
Piston upgrade.
Proper Balancing
Proper balancing of the opposing compressor throws is critical for safe and smooth operation. The
upgraded piston assembly is slightly heavier. Any change in reciprocating weight must be accounted for
when balancing the frame. The rec/procating balancing procedure is in the DS, ES, FS Frame operator's
‘manual. Norrnally, the reciprocating components (piston rod assembly, crosshead, balancing weights and
hardware) are weighed to calculate any required balance hardware adjustments. Conversely, rotating
‘components (connecting rod assembly and crosshead pin) are normally not included in this reciprocating
balance calculation. To facilitate proper reciprocating weight adjustment, refer to Compressor News CN
06-011 (Balance weight calculator and balance tool). The “03 Series” components and their estimated
weights can be found on table #5. The ESTIMATED weight cifference between the "95 Series” to "03
Series" pistons can be found in table #6,
Identification of Cylinders with ‘03 Series Pistons
‘The upgraded cylinders will have a name plate to identify the new piston design as shown in Figure #4. In
addition, cylinders with SIN 95622854, 9562286, and 9562675 will have the 03 series pistons but will
NOT have the new cylinder tag format,
Piston Identification
New Pistons will have the words "03 Series" stamped on the face of the piston halves for easy
identification. Part numbers are described in Table #3 and Table #4.
iston Bushings
For '03 piston sizes 6.75"to 7.75” & 8.25”
Existing crank-end and head-end bushings are used with the new piston halves.
For '03 piston sizes 8.00” & 8.50"to 16.50”
Ensure that the new crank-end and head-end bushings are used with the new piston halves.
Do NOT use the old bushing part number with the "03 Series" pistons. New bushings must,
be used
24 Hour Technical Assistance: 832-978-9780
24 Hour OEM Replacement Parts: 1-866-565-2903 (Phone)
1-513-774-4018 (Fax)
Parts Web Page wait partssupercenter com |
eee Seer tvee ttaeeccs|
30F9
Compressor NewsiCN 06-012, re71GE
Oil & Gas
11333 West Loop North, Suite 800
Houston, Texas 77027 USA.
compressor [))20s
Tables and Figure:
“03 Series” Piston, Ring Carrier & Piston Ring Part Numbers
[ERDSOESOR SO] OTre0 a te ETOIETO MSR Sm PIStOR
SPiston eiCarrieg. iis ¥ CaiFiek | aPistOn3]| :Carrier!/ st Rings
(aRPIN EH PEPIN SPINS: SPIN SAN SS] See PIN
[6-104631 [6- 104625)
'6-104632 6.104629)
[6-104633 [6-104629)2044-100067|
7104631 | 1-104629}
1.104632] 1-104629]
4104633] 1-104629|2045-100067]
'5-104631 [5-104829)
5-104632|5-104629)
'5-104633 [5-104629| 2046-100067|
2-104631]2-104629
2-104632 |2-104629|
2-104633 [2-104629|2047-100067|
3104631 |3-104629)
'3-104632 [3-104629)
'3-104633 /3-104629]2048-100067|
-4-104631 [4-104629)
4104632 |4-104629)
[4-104633 4-104629] 2050-1 00067]
7-104638 | 7-104630)
7-404638]|7-104630}
/7-104640 |7-104630]|2049-100057|
7.104638 | 1-104830,
1.104639] 1-104630
4104640] 1-104630]2051-100067|
[5-104638/5-104830)
5-104639]/5-104630|
'5-104640 [5-104630]2052-700067|
2-104636 |2-104639)
2-104639 |2-104630)
2-104540 |2-104630]2053-100067|
|4-104636 4.104630)
