Design Summary: For Construction of ONE (1) - STOREY R.C. EMERGENCY BUILDING at DRSTMH Compound, Kalibo, Aklan

This document provides a design summary for the construction of a one-storey emergency building. It specifies design stresses and load assumptions. It outlines the reinforcement details for various structural elements including the roof deck, main beams, secondary beams, tertiary beams, lintels, columns, tie beams, and isolated column footings. Reinforcement includes rebar sizes, spacing, cover, and development lengths.

Uploaded by

Anton_Young_1962
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
135 views2 pages

Design Summary: For Construction of ONE (1) - STOREY R.C. EMERGENCY BUILDING at DRSTMH Compound, Kalibo, Aklan

This document provides a design summary for the construction of a one-storey emergency building. It specifies design stresses and load assumptions. It outlines the reinforcement details for various structural elements including the roof deck, main beams, secondary beams, tertiary beams, lintels, columns, tie beams, and isolated column footings. Reinforcement includes rebar sizes, spacing, cover, and development lengths.

Uploaded by

Anton_Young_1962
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 2

DESIGN SUMMARY

for
Construction of ONE (1) – STOREY R.C. EMERGENCY BUILDING
@ DRSTMH Compound, Kalibo, Aklan

Design Stresses:
fc’ =20.7 MPa for concrete
fy = 276 MPa for 16mm φ & larger rebars
fy = 228 MPa for smaller than 16 mm φ rebars

Dead Loads:
Unit Weight of Concrete 24kN/m3
Ceiling Finishes 0.15kPa
MEP 0.10kPa
Extra Movable Loads 1.00kPa

Live Loads:
Corridors above ground floor 3.8kPa

1. ROOF DECK

 2-WAY SLAB: Thickness = 125mm


Rebars: Use 12 mm φ, S = 150mm

 MAIN BEAM : 300 mm x 600 mm, Span L = 7600mm/7000mm


Rebars @ Support
use 8-20 mm φ top bars
use 5-20 mm φ bottom bars
Rebars @ Midspan
use 5-20 mm φ top bars
use 8-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 7600mm Span stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.
For L = 7000mm Span stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.

 SECONDARY BEAMS : 250 mm x 450 mm, Span L = 4500m/1000m


Rebars @ Support
use 4-20 mm φ top bars
use 2-20 mm φ bottom bars
Rebars @ Midspan
use 2-20 mm φ top bars
use 4-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 4500mm Span stirrups spaced: 3 @ 50mm, 5 @ 100mm, 7 @ 150mm, rest @ 200mm O.C.
For L = 1000mm Span stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

 TERIARY BEAMS : 200 mm x 450 mm, Span L = 3800m/3500m


Rebars @ Support
use 4-20 mm φ top bars
use 2-20 mm φ bottom bars
Rebars @ Midspan

October 30, 2020 1


use 2-20 mm φ top bars
use 4-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 3800m Span stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.
For L = 3500m Span stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

 LINTEL BEAMS : 150 mm x 300 mm


Rebars
use 2-16 mm φ top bars
use 2-16 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
Spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

2. MAIN COLUMN : 400 mm x 600 mm concrete section


use 12-20 mm φ bars
use 10 mm φ lateral ties
spacing of 50mm O.C. @ Core; 150 mm O.C. @ middle 3rd of Col. Ht., & the rest @ 100mm O.C.

LINTEL COLUMN : 150 mm x 400 mm concrete section


use 6-16 mm φ bars
use 10 mm φ lateral ties
spacing of 50mm O.C. @ Core; 150 mm O.C. @ middle 3rd of Col. Ht., & the rest @ 100mm O.C.

3. TIE BEAMS : 250 mm x 450 mm, Span L = 7600mm/7000mm/4500m


Rebars
use 4-20 mm φ top bars
use 4-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 7600mm Span stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.
For L = 7000mm Span stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C
For L = 4500mm Span stirrups spaced: 3 @ 50mm, 5 @ 100mm, 7 @ 150mm, rest @ 200mm O.C..
Note: Location of the underside of beam is 1000mm below the N.G.L.

4. ISOLATED CONCRETE FOOTING OF MAIN COLUMN (ASB = 75 kPa)


Thickness = 400mm
Width = 2000 mm
Length = 2000 mm
Top Matting Rebars = 12-16 mm φ rebars o.c.b.w.
Bottom Matting Rebars = 12-20 mm φ rebars o.c.b.w.

October 30, 2020 2