PUBLIC NOTICE
In exercise of powers under Section 177 of the Electricity Act, 2003 (No. 36
of 2003), the Central Electricity Authority (CEA) proposes to notify the
Regulations namely “Central Electricity Authority (Technical Standards
for Communication System in Power System Operations) Regulations,
2019”. The proposed draft regulations are available at CEA website:
www.cea.nic.in. The Regulations can also be seen in the office of Chief
Engineer (Legal), Room No. 622 (N), Sewa Bhawan, R. K. Puram, New
Delhi-110066 on any working day before 10th May, 2019 between 1100 hrs
to 1600 hrs. All the Stakeholders including the public are requested to send
their comments on the draft Regulations to Chief Engineer (Legal), Room No.
622 (N), Sewa Bhawan, R.K. Puram, New Delhi-110066 by post or through
e-mail latest by 10th May, 2019.
(P C Kureel)
Secretary, CEA
Ministry of Power
(Central Electricity Authority)
Draft NOTIFICATION
New Delhi, the ………………., 2019
No. Comm._Std./PCD/CEA – Whereas the draft of the Central Electricity Authority (Communication
Standards for Power System Operations) Regulations, 2019 was published, as required by Sub-
section (3) of Section 177 of the Electricity Act, 2003 (36 of 2003), read with rule 3 of the Electricity
(Procedure for Previous Publication) Rules, 2005. Now, therefore, in exercise of the powers
conferred by sub-section (1) of Section 177 read with clause (b) of Section 73 of the Electricity Act,
2003, the Central Electricity Authority hereby makes the following regulations, namely: -
1. Short title and commencement – (1) These regulations shall be called the Central
Electricity Authority (Communication Standards for Power System Operation) Regulations 2019.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. Definitions - (1) Words and expressions used in these regulations shall have the same
meaning assigned in the Electricity Act, 2003, Central Electricity Authority (Technical Standards for
connectivity to the Grid) Regulation, 2007 & (Technical Standards for construction of Electrical
Plants and Electrical Lines) Regulation, 2010, Central Electricity Regulatory Commission (Indian
Electricity Grid Code) Regulation, 2010 & (Communication System for Inter-State transmission of
Electricity) Regulation, 2017 and amendments thereof
(2) Other words have been explained as per the context in these regulations.
4. Application - All Users, SLDCs, Discom LDCs, RLDCs, NLDC, CTU, STUs, RPCs, REMC,
FSP (Forecasting Service Provider) and Power Exchanges.
6. Standards and Codes of Practice – (1) Follow the industry best practices and
applicable industry standards in respect of the equipment installation and O&M (Operation and
Maintenance).
Technical Standards for Communication System in Power System Operation
(2) The communication equipment shall comply with the relevant standards of Bureau of Indian
Standards (BIS). If BIS Standards are not available for a particular equipment or material, the
relevant British Standard (BS), International Electro-Technical Commission (IEC) Standard, Institute
of Electrical and Electronics Engineers (IEEE), EIA (Electronic Industries Association) Standards,
American National Standards Institute (ANSI) Standards, ITU-T (International Telecommunications
Union – Telecommunication) / CCITT (Consultative Committee for International Telephony and
Telegraphy) Standards, CISPR (International Special Committee on Radio Interference) Standards,
Fiber Optic Association (FOA) or any other equivalent International Standard shall be followed.
Provided that whenever an International Standard is followed, necessary corrections or
modifications shall be made for prevailing local ambient conditions before adoption-of the said
Standard.
(3) The latest version of Standards shall be followed.
(4) The effects of wind, storms, floods, lightening, elevation, temperature extremes, icing,
contamination, pollution, earthquakes, etc. shall be considered in the design and operation of the
connected facilities.
8. Access to Data - Data & Information is a valuable asset for the Power System where strict
confidentiality shall be maintained. Protecting information assets from unauthorized, incorrect or
accidental access, use, modification, destruction or disclosure shall be responsibility and obligation
of the concerned person. Communication System access shall be designed, developed, built,
configured and maintained in such a way that only authorized users have access.
9. Design & Planning – (1) Communication System shall be planned up to the interface
points of the User and the respective Control Centre including the interfacing communication
equipment at the respective location.
(2) Cellular and RF based communication technology shall not be considered for control and
protection functions.
