Control System and Solutions - Global Case Study Collection - JIV1901 PDF
Control System and Solutions - Global Case Study Collection - JIV1901 PDF
$
INDEX
A wide variety of
COMPOUND BUILDING OFFICE
suitable systems PROJECT1-4 PROJECT5-10
SCHOOL HOTEL/RESTAURANT
RESTAURANT RESIDENCE
PROJECT11-16 PROJECT17-20 PROJECT21-23
PAGE 13-14 Colombia / Singapore / India PAGE 15-17 Brazil / Germany / India / USA PAGE 18-19 Indonesia / Brazil / Australia
WAGO
RESIDENCE ! Router
VRV
Control from
HOTEL/ anywhere SVM Schedule
RESTAURANT Series Smart Control SVM Series iTM
BACnet®
interface
Model Key Feature
VRV interface
SVMPC1 Total facility management by smartphone for use in BACnet®
Card SVMPC1T Control by dedicated touch screen
key
! SVMPC2 Option for iTM to add smartphone accessibility
DCM601A51 DMS502B51
LESS SVMPR1/2 Smartphone control for residence (AC only)
Maintenance SVMPH1 Smart home system • Air-conditioning control Seamless connection between
OFFICE SVMPS2/3 Hotel guest room controller • Lighting control (DALI-compatible) VRV system and BACnet®open
tablet and PC
2 3
COMPOUND BUILDING
PROJECT1
1 Holanda's Prime
PROJECT
iTM
SVM, PPD
Project Outline
Holanda’s Prime is an innovative building that embodies practicality, sustainability, nature, and well-being. Sophisticated and for mixed use,
the building is designed to offer the best in comfort along with energy saving, state-of-the-art technologies to the 176 apartments and
27 high-end stores. The building is inspired by the largest cities around the world without forgetting the tranquility of being just 100
meters from the sea. The initial solution proposed was to use individual split systems. However, joint efforts and strong partnership
between Daikin McQuay Brazil Recife Branch and the installer DPI enabled to completely revise the air conditioning and automation
project to a one based on the VRV system.
Location: João Pessoa, state of Paraíba, Brazil
Number of floors: 10
Total floor space: 2,500m²
System overview
VRV
Construction: 2016 Smartphone
F1F2(OUT) Indoor unit
Daikin's Solution
Use Power Proportional Distribution(PPD) software to gather the actual power use of each user in csv data format, and SVM to automatically
generate electricity bills from that data. Centrally control time scheduling, setpoint and individual remote controller restriction by using
iTM, to which end users and maintenance company can easily access via SVM to control air conditioning from their smartphones.
All these functions facilitate the maintenance company’s everyday work while offering a comfortable environment to the end users.
4 5
COMPOUND BUILDING
PROJECT2-4
OFFICE
PROJECT5
PROJECT
iTM, PPD
iTM SVM
SVM, PPD WAGO
Project Outline
An office building with European architecture located near Westlake in Hanoi, which is a very nice place
surrounded by famous hotels. From the 1st to the 7th floor is an office building, and the 8th and 9th Project Outline
floors are Penthouses. China Steel Corporation was established in
Location: Hanoi, Vietnam Number of floors: 9 Daikin Systems Installed 1971 and has the largest steelmaking plant in
Total floor space: 2,210m² Construction: 2018 [ Air conditioning systems ] Taiwan. The group comprises 25 subsidiaries,
ODU: VRV IV 166HP, 22 units and China Steel Machinery Corporation (CSMC)
IDU: Duct type, 44 units is one of them. All of its key directors and
Owner's Requirements
Daikin air cooled water chilling unit, 2 units supervisors work in this building, just like the
• To monitor entire building by smartphone FCU, 13 units brain and heart of CSMC.
• To generate electricity bill according to the actual use [ Control systems ]
iTM: 1 unit Location: Kaohsiung, Taiwan
iTM plus adaptor: 3 units Number of floors: 6 floors
Daikin's Solution SVMPC1: 1 unit (1 basement floor)
Use iTM to control the VRV indoor units, and SMVPC1 Power Proportional Distribution (PPD) Total floor space: 7649m²
to control and monitor the building by smartphone software: DCM002A51
as well as to generate electricity bills according to the SVMPC1 connection software: DCM007A51
actual use. BACnet® connection software: DCM009A51
3 Exatron
PROJECT
iTM
SVM
Project Outline
Exatron is an innovative company focused on developing the highest quality electro-electronic
products and promoting energy saving and safety.
