Load Calculation: Project
Load Calculation: Project
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Load calculation
Structural Data:
Launder load and moment are applied at the respective elevation. (However effect of liquid has been
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Structural Data:
Cover(water face) = 40 mm
Cover(Earth face ) = 50 mm
STAAD Results:
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Rebar diameter = 10 mm 0
Cover = 40 mm
Ast Required =
(IF(230>500,250,230/2))
(1000/200*0.7854*10*10) +(1000/200*0.7854*0.0001*0.0001)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(185-(39.33/3))
Steel Stress, 'fs' = 133.01 N/mm2
(((8.978*10^6)/171.89)/392.7)
Concrete stress 'fc' = 2.66 N/mm2
(2*8.978*10^6)/(1000*39.33*171.89)
Distance 'a' = 230 mm
Strain Es in steel for the stress of = 0.00066505 mm
(133.01/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(((230-39.33)/(185-39.33))*0.00066505)
Strain due to stiffening effect of concrete ε
2
Crack Width
Rebar diameter = 10 mm 0
Cover = 50 mm
Ast Required =
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(IF(230>500,250,230/2))
(1000/200*0.7854*10*10) +(1000/200*0.7854*0.0001*0.0001)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(175-(38.124/3))
Steel Stress, 'fs' = 81.29 N/mm2
(((5.181*10^6)/162.29)/392.7)
Concrete stress 'fc' = 1.67 N/mm2
(2*5.181*10^6)/(1000*38.124*162.29)
Distance 'a' = 230 mm
(81.29/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0005698 mm
(((230-38.124)/(175-38.124))*0.00040645)
Strain due to stiffening effect of concrete ε
2
Crack Width
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Rebar diameter = 10 mm 0
Cover = 40 mm
Ast Required =
(IF(230>500,250,230/2))
29 + 11
Ast Provided = 393 mm2
(1000/200*0.7854*10*10) +(1000/200*0.7854*0*0)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(185-(39.33/3))
Steel Stress, 'fs' = 22.64 N/mm2
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(((1.528*10^6)/171.89)/392.7)
(2*1.528*10^6)/(1000*39.33*171.89)
Distance 'a' = 230 mm
Strain Es in steel for the stress of = 0.00011320 mm
(22.64/200000)
(((230-39.33)/(185-39.33))*0.0001132)
Strain due to stiffening effect of concrete ε
2
Crack Width
(100*392.70000003927/1000/185)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Rebar diameter = 10 mm 0
Cover = 50 mm
Ast Required =
(IF(230>500,250,230/2))
(1000/200*0.7854*10*10) +(1000/200*0.7854*0*0)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(175-(38.124/3))
Steel Stress, 'fs' = 14.75 N/mm2
(((0.94*10^6)/162.29)/392.7)
(2*0.94*10^6)/(1000*38.124*162.29)
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(14.75/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0001034 mm
(((230-38.124)/(175-38.124))*0.00007375)
Strain due to stiffening effect of concrete ε
2
Crack Width
(100*/102.96/0.24)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Water face - Y10 at 200 mm c/c Water face - Y10 at 200 mm c/c
Outer face - Y10 at 200 mm c/c Outer face - Y10 at 200 mm c/c
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Structural Data:
STAAD Results:
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Rebar diameter = 10 mm 0
Cover = 40 mm
Ast Required =
(IF(230>500,250,230/2))
(1000/200*0.7854*10*10) +(1000/200*0.7854*0.0001*0.0001)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(185-(39.33/3))
Steel Stress, 'fs' = 146.92 N/mm2
(((9.917*10^6)/171.89)/392.7)
Concrete stress 'fc' = 2.93 N/mm2
(2*9.917*10^6)/(1000*39.33*171.89)
Distance 'a' = 230 mm
Strain Es in steel for the stress of = 0.00073460 mm
(146.92/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(((230-39.33)/(185-39.33))*0.0007346)
Strain due to stiffening effect of concrete ε
2
Crack Width
Rebar diameter = 10 mm 0
Cover = 50 mm
Ast Required =
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(IF(230>500,250,230/2))
(1000/200*0.7854*10*10) +(1000/200*0.7854*0.0001*0.0001)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(175-(38.124/3))
Steel Stress, 'fs' = 63.52 N/mm2
(((4.048*10^6)/162.29)/392.7)
Concrete stress 'fc' = 1.31 N/mm2
(2*4.048*10^6)/(1000*38.124*162.29)
Distance 'a' = 230 mm
(63.52/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0004452 mm
(((230-38.124)/(175-38.124))*0.0003176)
Strain due to stiffening effect of concrete ε
2
Crack Width
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Rebar diameter = 10 mm 0
Cover = 40 mm
Ast Required =
(IF(230>500,250,230/2))
32 + 30
Ast Provided = 393 mm2
(1000/200*0.7854*10*10) +(1000/200*0.7854*0*0)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(185-(39.33/3))
Steel Stress, 'fs' = 25.72 N/mm2
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(((1.736*10^6)/171.89)/392.7)
(2*1.736*10^6)/(1000*39.33*171.89)
Distance 'a' = 230 mm
Strain Es in steel for the stress of = 0.00012860 mm
(25.72/200000)
(((230-39.33)/(185-39.33))*0.0001286)
Strain due to stiffening effect of concrete ε
2
Crack Width
(100*392.70000003927/1000/185)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Rebar diameter = 10 mm 0
Cover = 50 mm
Ast Required =
(IF(230>500,250,230/2))
(1000/200*0.7854*10*10) +(1000/200*0.7854*0*0)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(175-(38.124/3))
Steel Stress, 'fs' = 11.89 N/mm2
(((0.758*10^6)/162.29)/392.7)
(2*0.758*10^6)/(1000*38.124*162.29)
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(11.89/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0000833 mm
(((230-38.124)/(175-38.124))*0.00005945)
Strain due to stiffening effect of concrete ε
2
Crack Width
(100*/80.3/0.24)
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Water face - Y10 at 200 mm c/c Water face - Y10 at 200 mm c/c
Outer face - Y10 at 200 mm c/c Outer face - Y10 at 200 mm c/c