(3) Communication System shall be designed as per Communication Planning Criteria for
development of reliable communication system for the Power System.
(4) Central/State Transmission Utility while planning shall consider design of the intervening
communication system for seamless integration to have Wideband network.
(5) User shall ensure centralized monitoring / management of its communication network and
shall provide necessary facilities for identification of fault and generation of various reports on
availability of the communication system.
(6) User shall be responsible for planning, design, implementation and secured operation of its
own equipment to be interfaced with the Communication System.
2
Technical Standards for Communication System in Power System Operation
(7) User, whose system is proposed to be interfaced with the communication system, shall
furnish the requisite interface information to the appropriate Control Centre as prescribed by them.
(8) Communication equipment installed shall be interoperable, so as to allow seamless
integration between different vendors.
(9) Every interfacing with the intervening communication system shall be covered by interface
agreement between the parties sharing the communication. The interface agreement shall contain
general and specific technical conditions supported by interfacing details and layout drawings for the
interfacing.
(10) Network equipment shall be synchronized through provision of GPS clock to achieve the
desired functionality.
(11) At least 10 hours battery backup shall be provided for the communication equipment for all
the nodes. Extended backup shall be provided depending upon requirement.
(12) Supply voltage shall be 48V DC +15%, –10%. (positive pole earthed).
(13) The minimum guaranteed life for all the wideband communication equipment shall be 10
years.
10. Site Responsibility Schedule – (1) A Site Responsibility Schedule (SRS) for every
interface point shall be prepared by the owner of the communication interface equipment at the
interfacing location.
(2) SRS shall include:
a) Schedule of telecommunication interface equipment, their responsibility for
access, maintenance and operation;
b) Schedule of Auxiliary Power Supply catering communication equipment;
c) Schedule of patching details (like STM level, E-1 level, TCP/IP level) for channel
routing, and numbers of fiber connectivity;
d) Type of connectors required for making the connection through;
e) Specific information provided by the OEM (Original Equipment Manufacturer);
f) Site / Node Common Drawings for each interface point and
g) Responsible person (s) for the site
(3) If Packet technology is used in backhaul network, following additional information shall be
included:
(a) Mode of Connectivity
(b) Protocol used (Level 2/Level 3)
(c) Bandwidth Provisioning
11. Access to Connection Site / Node - Owner of the interface site / node shall provide
reasonable access and space to the User or its authorized representative, whose equipment is
installed or proposed to be installed at the interface site for installation, configuration, testing and
O&M of the equipment.
12. Performance – (1) User shall be capable of transmitting all operational data as required
by appropriate Control Centre.
(2) Communication System shall be planned with required bandwidth to conform the data
interval time, as specified below:
3
Technical Standards for Communication System in Power System Operation
13. Control Command Delay - Communication System shall relay the Control Command
from the Control Centre to relevant equipment within 2 seconds for SCADA and within 1 second for
WAMS, whether the command is transmitted directly or via Data Concentrator.
14. Reliability – (1) Total outage period shall be less than 16 hours on monthly basis
respectively for interface node, wideband node and communication media. The total outages in a
rolling 12-months assessment period shall be less than 48 hours
(2) While designing the communication system, adequate redundancy shall be kept.
15. Cyber Security – (1) All Users and Control Centre Owner connected to the communication
system shall have robust programs in place to adequately and continuously manage cyber security
risks that could have adversely impact power system communications and supporting system and
infrastructure.
(2) The cyber security program shall address the following:
a) Compliance with provisions of Information Technology Amendment Act, 2008 (IT Act,
2008) and National Cyber Security Policy, 2013 (NCSP, 2013), as amended from time
to time.
b) Implementation of NCIIPC (National Critical Information Infrastructure Protection
Centre) Guidelines.
c) Implementation of guidelines and advisories issued by Computer Emergency
Response Team (CERT– India) and applicable Sectoral CERT.
d) Compliance to CEA (Central Electricity Authority)’s Cyber Security Regulations, as
and when they come into force.
16. Safety & Testing – (1) Owner of communication equipment shall be responsible for the
safety of its equipment installed.
(2) Testing shall be carried out as and when the communication equipment is replaced /
upgraded to confirm the compliance to these standards.
