Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects
LIVESTOCK ANIMAL INDUSTRY PROJECTS
I.2. PROJECT COMPONENTS
Maximum Stock Production (per growing season): FIFTY ONE THOUSAND FIVE HUNDRED (51,500)
Area
No. of
Facilities (sq./M)/ Specification/Description
Units
Capacity
Cages / Pens / Enclosures
6
1. Gestating/Nursery Compartment
/ Hatchery
2. Support Facilities (e.g. feeders,
generators, admin building,
workers’ quarter, etc.)
3. Storage facility
4. Water source / supply
5. Waste water management
Facility
6. Solid waste management facility
7. Drainage system
8. Others (please specify):
Use additional sheets, if necessary
I.3. UTILITIES/REQUIREMENTS (Operation Phase):
Estimated
Demand/ Projected Amount from
Utilities Source Breakdown
Consumption Source specified
(Total)
Grid KWh
Power/Electricity
KWh
Project Name: ____________________________________________________
Page 1 of 3
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects
Generator Set KWh
Others, please specify: KWh
Local Water Utility Provider m3/day
Well in: (specify location): m3/day
Spring in: (specify location): m3/day
Water
m3/day
River, Lake or other surface water : m3/day
(specify name & location)
Others, please specify: m3/day
Energy/Water Efficiency Measures (if any)
Proposed Efficiency/Conservation Estimated Savings for Estimated Total
Utilities
Measures each Measure Savings
Power/ Electricity KWh KWh
KWh
Water Rainwater collection system with total m3/day m3/day
capacity of
Project Name: ____________________________________________________
Page 2 of 3
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects
Others, please specify: m3/day
I.4. MANPOWER AND TIMELINES OF PROJECT PHASES
Proposed Start of Construction
Proposed Start of Commissioning
Proposed Start of Commercial Operation
Total Requirement
Phase Expertise/Skills Requirement per Expertise/Skill
per project phase
a. Construction
b. Operation
I.5. INDICATIVE PROJECT COST (Initial Investment)
PhP ______ ____ US $ ________ _____ (specify if with foreign investment)
Project Name: ____________________________________________________
Page 3 of 3