Location: Canoas city (RS), Brazil Number of floors: 1 factory floor and 4 administrative floors
Total floor space: 11,000m² Construction: 2018
Owner's Requirements Daikin Systems Installed
Daikin Systems Installed
• To remotely monitor and control the building by smartphone
System overview
VRV
[ Air conditioning systems ]
• Easy commissioning, automation, and future retro-commissioning ODU: VRV 278HP, 14 units [ Air conditioning systems ] Indoor unit
of the HVAC system IDU: Duct and Cassette type, ODU: VRV IV 316HP, 23 units 6F
• To make interlocks in the automation system in order to obtain and 44 units
IDU: Round flow cassette type, 159 units
guarantee energy efficiency HRV: 2 units
DX-AHU: 30TR, 3 units Duct type, 4 units
Daikin's Solution 25TR ,1 unit SVMPR2
[ Control systems ] kWh meter 5F
Use iTM and SVM to remotely control as well as monitor and manage the (All electricity)
HVAC system of each environment. Use programs to set temperature [ Control systems ] iTM: 1 unit
restrictions, operating hours, interlocks, and log generation. These systems iTM: 1 unit SVMPR2: 1 unit
allowed the consultant Engemestra to fulfill their client’s requirements SVMPC2: 1 unit Power Proportional Distribution (PPD) PC 4F
kWh meter
while facilitating the work of the installer Klift Serviços de Climatização. Central remote controller: 1 unit software Router (2F PPD)
4
WAGO
F1F2 3F
Piramal Healthcare
PROJECT
iTM Smartphone
Construction: 2015 Round flow cassette type, 411 units each department in real-time
6 7
OFFICE
PROJECT6
iTM
WAGO, DALI
The two major factors of power consumption
in an office building are generally air
conditioning and lighting.
System overview
BACnet® controller +
DALI module +
EnOcean module
DC24V Power DC18V Power
supply unit supply unit
What is Air Conditioning Network Service System ? What can iTM and DALI do ?
Preventive Maintenance Case1
Project Outline Daikin Systems Installed The intelligent Touch Manager can be connected to Daikin’ s own Air Conditioning Switch-on / switch-off and illuminance are controlled based
Network Service System to remotely monitor and verify the operation status of VRV on a schedule to cut wasteful power consumption.
Anabuki Central Building is an office building owned by Anabuki [ Air conditioning systems ] systems. Due to its ability to predict malfunctions, this service provides customers
Kosan, the core company of the Anabuki Group. Anabuki Group with additional peace of mind.
ODU: VRV X 212HP, 26 units
conducts business under its corporate philosophy: Contribute to IDU: Cassette type, 105 units Enhanced convenience with link to the Air Conditioning Network
the creation of culture and history in the local society through Outdoor air processing unit, 9 units Service System
housing and value-creating real estate business. When replacing The intelligent Touch Manager connects seamlessly to Daikin’s 24-hour Air Conditioning
the air conditioning system, other equipment were replaced to [ Control systems ] Network Service System.
iTM, WAGO, DALI, BACnet® interface Air Conditioning Network Service System*
raise the energy efficiency of the whole building to realize ZEB ACC centre
• Optimal illuminance reduces • Prevents failure
Trouble energy consumption. to turn off the lights.
(Zero Energy Building). Personnel at the centre monitor the
Case2
occurrence of malfunctions and track
their cause via the Internet.
Location: Takamatsu, Japan Occupancy sensors are used to eliminate both wasteful lighting
Owner's Requirements Advance malfunction warnings help prevent
and air conditioning. When a room is unoccupied, the air
Number of floors: 9 the sudden occurrence of problems later.
conditioning is stopped, and the lighting switched off.
Total floor space: 4969.19m² To reduce service maintenance, which has been increasing due to Even malfunctions difficult to identify
can be monitored remotely.
Repair OFF
Construction: 1984 Replacement: 2018 malfunctions or bad condition of the air conditioning system. Enable prompt repairs as
OFF
Allows dispatching of
service engineers without service engineers know the
Daikin's Solution a call from customers. cause of the problem
beforehand.
Daikin checked the power usage of HVAC and the entire building, and proposed to replace the air conditioning equipment and improve the layout of
the units. To make the building more energy efficient and ZEB-conscious, Daikin proposed to replace the lighting with LED because it dissipates less Remote monitoring by Air Conditioning Network Ser vice System
can not only prevent troubles such as emergenc y stop and repair,
heat, consumes less power, and its illumance can be controlled by using iTM and DALI (dimming function). Another proposal by Daikin was the renovation but also lead to less maintenance overall.
of the building structure to improve the heat insulation performance. As a result, the building now requires 40% less air conditioning capacity.
*Because of restrictions in applicable areas and release times, please consult a Daikin representative separately for details.
8 9
OFFICE
PROJECT7-9
PROJECT
Bank of China
iTM, SVM iTM
Tablet control SVM, WAGO
Project Outline
Singapore Chinese Culture Centre (SCCC) collaborates with
arts and cultural groups and community partners to promote
and develop local Chinese culture. Opened by the third Prime
Minister of Singapore, Lee Hsien Loong, on 19 May 2017,
the centre is designed for exhibitions, fairs, performances,
seminars, talks, workshops, and other cultural activities.