4
Technical Standards for Communication System in Power System Operation
17. Maintenance – Monthly Outage shall be planned and got approved by the owner of
communication equipment in the concerned RPC (Regional Power Committee), as per detailed
procedure finalized by the respective RPC.
18. System Upgradability & Expandability - All Communication interfaces shall be sized
(though not necessarily equipped) to support system / subsystem expansion / upgradation to full
capacity as provided by specified aggregate transmission rates. Equipment units provisioned for
equipped subunits shall be terminated with appropriate termination interfaces.
19. Training - Specialized training shall be provided to the persons manning the centralized
monitoring center and the field support staff to ensure quick fault detection and restoration of the
communication system. Training shall be provided to the maintenance persons on all communication
equipment for its operation and maintenance.
20. Adoption of New Technologies - Plan shall be made for introduction and adoption of new
technologies, with the approval of the Appropriate Commission or as per the regulations or directions
of the Appropriate Commission or pursuant to the reforms programme of the Appropriate
Government. The Standards related to some existing communication technologies in Power System
operation are enclosed at Schedule III to VII.
21. Relaxation and Interpretation of Regulations – (1) The Authority by order in writing may
relax any provision of the said regulations on its own or in respect of the matters referred to the
Authority on case to case basis.
(2) If a question arises relating to the interpretation of any provision of these regulations or its
relationship and interplay with any other regulation of Central Electricity Authority, the decision of
the Authority shall be final.
5
Technical Standards for Communication System in Power System Operation
SCHEDULE-I
(see regulation 5(1))
1. INTERFACE STANDARDS
2. LOCAL MONITORING
All the interfaces shall be provided with audio/visual status indication to indicate its normal operation
as per respective standards.
3. CENTRALISED MONITORING
3.1 Control Centre shall have centralized supervision and monitoring system by integrating its
Network Management/Monitoring System (NMS) with NMS of other users within its jurisdiction.
Users shall provide necessary support to interface their NMS. However, these users shall take
necessary action for O&M of their respective interfaces.
3.2 NMS shall have features to store necessary information and facility to generate report on
communication system availability of major equipment as well as the data channels on
daily/weekly/monthly basis.
3.3 NMS shall have displays for audio/visual alarm generation and logging facility to facilitate the
operator for quick fault detection. NMS shall facilitate access to the equipment for configuration and
fault restoration as well to facilitate monitoring the performance of the communication system.
6
Technical Standards for Communication System in Power System Operation
4. DATA RETENTION
User shall keep evidence of compliance on availability for the previous two calendar years plus the
current year for all the interfaces which are in operation. Historical data of 90 days shall also be kept.
7
Technical Standards for Communication System in Power System Operation
SCHEDULE-II
(see regulation 5(2))
2. FUNCTIONAL REQUIRMENT
2.1 The wideband network shall be designed in a manner to ensure absolute channel delay less
than 25 ms and channel delay asymmetry less than 0.1 ms required for protection applications.
2.2 Network shall be configured for automatic switchover to the alternate path/route in case of
failure of one path and the switching time delay shall be less than 50 ms.
2.3 Terminal Equipment shall support automatic switchover function between the redundant
modules. All required modules and hardware to support the automatic switch over shall be provided.
2.4 The new node, when added to the existing network, the terminal equipment shall be
compatible to the existing one and shall be possible to integrate with the existing respective NMS
either at State level or at Central level for complete monitoring, reconfiguration and control.
2.5 Terminal equipment shall be designed with required number of directions considering the
route redundancy required and future expansion.
2.6 The communication interfaces for wideband network shall be:
(a) High speed bundled n x E1 support including Ethernet, GbE (Gigabit Ethernet)
(b) High speed E1 channel support
(c) 64kbps & n x 64 kbps data & Protection channel support
(d) Low speed (300 -1200 bps) data channel support
(e) Voice (2 wires, 4 wires) channel support.
(f) Data transport supporting Network Management channels
(g) C37.94 Interface card for tele protection of lines
8
Technical Standards for Communication System in Power System Operation
SCHEDULE-III
(see regulation 20)
1. GENERAL REQUIREMENT
1.1 All wideband communications shall be established using fibre optic communication
consisting of underground fibre optic cable, OPGW (Optical Ground Wire) and ADSS (All Dielectric
Self Supporting).
1.2 Unarmoured cable shall be laid within a PVC/ Hume duct pipe. The cable shall be rodent and
termite proof.