4-104639 | 4-104630)
4104640 |4-104830|2054-100067|
3-104638/3-104630)
3104639] 3-104630}
[3-104840|3-104830|2056- 100067,
[6.104638 |6-104630
6-104639/6-104630)
[6-104640 |6-104630|2056-100067,
4-103548 | 1-103551
4103549] 1103561
1-103560]|1-103551}2057-100067]
5.103548 |5-103551
'5-103549 |5-103551
'5-103550|5-103551|2058-100067|
'2-103548 |2-103551
[2-103549|2-103551
2-103550|2-103551]2059-100067|
[6-103648 [6.103551
(6-103549/6-103551
16-103650 6-103551|2060-100067;
103548] 3-103651
3-103549| 3-103551
3.403550 [3-103551]20611-100067|
4-103548|4-103551
4103549] 4-103551
4-103550|4-103551]2082-100067|
'5-103430] 5-103408|
5-103476|5-103408
'5-103407 [5-103408)2063-100067|
7-103430 |7-103408|
7103416 |7-103408
7-103407 |7-103408)2064-100067|
1-103430| #103408
1-103416 | 1-103408
1-103407 |1-103406]2065-100067|
[2-103430]2-103408)
2-103416|2-103408;
[2-103407 |2-103408]2067-100067|
[6-103430]6-103408|
[6-103416[6-103408|
[5-103407 [6-103408| 2068-100067|
3-103430|3-103408,
'3-103416/3-103408]
[3-103407 |3-103408|2069-100067|
4-103430|4-103408,
/4-103416] 4.103408;
'4-103407 [4-103408|207 1-100067|
-103430| 8-103408)
6-103416|8-103408}
/8-103407 [8-103408|2072-100067|
4-103531[1-103534]
1103532] 1-103534|
4-103533] 1-103534]2073-100067|
7.103531 |7-103534
7-403532|7-103534
'7-103535 |7-103534)2074-100067|
14.50_|2-103531|2-103534
2-103532|2-103534)
[2-103533 2-103534]2078-100067|
15.00 |3-103631] 3.103534)
3-103592| 3-103534|
3-103533 |3-103634|2077-100067|
15.80 _[4-103531]4-103534
[4-103532|4-103534|
4-103533 [4-103534|2079-100087|
16.00 |5-103531|6-103534
'5-103532|5-103534
'5-103533|5-103534)2081-100067|
16.50_[6-103631]6-103534
[6.103532 ]6-103534
6-103533/6-193534)2083-100067|
40F9
Compressor NowsiGN 06-012, rev!@ cE 1533 vest cop ort sue eto
Houston Texos 77027 USA.
Oil & Gas
compressor (ews
Ne #4: 6.75"-7.75", 8.25” “03 Series” Bushing Part Number
BUSHING, PISTON. CE D50/60
4-011386 BUSHING, PISTON, HE E/F 50/60/70.
4011387 BUSHING, PISTON, CE E/F 50/60/70
¥ 13sSeri
A INTE
3-011388 4.103521
3.011389 4.103522
4-011385 4-103417___ BUSHING,
4.011387 4103418 BUSHING, PISTON, CE E/F 50/60/70
SOF
Compressor New\CN 06-012, 071@ ce iss west Loop Nort, sue 200
Gino tear merase
Oil & Gas
compressor (ows.
Table #6: “03 Series” Pistons - DS Component Estimated Weights, Ibs
[CE HEY
7: Stroke. | sBushings
Piston Ecombiied
7170
170
1170
77
1.70
1.70
1738
788
i738
788
a7 88
376 788
386 788
aad 7788
e puss aisarcie Peay aoa | 908
1012 312 78.1 ea 788
10 227 305 a4 1788
1" 342 2 “34 788
wi 357 335 445 178
[es [aT 34 an 456 17.88
134 38) 326 066 788
2 363 34 a6 i788
22 0 a6 | Es 768
1234 208 a7. wu 17.68
2 “7 393 522 1788
ne 438 41 544 1768
1334 “4s 2 552 17.00
rr 156 rn 56.1 17.88
a a 456 aa 62 1788
1412 a7 45 581 17.98
16 49.8 ara eo 1788
Te12 24 482 626 1788
6 sad S15. 647 1788
16.12 567, 537 669) sz08 |
sors
Compressor NewsiCN 06-012, rov1GE
Oil & Gas
compressor (\
“03 Se
11333 West Loop North, Suite 800
Houston, Texas 77027 USA.
aNVVIC
SWS
i do Tica
ESS O38
ESS 7,
ESS Ti
ESS Tie
ESS [Tae
ESS ei
ESS 3
ESS oie
ESS Baia
ESS 3
ESS Sim
ESS 312, 785, 245 21s 38. 188.
