Pre-Stressing Strand Procurement for Bridge

The document is a request for procurement of pre-stressing strand wires for a bridge construction project in Aizawl, Mizoram. It specifies that 9,650 meters (9.0 metric tons) of 12.7mm diameter, 7-ply class 2 uncoated stress relieved low relaxation strand is required, with an ultimate tensile strength of 183.7 kN per single strand and conforming to IS 14268-1995. The strand wires will be used in the construction of a 35m span pre-stressed bridge with 3 girders and 5 cables per girder. Additional materials such as cable ducts, anchor wedges, cones and heads are also required according to revised design requirements

Uploaded by

epe civil1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views2 pages

Pre-Stressing Strand Procurement for Bridge

The document is a request for procurement of pre-stressing strand wires for a bridge construction project in Aizawl, Mizoram. It specifies that 9,650 meters (9.0 metric tons) of 12.7mm diameter, 7-ply class 2 uncoated stress relieved low relaxation strand is required, with an ultimate tensile strength of 183.7 kN per single strand and conforming to IS 14268-1995. The strand wires will be used in the construction of a 35m span pre-stressed bridge with 3 girders and 5 cables per girder. Additional materials such as cable ducts, anchor wedges, cones and heads are also required according to revised design requirements

Uploaded by

epe civil1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Subject: Procurement of Pre-Stressing Strand (Wires) for our bridge construction project at Aizawl-Mizoram

reg.,

Dear Sir,

We M/s Eco-Protection Engineers Private Limited requires the below noted material for one of construction
project consisting “Construction of Pre-Stressed Bridge for 35m span” at Aizawl-Mizoram.

S.No., Material Description /Property Quantity Confirming IS Code

1. Pre-Stressing Stand(wires) of 12.7mm


diameter 7-Ply Class 2 Uncoated
Stress relieved low relaxation strand 9650 meters (9.0 MT) IS 14268 – 1995.
with Ultimate Tensile Strength of
Single Strand to be not less than 183.7
kN.

Material Estimate Details with reference to Approved Drawings. A cable shall consist of 12 Nos 12.7mm
diameter 7-Ply Class 2 Uncoated Stress relieved low relaxation strand and 19 Nos 12.7mm diameter 7-Ply
Class 2 Uncoated Stress relieved low relaxation strand with Ultimate Tensile Strength of Single Strand to be
not less than 183.7 kN.

Span of the Bridge = 35 meters.

No of Girders = 3 Nos.,

No of Cables/Girder = 5 Nos.,

Actual length
of cables No of
Cable Total
S.No +1m strand Length in meters Weight in kg
Number Nos
per cable
in m
1 1 36.566 19 57 2084.262 1614.88
2 2 36.546 19 57 2083.122 1613.99
3 3 36.53 19 57 2082.21 1613.29
4 4 36.484 19 57 2079.588 1611.25

5 5 36.453 12 36 1312.308 1016.77

SUM 9641.49 7470.18

Therefore,

For 35 m span Quantity of Stand required = 7470.2 kg.

With 15% wastage Steel required = 8591 kg Say 9.00 Metric Ton
1.Cable Duct

For 19T12.7 – 420 mts. DUCT – 98mm (inner dimension).

2.Anchor Wedges – As per revised design requirement (24 additionally required).

3.Anchor Cone – As per revised design requirement.

4.Anchor head – As per revised design requirement.

5.Grout cap – As per revised design requirement.