Testing Commissioning Verification Inspection Guide Sheets
Testing Commissioning Verification Inspection Guide Sheets
TESTING &
COMMISSIONING
VERIFICATION
INSPECTION GUIDE
SHEETS
Pre-Test Activities
Yes No Factory staff has informed workers that testing activities will be conducted
Yes No Contractor has proper testing tools and equipment
Yes No System has no ground faults\troubles\supervisory\or alarm signals present
Inspections
Control Equipment Visual Inspections
Yes No Control equipment panel(s) are installed within spaces meeting the manufacturers operational requirements for
temperature and humidity
Yes No Control equipment panel(s) are accessible and not obstructed
Yes No Control equipment panel(s) are normal condition prior to testing
If no, reason(s): ...........................................................................................................................................................
Yes No Alarm control panel indicates no supervisory or trouble conditions
If yes, reason(s): ..........................................................................................................................................................
Yes No Dedicated power is provided to the Alarm Control Panel
Yes No Circuit breaker or power-disconnects are correctly labeled
Yes No Correct size batteries are provided for FACP and Power Supplies
Yes No Batteries have manufacturing date and the date of installation markings
Yes No Control equipment is monitored by Building Fire Alarm System
Yes No ...................................................................................................................................................................................
Yes No ...................................................................................................................................................................................
Control Equipment Inspection Notes:
Functional Testing
Yes No N\A Control equipment confirmed for primary and secondary power loss supervision
Yes No N\A Networked panels are correctly supervised
Yes No N\A All visual displays and annunciator lamps are functional
Yes No N\A Transport time from the farthest sampling point is within 120 seconds
Yes No N\A Alarm conditions report correctly to Bldg. Fire Alarm System
Yes No N\A Supervisory conditions report correctly to Bldg. Fire Alarm System
Yes No N\A Trouble conditions report correctly to Bldg. Fire Alarm System
Yes No N\A ...............................................................................................................................................................
Yes No N\A ...............................................................................................................................................................
Yes No N\A ...............................................................................................................................................................
Functional Testing Notes:
Post-Test Activities
Yes No N\A Factory staff has informed workers that testing activities are complete
Yes No N\A System has no ground faults\troubles\supervisory\or alarm signals present at the end of testing
Yes No Fire Alarm System is functioning in accordance with approved design documents
If no, reason(s):
Pre-Test Activities
Yes No Factory staff has informed workers that testing activities will be conducted
Yes No Contractor has proper testing tools and equipment
Yes No System has no ground faults\troubles\supervisory\or alarm signals present
Inspections
Control Equipment Visual Inspections
Yes No Control equipment panel(s) are installed within spaces meeting the manufacturers operational requirements for
temperature and humidity
Yes No Control equipment panel(s) are accessible and not obstructed
Yes No Control equipment panel(s) are normal condition prior to testing
If no, reason(s): ...........................................................................................................................................................
Yes No Fire alarm control panel indicates no supervisory or trouble conditions
If yes, reason(s): ..........................................................................................................................................................
Yes No Dedicated power is provided to the FACP
Yes No Circuit breaker or power-disconnects are correctly labeled
Yes No Correct size batteries are provided for FACP and Power Supplies
Yes No Batteries have manufacturing date and the date of installation markings
Yes No Has wiring of control equipment been completed as per manufacturer's instruction
Yes No Wiring entering and leaving control equipment is protected from physical damage and terminated correctly
Yes No End of Line Resistors are located in correct locations for supervised circuits
Yes No Remote control-panels and equipment are properly supervised
Yes No ...................................................................................................................................................................................
Yes No ...................................................................................................................................................................................
Control Equipment Inspection Notes:
Functional Testing
Yes No N\A Control equipment confirmed for primary and secondary power loss supervision
Yes No N\A Networked panels are correctly supervised
Yes No N\A All visual displays and annunciator lamps are functional
Yes No N\A Correct locations of EOL Resistors are verified for supervised circuits
Yes No N\A Devices tested report correct address at panel for activated or missing devices
Yes No N\A Devices tested for functionality with open SLC circuits
Yes No N\A Voltage drop measured for NAC circuits
Yes No N\A Evacuation message or signaling is understandable
Yes No N\A Audibility for occupied areas is at least 15 dBA above ambient
Yes No N\A Visual notification is synchronized when more than one device is in the same field of view
Yes No N\A Music or PA systems are shut down upon activation of alarm system
Yes No N\A Elevators recall on correct devices
Yes No N\A Exhaust Fans shut down upon activation of fire alarm
Yes No N\A ...............................................................................................................................................................