ESS aaa 302 259. 26. 286, 168
ESFS “2 2B 23 zap see 88
ESS Toa 297 277 256 404 165
ESS 1012. 312 234 259) a1 185
ESES 109 327 305) 28.4 224 186.
ESS 1" 342 32 208 4 185.
ESES TET 357 335 313 45 186
ESES 112 34 312 239) 458 7166
ESS a3 ue 26 203) 485 165,
ESS 12 363 34 37) ara 166
ESFS 1242 40 378 352 60 166.
ESFS 12314 409) 315; 6 om 166
ESES 8 417 309) 365 522 166
ESS B12 436 ‘41 385 sa 768.
ESS 1904 Prey 42 394 552 165
ESS 4 | 456. 2 404 on 168.
ESS 1a va 456 a4 a1 572. 168
ESS 112 ary 45 223 68.4 166
ESS 5 298 a4 443 eo 165
ESS ee 224 402 464 026 166
ESS 16 e44 51s 486 ea. 165
ses [tev | eer [sar | so | eso ss
ToF9
‘Compressor NewetON 06-012, v1GE 4533 West Loop North, Suite €00
Houston, Texas 77027 USA.
Oil & Gas
compressor (ews
Table #8: Estimated Weight Difference - 95 Series to 03 Series Pistons
Note: Weights are estimates only. Exact weights should be determined by weighing
individual components.
-'03'Seriés y-"95 Series’
Estiriatod Total prston Weight Oitstence Iba:
Pistoralves? Ring Cather, abd Bushings) #
esc s meme ESAS:
fs wg a] se Sea
7080 | 1040 | 10.80
i140 [i120 | 11-40
1220 | 1200 | 1970
137 | 180] 990 Estimated wight
diferences are
se [uo | et es
2270] 23.80] 2270] 79.00 jonas
23.00} 2450 | 2250} 2180 Delta 220 go.
23.10| 2480 | 23.60 | 21-70
2330_| 25.20] 22.80 | 21-60 Therefore a posive
73.40 25.80 —| 22.90 | 160 value shows e weight
2360_| 26.20 | 93.10 p80 increase ftom the "85
23.40 [26.80 —| 2830] >t 8 series"
1658 [1140 | 1600 | 19.30
1763 [12.30 | 17.10 | 20 50
1848 [13.10 | 17.90 | 21.30
1958_| 1410 | 1800 | 20.80
20.78 [1520 | 2020] 23.90.
z203 | 16.30 | 2150 | 25.40
16.98_| 900 | 14011670
17.08 | 890_| 1680 | 16.90
2038 | 1230 | 18.80] 20.10
2as8_| 1620 | 2400 | 2430]
23.08 | 1740 | 2340 | 2.60
2528 | 1640 | 2470] 2500
2548 | 1670 | 24.90} 25.20
2598 | i660 | 25.40] 2870
703 | 020] 650 13.40
Z| 0.30 | ~660 13:50
718 | 030 | e690] 13,70
a6 | 050 720 | 75.10
1512 | 128 | a8 | 070 800 | 15.76
E 16__| 097 [678 | 180 | 620 14-10
a612 | 108 [e989 | 050 | 8.40 1670
sore
Compressor NewetiCN 06-012, 1| 1555 West Lop North it o0
7 GE Towson Tous Moar Use
Oil & Gas
compressor (2.
Cylinder Tag
06 Designates.
the 08 series
cylinder with
the new '03
series piston
design.
