0% found this document useful (0 votes)
72 views1 page

C D E F I G H J B A: Project Title-Sheet Title

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views1 page

C D E F I G H J B A: Project Title-Sheet Title

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

V W X Y Z

J I H G F E D C B A
MahadevghatRoad

E1 E1 E1 E3
90 (0,0)ORIGIN
POINT
F1 F1 F2 F3

1 1
F3 E3 E7

2 E3 F3
F7
2

3 3
F2 F3

F2 F3
F3 F3
F4 F4
4 4
E3
E3 E8

F4 E4
6m Wide Road

F8
11 11
5 E10
5
12 12
6 6
F9

F6
23100

F3
E2
E6
7 F2
E3
7
13 13

F3
14 E3 14
F3
F6 F3 F6
E3 F2

8 E2 E6 E3 E6
8
15 15

F3
E3

E5 E5

F5 F5
9 9

27100
Way To Sunder Nagar
J Entry I H G F E D C B A
V W X Y Z 6m Wide Road

Footing Plan Scale-1:50

Footing Schedule For Isolated Footings - Ground Level

S No. Footing Excavation Footing Depth Ground Level

Mark Size Size Reinforcement 75 75 16mmØMain Bars 75 75 16mmØMain Bars


ax b D d
D

1. F1 1200 x 1200 1125x 1175 550 150 12mmØ @ 150mm c/c 8mmØ Longitudinal and Transverse Bars
150 mm P.C.C. Bed (1:4:8) 40mm Bolders d
8mmØ Longitudinal and Transverse Bars
150 mm P.C.C. Bed (1:4:8) 40mm Bolders

2. F2 1200 x 1200 1125x 1175 550 150 12mmØ @ 150mm c/c Sand Filling 8mmØ Longitudinal and Transverse Bars Section of Footing (Lift) 8mmØ Longitudinal and Transverse Bars
Section of Footing (Isolated Footing) Reinforcement Details Scale-1:5 Sand Filling
Reinforcement Details Scale-1:5
3. F3 1200 x 1500 1125 x 1350 550 150 12mmØ @ 150mm c/c
4. F4 1200 x 1200 1125x 1175 550 150 12mmØ @ 150mm c/c
5. F5 1500 x 1800 1350 x 1650 550 150 12mmØ @ 150mm c/c
Ground Level

Strap Beam 230 x 300


Strap Beam 230 x 300
75 75 16mmØMain Bars
75 75 16mmØMain Bars

Footing Schedule For Combined Footings -


75

8mmØ Stirups
8mmØ Stirups
8mmØ Longitudinal and Transverse Bars
8mmØ Longitudinal and Transverse Bars 150 mm P.C.C. Bed (1:4:8) 40mm Bolders
150 mm P.C.C. Bed (1:4:8) 40mm Bolders
S No. Footing Excavation size Footing Size Depth 8mmØ Longitudinal and Transverse Bars
8mmØ Longitudinal and Transverse Bars

Reinforcement Section of Footing Section of Footing Sand Filling


Mark (Combined Straped Footing)
Sand Filling
(Combined Strapped Footing)
ax b D d Reinforcement Details Scale-1:5 Reinforcement Details Scale-1:5

1. F6 1500 x 2300 1350x 2150 550 150 12mmØ @ 150mm c/c


2. F7 1200 x 2700 1125x 2550 550 150 12mmØ @ 150mm c/c
3. F8 Width-1200 1125 x 2550 550 150 12mmØ @ 150mm c/c
1350 1800
Excavation
Excavation
P.C.C. Footing

P.C.C. Footing 75 75
50 mm Shuttering space

Footing Schedule For Footing of lift -


1350
1125

Column 50 mm Shuttering space

1. F10 2400 x 2700 2150 x 2250 550 150 12mmØ @ 150mm c/c Column

Plan Of Isolated Footing Plan Of Strapped Footing


scale 1:5 scale 1:5

Notes Specifications- Submitted By- Scale- Orientation Remarks


Project Title- Sheet Title- Sheet No.
.All dimensions are in mm.
.All dimensions are to be read, not to be
scaled.

Office cum Residential


Building
.This drawing is copyright of Mithlesh Sinha
and can't be reproduced without permission. Footing Plan Mithlesh Sinha
6th Sem. B.Arch 05