1.3 The cable shall contain 12/24/48 nos. Dual Window Single Mode (DWSM) or Dual Window
Multi Mode (DWMM) fibre depending on the local network design and requirement envisaged and
shall consider the overall design and requirement of the backbone network.
1.4 Approach cable for OPGW termination to FODP (Fibre Optic Distribution Panel) shall be
armoured/unarmored cable with suitable protection and matching the fiber count equal to OPGW
cable to maintain uniformity and ease of utilization of fibers.
1.5 The overall optical fibre path attenuation shall not be more than calculated below:
a) Maximum attenuation @ 1550nm: 0.21 dB/km x total km + 0.05 dB/splice x no. of
splices + 0.5 dB/connector x no. of connectors.
b) Maximum attenuation @ 1310nm: 0.35dB/km x total km + 0.05 dB/splice x no. of
splices + 0.5 dB/connector x no. of connectors.
Induced attenuation due to temperature shall be < 0.05dB (-60O C to +85O C). Attenuation of the
fibre shall be distributed uniformly throughout its length such that there are no point discontinuities
in excess of 0.10 dB.
1.6 Fibre optic cable shall be protected from damage due to factors like crushing, bending,
twisting, tensile stress and moisture, wide temperature variation, Hydrogen evolution, etc.
1.7 Short circuit current for OPGW shall be ≥ 6.32 kA for 1.0 second (for 220kV and above lines)
and ≥ 5.60 kA for 1.0 second (for 132kV and 66kV lines). D.C. resistance at 20O C shall be < 1.0
ohm/km.
1.8 EDT (Everyday Tension) of OPGW shall be < 20% of UTS (Ultimate Tensile Strength).
1.9 Maximum permissible dynamic strain shall be +/- 150 micro strains.
1.10 Proof Stress Level shall be > 0.69 Gpa.
1.11 Maximum chromatic dispersion shall be 18ps/(nm x km) @ 1550 nm, 3.5 ps/(nm x km) @
1288-1339, 5.3 ps/(nm x km) @ 1271-1360 nm.
1.12 Zero dispersion wavelength shall be 1300 to 1324 nm.
1.13 Maximum zero dispersion slope shall be 0.092 ps/(nm²xkm) maximum.
1.14 Cable cut-off wavelength (λcc) shall be < 1260 nm.
1.15 Bend Performance shall be:
9
Technical Standards for Communication System in Power System Operation
@ 1310 nm (75±2 mm dia Mandrel), 100 turns: Attenuation Rise < 0.05 dB
@1550 nm (30±1 mm radius Mandrel), 100 turns; Attenuation Rise < 0.05 dB
@ 1550 nm (32±0.5 mm dia Mandrel), 1 turn; Attenuation Rise < 0.50 dB
1.16 Polarization mode dispersion coefficient shall be < 0.2 ps/km½
10
Technical Standards for Communication System in Power System Operation
3. FUNCTIONAL REQUIREMENT
3.1 Splice enclosures shall be provided to encase the optical cable splices in protective, moisture
and dust free environment. Splice enclosures shall comply ingress protection class IP 66 or better.
3.2 Maximum 12 fibres shall be terminated in a single splice tray.
3.3 FODP (Fibre Optic Distribution Panel) shall be of corrosion resistant, robust construction and
shall allow both top or bottom entry for access to the splice trays. Ground lugs shall be provided.
FODP shall meet ingress protection class IP55 specifications.
11
Technical Standards for Communication System in Power System Operation
SCHEDULE-IV
(see regulation 20)
1. GENERAL REQUIREMENT
1.1 PLCC shall be used in the grid network between two consecutive substations and PLCC
shall provide Speech, Data and Tele-protection requirements of the Power system.
1.2 PLCC shall be duplex, independent TX and RX channels, operating in the carrier frequency
spectrum 40 to 500 kHz.
1.3 PLCC terminal could be operated in APLC (Analogue), DPLC (Digital) or Mixed mode.
1.4 PLCC shall be suitable for use with the outdoor equipment viz. line traps, CVT, coupling
device, HF cable
1.5 Input circuit of the PLCC terminal shall be provided with protective device to eliminate any
surge transfer.
1.6 Companders and expanders shall be provided to improve voice transmission characteristics
for the system.
