0% found this document useful (0 votes)
82 views3 pages

Non-Conformity Report: South Asia

1) The document is a non-conformity report regarding underground power cable work at Alibaug Town in Maharashtra, India. 2) It notes that the contractor, Leena Power Tech Engineer PVT .Ltd, failed to properly seal and cap underground cables with plastic half glass at Sai Nagar and did not do proper dressing of the cables. 3) Proper sealing and dressing of underground cables is required by the quality assurance plan and drawings to maintain cable integrity during construction and prevent water ingress.

Uploaded by

Kuldeep Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views3 pages

Non-Conformity Report: South Asia

1) The document is a non-conformity report regarding underground power cable work at Alibaug Town in Maharashtra, India. 2) It notes that the contractor, Leena Power Tech Engineer PVT .Ltd, failed to properly seal and cap underground cables with plastic half glass at Sai Nagar and did not do proper dressing of the cables. 3) Proper sealing and dressing of underground cables is required by the quality assurance plan and drawings to maintain cable integrity during construction and prevent water ingress.

Uploaded by

Kuldeep Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

South Asia

NCR No.: TSSA / ELECTRICAL / ALIBAG /----059--- Date : 09/10/2020

Name of Work Conversion of Existing 22KV and LT Power Distribution Network with
Underground Power Cable Network and Construction of 22 KV Switching
Station at Alibaug Town on Turnkey Basis Under NCRMP-II Maharashtra.
Client National Cyclone Risk Mitigation Project NCRMP-II

Contractor Leena Power Tech Engineer PVT .Ltd

Inspection Location Sai Nagar Alibag Date:


09/10/2020

Non-Conformity Report
Type of Non-Conformity:
1- Contractor have not sealed with capping by plastic half glass at Sai Nagar and not done proper
dressing.

Kuldeep Kumar
Senior Electrical Engineer
Contractor Client TUV SUD
Date : Date : Date :09/10/2020

Requirement as per Approved QAP /Drawing :


1 - Contractor should be seal with capping by plastic half glass at Sai Nagar and proper dressing.
2-As per agreement the sealing and resealing of cables after pulling is required to maintain cable
integrity during construction, ultimately preventing water ingress.

Senior Electrical Engineer


Contractor Client TUV SUD
Date : Date : Date :09/10/2020
Action Taken by Contractor:

Kuldeep Kumar
Senior Electrical Engineer
Contractor Client TUV SUD
Date : Date : Date :
Photo of NCR

LT UG Cable have not sealed and proper dressing


Photo of NCR

LT UG Cable have not sealed and proper dressing

TUV SUD / NCRMP NCR / 001 Ver 0.0 /dt. 10-01-2020