Inspection Request for Ethiopian Hotel Project

This document is a request for inspection of reinforcement work on columns and shear walls in the basement level 1 of a hotel project. It details the project title, employer, contractor, date and time of inspection, location, purpose of inspecting the reinforcement work, and a description of the completed work. The contractor is requesting inspection to check if the formwork can be closed.

Uploaded by

baolaing song
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
150 views1 page

Inspection Request for Ethiopian Hotel Project

This document is a request for inspection of reinforcement work on columns and shear walls in the basement level 1 of a hotel project. It details the project title, employer, contractor, date and time of inspection, location, purpose of inspecting the reinforcement work, and a description of the completed work. The contractor is requesting inspection to check if the formwork can be closed.

Uploaded by

baolaing song
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Request For Inspection

Date: 2020.3.1
Request no. 000033
Project Title: Design, Procurement, Furnishing & Execution of Ethiopian Skylight 5-star Hotel Phase-2 Project

Employer: Engineer: Contractor:

We request your attendance to inspect the following works :


1. Type : Buildings Reinforcement work of columns and shear walls for basement 1 at part 1area
2. Inspection time: 10:00 am Date : 2020.3.2
3. Location :project site Building √ Floor Element Drawing no.
19AH03M-J2-23g2/24g2/25g2

4. Inspection First Second Third

5. Purpose of the inspection:


3. Structure
1. Surveying 5. Architecture
Setting out Formwork
Blockwork Floor Finish
Levels Reinforcement
Plaster False Ceilings
Verticality Concreting
Metals Roofing
Woods & Plastics Waterproofing
2. Earthworks 4. Electro-Mech.
Formation First Fix
Doors & Windows Painting
Sides of Excavation Second Fix
Wall Finish Furniture

Others (specify) -
We have complete the reinforcement work of columns and shear walls for basement 1 at part 1 area,here with
Particular Details the inspection request for form shutter close

Submitted by : Song Baoliang Signature

6. Inspection report Signature

Date/Time of inspection :

7. Engineer's Representative comments:

The works are : Approved Approved as Noted Rejected

Signature: Date:

Attach all relevant particular test forms IR-BLDG-1


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.

S-PRC-SS-02(F33) Rev 2