1.7 Fail safe devices shall be provided to avoid a malfunction in one unit or damage of any sub-
assembly.
1.9 PLCC set shall be designed to give guaranteed performance from 0 to 500C. Thermal
capability of the equipment shall be so designed to be operational up to 550C for 24 hours
continuously.
12
Technical Standards for Communication System in Power System Operation
3. FUNCTIONAL REQUIREMENT
3.1 Coupling device (Line matching unit and protective devices) shall be interposed between the
CVT and the connection line (co-axial cable) to the PLCC terminals and shall conform to the following
carrier frequency operating characteristics between phase to earth coupling units:
Nominal impedance 150 (for balanced secondary circuit)
1) Ω
(equipment side) 75 (for unbalanced secondary circuit)
2) Maximum composite loss dB 2
Return Loss dB Equal to or greater than 12 dB
3) Transmission band kHz 40 to 500
3.2 The coupling device shall be suitable for outdoor mounting and shall be fitted on the steel
structure. Temperature of metallic equipment mounted outdoor is expected to rise up to 650C with
ambient temperature of 500C.
3.3 High frequency cable shall be provided to connect coupling unit installed in the switchyard to
the PLCC terminals installed indoors, and values of attenuation per km of the cable shall be as follows:
Frequency (kHz) Attenuation (dB/km)
10 0.8
60 1.4
300 3.3
500 4.7
3.4 The nominal bandwidth for transmitting or receiving shall be programmable from 4 to 8 kHz
in steps of 4 kHz. PLCC terminal at bandwidth of 4 kHz shall be suitable for following configuration:
Speech + 4 x 1200 Baud Data (minimum)
Data rates shall be selectable in steps, compliant with commonly used standardized data
rates such as 200, 300, 600 and 1200 Bauds; and for digital PLCC 1200, 2400, 4800 and
9600 Bauds.
13
Technical Standards for Communication System in Power System Operation
14
Technical Standards for Communication System in Power System Operation
SCHEDULE-V
(see regulation 20)
1. GENERAL REQUIREMENT
1.1 Cellular communication shall be used below 132kV / 110kV system for low speed data
acquisition system, where feasibility of access to wideband network is not possible.
1.2 Cellular communication shall be adopted after ensuring the available signal level up to the
required strength and dual or more SIM with different service provider with automatic changeover to
ensure 99.5 % link availability for interruption free operation of the communication system.
1.3 Design shall be for satisfactory and continuous operation in open environment with operating
temperature range of -10 deg. C to 55 deg. C and humidity up to 95% noncondensing.
3. FUNCTIONAL REQUIREMENT
3.1 Field interface shall be optical port / RS 232 / RS 485 / RJ 45 IP/ any other suitable port.
3.2 Receiving device shall support IEC - 60870 -5- 101 & IEC - 60870 -5-104 protocol & DLMS
(IS15959/IEC 62056), MODBUS for interfacing.
3.3 Receiving end shall have multi WAN VPN concentrator with built in facility to manage at least
250 remote nodes for a fixed IP provided.
3.4 Receiving end shall have redundant Multi WAN VPN Concentrator with a fail over – fall back
feature for uninterrupted data communication.
3.5 Router shall be capable of handling VPN based security by assuming a fixed IP issued by
the Multi-AN VPN Concentrator at the SCADA end.
15
Technical Standards for Communication System in Power System Operation
3.6 Device shall have the capability of data encryption with 3DES to ensure secured
communication network over GPRS (3G/4G), Broadband or latest.
3.7 Device shall have capability to decide and act according to the best available link in
redundant mode configuration with automatic switchover.
3.8 QoS (Quality of Service) and Bandwidth management for optimal bandwidth usage.
3.9 Centralized Monitoring at Control Centre shall be available.
16
Technical Standards for Communication System in Power System Operation
SCHEDULE-VI
(see regulation 20)
1. GENERAL REQUIREMENT
1.1 VSAT communication shall not be used for primary protection function of power system and
can be used for SCADA control functions of power system equipment as Geo-Stationery Satellite
hop delay is 240 ms.
1.2 VSAT communication shall be preferably used for remote locations.
1.3 VSAT terminal shall be able to work with all geostationary satellites to the extent possible,
visible from India and work efficiently from all parts of India.