90F9 @
‘Compressor NoweiCN 06-012, covt002851
GE oe
Oil & Gas ~ :
compressor [aw
Subject: Operating Limits ‘Group: All
Number: 06-014 Sub Group: All
ite: 6-May-21 ‘ies:
In recent years, GE Oil & Gas has introduced a variety of compressor upgrades. These changes may
affect the speed, pressure, and temperature limitations of the compressors. Always make certain that you
are using the most recent version of our performance software. Also, due to the variely of components
now available for GE frames (including legacy Chicago Pneumatic, Energy Industries, and Gemini frames),
itis important to verity the compressor model, as well as the piston and rod weights. Upgraded
‘components can have significantly different weights when compared to legacy parts, which can change
‘compressor performance limitations,
lems of importance:
* Always use the most current version of the performance software. If you are not sure you have the
latest version of the software. contact the GE technical services hotline fora copy of the latest,
Tech CD.
* The default data within the compressor performance program will nt reflect changes to meet
specific performance requirements. It is the users’ responsibility to adjust the peormance
rogram to reflect the specific configuration. The accuracy of the performance program depends
‘upon the input of data for:
© Allperformance points, including start up.
Piston rod assembly and crosshead weights
Low it valve areas.
Valve Spacers
Variable Volume Clearance Pocket Setting
Clearance Rings (90 series cylinders)
Cylinder action (HE unloaded, CE unloaded, Blow Through, and Double Acting)
© Cylinder locations
‘* The Technical Data CD includes instructions on how to input of these variables into the
performance software. For assistance or questions related to this task, contact the GE technical
services hatin,
‘+ The weights of the compressor running gear components have a direct relationship upon the
inertial loads within the compressor. During start up, no load, and partial load operation, a
thorough understand of the inertial loads is important (refer to CN 06-007). GE has introduced a
variety of upgraded components that are interchangeable with existing frames and cylinders, for
safe and reliable operation, it's important to setthe operating limits using the actual weights of the
Compressor and piston rods. The performance software begins with “nominal weights, actual
weights can found on the GE shop documentation shipped with the compressor, as well as,
‘stamped’ on the piston rod, or piston half, or assembled weights as measured in the field,
o00000
| 24 Hour Technical Assistance "632.878.9780
24 Hour OEM Replacement Parts: 1-800-727-8443 (Phone)
1-513-774-2925 (Fax)
Parts Web Page: new partsdirect.ge.com i
Hora Compressor NewatCn 06-014002851
GE 1533 West Loop North, Suite 800
Houston, Texos 77027 USA.
OIL & GAS
NAIVE
compressor (jaws
Subject: Spacer, Valve Group: Cylinder
Number: 07-001, rev 2 ‘Sub Group: Cover & Holder
Date: _4Jan, 2008 __—__—Series: __89, 95, 06, 07, PL
‘As part of our process to improve operational fexibiliy, GE Oil and Gas provides valve spocers for its product
line, This updoted Compressor News lsts currently available spocers for the 83, 95,06. 07 and PL (pipeline)
cinder bodies, in the 4.5" through 21” cylinder range, These are cylinders, barrel & conical type, used on DS/D,
SIE, FS/F and SHMB compressor frames. Use of these spacers will chonge the eylinder' internal fixed
leorance volume. Any clecrance change will affect the unit's horsepower, flow, and inter-stage pressures. itis
‘mportont that all clearance changes and corresponding compression affects ore accounted for using GE's most
cutrent compressor performance prediction program. Failure to do so may resul in compressor overload.
Compressor valves ore normally designed to be close to the cylinder bore, thus minimizing « cyiinder's inherent
fixed clearonce volume, (see attoched IL 1394 & IL2001, A valve spacer is an optional clearance device used to
physically relocate the vaive in its port further away from the cylinder bore which wil increase a cylinders fixed
Clearance volume. As shown in Figures #1 & #2, the valve spacer and valve holder set ore used to replace the
standard valve and holder set. Tables #1 6 #2 list the additional fixed clearance available by use of these.
devices.
Another common method to odd a small amount of fixed cylinder clearance volume is to use the {HE] head end
‘ond ICE! crank end indictor ports, Fo minimize fixed clearance, a long indicator plug is normally provided in
these cylinder ports. An indicator valve {Keinexr), when installed, is used to access the cylinder for performonce
evaluation. The indicator port plug can be replaced wath a short pipe plug. The attached list provides the volume
‘added for each indicator plug replaced. There ore.a maximum of four lé} indicator plugs per cylinder, two HE and
two CE. The port number for a standord NPT steel plug is 1019.