Yes No N\A ...............................................................................................................................................................
Yes No N\A ...............................................................................................................................................................
Functional Testing Notes:
Post-Test Activities
Yes No N\A Factory staff has informed workers that testing activities are complete
Yes No N\A System has no ground faults\troubles\supervisory\or alarm signals present at the end of testing
Yes No Fire Alarm System is functioning in accordance with approved design documents
If no, reason(s):
Pre-Test Activities
Yes No N\A Factory staff has informed workers that testing activities will be conducted
Yes No N\A Contractor has proper testing tools and equipment
Yes No N\A Connected Fire Alarm System has no ground faults\troubles\supervisory\or alarm signals present
Inspections
Visual Inspections
Yes No N\A Does diesel fire pump room have adequate ventilation
Yes No N\A Does suction from tank have strainer
Yes No N\A Pump Controllers in Auto and free of trouble signals
Yes No N\A Battery terminals free of corrosion
Yes No N\A Are fuel lines steel pipe
Yes No N\A Is fuel tank properly sized (1 gallon per HP) Tank Size ..........
Yes No N\A All valves are supervised and open or closed as required
Yes No N\A Diesel Fuel Tank size ................. / Level: ................. (½, ¾, 1)
Yes No N\A Water Tank size ................. / Level: ................. (½, ¾, 1)
Yes No N\A Pump(s) provided with positive suction head and clean water supply
Yes No N\A Is vortex plate installed in tank suction
Visual Inspection Notes:
Inspection Notes:
Pre-Test Activities
Yes No N\A Factory staff has informed workers that testing activities will be conducted
Yes No N\A Contractor has proper testing tools and equipment
Inspections
Control Equipment Visual Inspections
Yes No N\A No visible evidence of external leakage from piping and joints
Yes No N\A Floor Control Valve Assembly:
•Control valve open
•Pressure gauge present: Static pressure: .................
•Check valve present, if shown on drawings
•Inspector’s test and drain connection present
Yes No N\A Is typical ceiling Obstructed or Unobstructed (Unobstructed: NFPA 13, Section, 3.7: if structural members are
greater than 7 ½-feet apart or if less than 7 ½-feet apart beams and girders less than 4-inches deep).
Yes No N\A Sprinkler installation and piping in accordance with drawings including sprinkler spacing and sizing
Yes No N\A Sprinkler support/hangars:
•Is each pipe length supported and not welded to support?
•Is any other equipment supported from sprinkler pipe?
Yes No N\A If water is from a pond/lake/river or other open top raw source, are pendant sprinklers below ceilings on a
return bend
Yes No N\A If sprinkler below ceiling and pressure exceed 100 psi, are sprinklers retrained from upward movement
Yes No N\A Sprinklers free of paint/loading/dust
Yes No N\A Sprinklers in proper orientation
Yes No N\A Are all obstructions (storage and partitions) at least 18-inches below deflector (NFPA 13: 8.5.5.3)
Control Equipment Inspection Notes:
STANDPIPE SYSTEMS
Document Review
Yes No N\A Installation Certificate and Record of Completion is available and on-site
Yes No N\A Approved as-built drawings are available and on-site
Yes No N\A Product Information Sheets and Listing Information is available and on-site
Yes No N\A Does all the necessary equipment have third party listing certificates consistent with products on -site
Pre-Test Activities
Yes No N\A Factory staff has informed workers that testing activities will be conducted
Yes No N\A Contractor has proper testing tools and equipment
Inspections
Control Equipment Visual Inspections
Yes No N\A Are all control valves open (bottom of riser)
Yes No N\A Are there control valves on the fire hose valve piping; if so is the control valve electronically supervised
Yes No N\A Fire hose valves located in stairs and unobstructed
Yes No N\A Fire hose valves do not obstruct stairs
Yes No N\A Standpipes properly supported and not welded to supports
Yes No N\A Condition of hose new/without tears or rot
Yes No N\A Fire department hose valve gasket in place
Yes No N\A Pressure gauge present at top of standpipe riser: ........... Static Pressure
Functional testing
Yes No N\A Operate all hose valves for full range of motion (make sure all caps are in place and don’t leak)
Yes No N\A Flow top of riser hose valve, for full flow
Yes No N\A Pressure gauge at top or standpipe riser: ........... Residual Pressure when flowing