1.4 VSAT terminal shall work either on KU or C-band or extended C band or any other band for
interruption free continuous operation in extremely rainy (more than 10mm/hour intensity) and cloudy
conditions.
1.5 VSAT communication shall be adopted after ensuring required level of signal level and link
availability (99.9 percent) for interruption free operation of the communication system. NMS shall
have facility of maintaining link status along with signal strength of the nodes.
1.6 VSAT communication shall not be connected to the National wideband network.
1.7 All regulatory clearance from regulatory bodies shall be taken to operate the VSAT
communication.
1.8 All regulatory guidelines including size of the antenna shall be followed.
1.9 Redundant configuration shall be enabled in NMS.
1.10 Pool Band width feature shall be adopted for the VSAT Network.
3. FUNCTIONAL REQUIREMENT
3.1 Uplink and down link configuration shall be redundant (1 + 1).
3.2 Network shall be designed based on FTDMA / MFTDMA / SCPC DAMA technology or any
other proven future technology with configurable data rate as per data communication requirement.
3.3 Bit error rate shall be lesser than 1 X 10 -7 (data) to 1 X 10 -4 (Voice).
3.4 Shall support Broadcast, Unicast, Multicast, TCP spoofing.
3.5 Shall support IP RJ-45 (IP or E&M).
3.6 Receiving device shall support IEC - 60870 -5-104 protocols for interfacing data as well as
to IPv4, IPv6, RIP v1, v2, ARP/VLAN, ICMP, TCP, UDP, Telnet, IGMP, v1, v2, SNMP for networking
Utilities.
3.7 Shall be designed for 230 V +/- 30% AC power supply at 50 Hz.
17
Technical Standards for Communication System in Power System Operation
3.8 Shall be designed for trouble free operation at temperature range -10 deg. C to 55 deg. C
and humidity up to 95% non-condensing, and wind speed of minimum 80 kmph.
3.9 Shall be able to deliver bidirectional composite data traffic.
3.10 Round trip delay shall be less than 600 ms.
3.11 VSAT IDU (for remote sites) shall support TCP/IP without the need of an external router.
3.12 VSAT terminal shall have separate storage banks for software and firmware, to enable
configuration changes pertaining to either the terminal (firmware) or the overall system architecture
(software), without affecting the other.
3.13 VSAT terminals shall be able to take the software and firmware downloads from the hub over
the air, without any disturbance to the online user traffic while in operation on per terminal (Unicast),
per group (Multicast) or entire network (Broadcast) basis.
18
Technical Standards for Communication System in Power System Operation
SCHEDULE-VII
(see regulation 20)
1. GENERAL REQUIREMENT
1.1 RF communication shall be used below 132kV / 110kV system for low speed data acquisition
system and shall not be used for protection of power system equipment.
1.2 RF communication shall be adopted after ensuring required level of signal level with clear
line of sight and link availability (99.5 percent) for interruption free operation of the communication
system.
1.3 Design shall be for satisfactory and continuous operation in open environment with operating
temperature range of -10 deg. C to 55 deg. C and humidity up to 95% noncondensing.
1.4 RF communication shall not be connected to the National wideband network.
1.5 Utilization of radio spectrum shall be subject to regulatory clearance. All regulatory guidelines
shall be followed.
1.6 RF communication shall be capable of delivering data, voice and video conferencing, and
latency shall be less than 5 msec.
2. FUNCTIONAL REQUIREMENT
2.1 Communication equipment shall comply with IP 65 rating.
2.2 Communication system shall support concurrent use of IP, VoIP and Video.
2.3 Capable of channel bandwidth selection with 5 MHz steps.
2.4 Capable to capture both side (local and remote) spectrum view. Equipment shall have site
and link management facility for configuration.
2.5 Support SNMP, MIB II, Bridge MIB.
2.6 Comply to IPv4 and IPv6 network protocols with backward compatibility feature.
2.7 Facility to upgrade software over the air from remote.
2.8 Gateway device shall have 10BASE-T/100BASE-TX Ethernet port to connect to any network.
2.9 NMS shall be provided to monitor the performance from the Control Centre. NMS shall be
capable to provide bandwidth utilization, latency, link health and signal strength of the network.
2.10 Communication network shall support multiple communication protocols to provide flexibility.
2.11 Provide scalability, interoperability and future proofing.
(P.C. Kureel)
Secretary, Central Electricity Authority
19