ITEMS OF IMPORTANCE
When valve spacers are used. two vaive seat gaskets are required for each spacer (see Figures #1 & #2). Aseat
{gasket is placed on each side of the valve spacer for proper sealing.
'tis recommended thot cylinders with additional fixed clearance devices installed be identified by on external
means, Compressor performance cannot be accurately predicted unless all addtional clearance volume is token
into eccount including the quantity and type of spacer or plug,
In cases where voive spacers are no longer needed itis highly recommended that you do NOT place both the
valve spacer and holder above the valve. In these situations GE recommends the re-installation of the valve's
‘stondard holder. Stacking the valve spacer & its holder obiove the valve con cause gas flow restriction & and
‘component damage.
you have any questions in regords to this topic, or need assistance checking the performance of your
‘compressor please contact the GE High Speed Reciprocating Compressor technical assistance phone number
listed below.
24 Hour Technical Assistance. 832-978-9780 (Phone) _
24 Hour Parts: 1-866-565-2303 (Phone) 1-513-774-4018 (Fax)
Parts Webpage: www partsdirect. ge.com
Emoil address for replacement parts inquiries: olgasteambox@ge,com
TOFS compeessoe Newson 07-001 rev2GE 1333 West Loop North, Suite 800
Houston, Texas 77027 USA.
OIL & GAS
compressor (0
‘ 95 & 06 Series Cylinders 89 SERIES CYLINDER
WITH VALVE COVER WITH VALVE Cover
O-RING SEAL CRUSH GASKET SEAL
VALVE WITHOUT SPACER : VALVE WITHOUT SPACER
STANDARD) i ¢ STANDARD)
A
VALE COVER Wa z
“y LOTMA cove
cover osteve corte Gagne
st ¥6 Hove R— aL noveer
Pe aL
eres! «Shangasor
om caser
VALVE WITH SPACER : VALVE WITH SPACER
caTOR rv
OPTIONAL FOR ADDED CLEARANCE? * {OPTIONAL FOR ADDED CLEARANCE)
NOTE: VALUE SPACER SHOWN WH TH
SEALING BASKETS PROPERLY INSTALLED 11394
GENERAL ARRANGEMENT tv. awe
TYPICAL CYLINDER WITH AND WITHOUT
VALVE SPACERS
Figured
{394 Typical “Barrel cylin
20F5
Compressor NewsiCN 07-001 va
@GE 11833 West Loop North, Suite 800
Houston, Texos 7027 USA
OIL & GAS
compressor (awe
89 8 07 TYPICAL CONICAL CYLINDER WITH
VALVE COVER CRUSH GASKET SEAL
cau ca |p ci meH0 Exo
VALVES WITH SPACER
(OPTIONAL FOR
ADDED CLEARANCE)
NOTE: VALVE SPACER SHONT HLTH SEALING
ASHES PROPERLY THSTALLED
sontd Genie
NOTE: 141 - 1" MPT INDICATOR PLUGS (2 HE & 2 CED ER CHLINOEE,
ORLY OnE SET OF HHDICATOR PLUG. SHON
2001
89 AND 07 SERIES meet
TYPICAL CONICAL CYLINDER WITH AND WITHOUT
VALVE SPACERS
Fis 2 ical “Conical” Type Cylinders
SOF S Compressor News\CN 07-001 rev2GE
OIL & GAS
‘Suction Valve Spacer/Halder
Cvlinder Shor
Bodys | vane | spacer added vane | Number | valve | indicator
Bore Sze, | Depth, | Spacer | clearance | Holder | Holder | Suction | Seat | plug added
Range mam | Inches | Port Number | Volume | Depth port | valves’ | Gosket | Volume
‘ond Winch | inches | Number | cylinder | Port # | —tineh!)
Type
wear 0 Wi 7 330 | Sor aae Sse 7
ora9 | 179 | o3re | ro