Location: Singapore Number of floors: 16
Total floor space: 40,000m² Construction: 2017
Daikin Systems Installed
[ Air conditioning systems ]
ODU: 10HP, 1 unit IDU: Cassette type, 5 units
Daikin chilled water fan coil unit: 60HP, 10 units
Project Outline [ Control systems ] iTM: 1 unit, SVMPC1, WAGO
Established in 1936 and including 13 sub-branches and 10 Owner's Requirements
selfservice banking outlets, Bank of China Singapore Branch
manages and operates several regional business centres. • To replace the existing subscription-based BMS from ABB
• To use smartphone as a remote controller
Location: Singapore
Number of floors: 18 (old wing) , 36 (new wing) Daikin's Solution
Construction: 1954 (old wing), 2000 (new wing) Replace the existing BMS with Daikin’s system which enables
Daikin Systems Installed chilled water FCU and VRV control by smartphone. The solution
uses a combination of iTM + SVMPC1 + WAGO: WAGO touch
[ Air conditioning systems ]
VRV system panel accessible from iTM via BACnet® to control the FCU
and SVMPC1 to implement control by smartphone.
[ Control systems ]
iTM: 2 units
SVMPC1: 1 unit
9
SVMPC1T: 47 units
PROJECT
Owner's Requirements iTM
• To monitor equipment at each floor
WAGO, DALI
• To use smartphone as a remote controller and
iTM as master control Daikin Systems Installed
Daikin's Solution Project Outline [ Air conditioning systems ]
Use iTM + SVMPC1 to centrally manage the air conditioning VRV system
WAGO Japan Hyogo Service Centre is located
for the entire building and SVMPC1T to individually manage in the northern part of Himeji City, in a place [ Control systems ]
the operation for each floor. Since automatic control settings surrounded by rich nature. iTM: 1 unit, WAGO, DALI
such as schedules can be independently set for each floor,
floor-specific air conditioning management can be performed Location: Himeji, Japan
Number of floors: 5 Owner's Requirements
independently in each floor. For the whole building, two
iTMs are integrated with SVMPC1 so that they can be managed Total floor space: 5243.8m² • To control lighting in conjunction with air conditioning
as one system. Construction: 2007 • To implement demand control
Daikin's Solution
System overview • Implement lighting control (ON/OFF, dimming) in
18F 36F conjunction with air conditioning by connecting
SVMPC1 WAGO and DALI to iTM.
SVMPC1T SVMPC1T • Use iTM to implement demand control.
12F 21F (Available only in Japan)
SVMPC1T SVMPC1T
8F 10F
iTM iTM
SVMPC1T SVMPC1T
10 11
11
OFFICE
PROJECT10
SCHOOL
PROJECT11
10 Chippewa Valley Electric Cooperative Cornell 11 Autonomous University of the West (UAO)
PROJECT
PROJECT
iTM iTM
WAGO
12 13
SCHOOL
PROJECT12-16
HOTEL / RESTAURANT
PROJECT17
PROJECT
iTM, SVM
Tanglin Trust School
iTM
SVM, MSM MSM, PPD
13
Multi Site Management (MSM)
by MSM to enable management by smartphone.
PROJECT
14
control, scheduling and remote limitation.
The resort Vila Galé Touros is the new option of the Portuguese Vila Galé group. Near 80 km from the capital of Rio Grande do Norte, Brazil, the
PROJECT
15
Central remote controller: 1 unit power used by each block and contribute to energy saving management.
PROJECT
16
A2
PROJECT
Gurukul School
SVMPC1
SVM B2
14 15
HOTEL / RESTAURANT
PROJECT18-20
PROJECT
PROJECT
Project Outline
Courtyard by Marriott Bhopal is a 5-star business
hotel with 160 spacious rooms and ultra-modern
amenities. The hotel provides the perfect blend
of comfort and functionality.
Location: Bhopal, India
Number of floors: 6
Construction: 2012
PROJECT
iTM
BACnet® interface
16 17
RESIDENCE
PROJECT21-23
PROJECT
SVM
SVM MSM
Owner's Requirements
23
PROJECT
• To be able to turn on AC before coming back home to make indoor comfortable. Australia Nursing home in Perth iTM, WAGO
• To never worry about forgetting to turn off the AC when the house is unoccupied or at night-time.
• To reduce power consumption, automatically turn off AC in rooms other than the bedrooms during sleeping hours.
Project Outline Daikin Systems Installed
Daikin's Solution Location: Perth, Australia [ Air conditioning systems ] [ Control systems ]
With SVMPH1, residents can control and monitor AC anytime, anywhere with their smartphone. So that the rooms are comfortable when they come back home. Number of floors: 2 ODU: VRV IV, 40 units iTM: 1 unit
With the schedule function, they no longer need to worry about forgetting to turn off the AC. Even if they forget, they can turn it off from outside. Construction: 2018 IDU: Duct type, 221 units WAGO: 120 points
18 19
CONTROL SYSTEM & SOLUTIONS
Solution movies
Our movies show you so much more!
OK! For
Check it out! OFFICE and HOTEL
Dealer
Specifications, designs and other content appearing in this brochure are current as of March 2020 but subject to change without notice.
JIV1901