Bowman Refrigeration
2.1 Parts List
2.2 Longitudinal Assembly Drawing
2.3 External Dimensions
3. Disassembly of V-Series
3.1 Preparations for Disassembly
3.2 Hand Tool Kit
3.3 Removing Compressor
3.4 Disassembly Sequence
3.4.1 Mechanical Seal
3.4.2 Unloader Indicator
3.4.3 Unloader Cover
3.4.4 Unloader Piston and Unloader Cylinder
3.4.5 Blind Cover
3.4.6 Balance Piston and Balance Piston Sleeve Portion
3.4.7 Bearing Cover
3.4.8 Thrust Bearing
3.4.9 Suction Cover and Side Bearing
3.4.10 Rotor, Rotor Casing and Variable Vi Slide Valve
206-706-3033
3.4.11 Bearing Head and Main Bearing
4. Reassembly
4.1 Bearing Head and Main Bearing
4.2 Rotor Casing, Unloader Slide Bearing, Variable Vi Slide Valve and Bearing Head
4.3 Rotor Casing and Rotors
4.4 Suction Cover
4.5 Thrust Bearing
4.6 Bearing Cover
4.7 Blind Cover, Unloader Cylinder and Unloader Piston
4.8 Unloader Cover
4.9 Mechanical Shaft Seal
5. Disassembly and Adjustment of Unloader Indicator
5.1 Disassembly of Unloader Indicator
5.2 Inspection
5.3 Assembly and Adjustment
6. Standards of Components
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
into before attempting to disassemble the unit for inspection. Read this instruction manual carefully
before undertaking any work on the system.
This screw compressor is classified as a positive displacement rotary type. It compresses the
refrigerant gas continuously using the volume change between two rotating screw profile rotors.
Refrigerant gas is trapped in the clearance between the two mated rotors and pressure increased by
decreasing the volume. The refrigerant is then discharged as a high-pressure gas
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
unsymmetrical design reduces the triangular blow off hole between the casing and the rotors to 60%,
minimizing leakage due to the pressure difference.
Normally, an oil film seals the clearance between the leading edges of the rotor lobes and the casing.
With the V-Series, however, a change has been incorporated to raise the pressure of the oil film and
the clearance between the casing and the lobe leading edges is wedge shaped.
Fig. 2 Screw Compressor cross sectional view Fig. 3 Rotor Rotation & the Compression Cycle
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 4 Suction Phase Fig. 5 Suction Side Sealing
1.1.2 Compression Phase (refer to Fig. 6)
As the rotors further rotate, the suction side of the clearance is sealed by the mating of the lobes and
the volume between the lobes decreases while the sealing line moves toward the discharge side.
206-706-3033
Fig. 6 Compression Phase
1.1.3 Discharge Phase (refer to Fig. 7)
When the volume is decreased to the designated Vi, the clearance between the discharge port and
the rotors is linked and the refrigerant is pushed to the discharge side.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
the discharge port according to the volume of the groove and is not dependent on internal pressure.
Vi (internal volumetric ratio) is used to represent the value of the decreased volume of suction
refrigerant when the groove aligns with the discharge port (or is discharged).
This can be expressed as follows:
Vi = Volume of suction refrigerant when compression begins
Volume of same quantity of refrigerant at discharge port
In other words, Vi is the ratio of the groove volume after competition of suction to the volume when the
discharge port opens.
Conventional screw compressors have three fixed Vi values, that is 2.63, 3.65 and 5.80, termed “L
port,” “M port” and “H port,” respectively.
The relationships are:
Vi = (Pd/Ps)1/k or Vik = Pd/Ps
Consequently, the Vi corresponding to the compression ratio changes according to the refrigerant
used.
For approximate values, refer to the graph given in Fig. 12. The new V-Series, Maximizer Series
206-706-3033
Screw Compressors, are designed so that the Vi can be adjusted on site according to operating
conditions.
1.3 Reasons for Adjusting Vi
Operating conditions of refrigeration systems are not always constant. As well, the same model of
compressor may be operated under a variety of pressure conditions, e.g., air conditioning, cold
storage and freezing applications. In the case of air conditioning and cold storage, the conditions will
vary depending on the need for cooling, heating, low and high temperature.
Needless to say, compressors must be operated at maximum efficiency under various conditions. The
drawback of the conventional compressor is that a fixed Vi is established for the compressor during
production. This Vi can later be changed by machining the compressor but is limited to change from a
higher to a lower value only. Variable Vi screw compressors in the Maximizer Series were developed
as an answer to this drawback. Many compressors of this type are used in special reefer carrier
applications, but because of the sophisticated structure and relatively high cost, they have not been
popular for general applications.
The V-Series, which incorporates a variable Vi, has consequently been developed for these general
applications.
The Vi of the V-Series can be readily changed between L, M and H at the installation plant according
to operating conditions.
Supersedes all previous version. This information is for reference use only and subject to change without notice
With the fixed Vi of a conventional compressor, maximum efficiency can only be obtained when the
system is operating at a pressure equivalent to the designed Vi. Unnecessary power is consumed,
however, when pressure conditions diverge from the designed value. For example, if low compression
ratio (high compression pressure or low discharge pressure) operation is carried out using a
conventional M port compressor (designed for a medium compression ratio), compression will exceed
discharge pressure and power will be wasted.
Bowman Refrigeration
206-706-3033
Fig. 8 Internal Volume Ratio Fig. 9 Relationship between design and
operating conditions
Conversely, if the same M port compressor is used under high compression conditions (high suction
pressure or high discharge pressure), the discharge port opens before internal pressure has
increased sufficiently, allowing refrigerant to flow back from the discharge port. Power is also wasted.
Obviously, if a compressor is to be operated for an extended period under varying conditions, a
variable Vi design is preferable to a fixed Vi type. For a conventional compressor with a high Vi, the
discharge port can be machined to lower the Vi but a unit with a low Vi cannot be changed to a high
Vi type. If a higher Vi is needed, the compressor must be replaced with a new one.
1.4 Variable Vi Mechanism
The Vi of a conventional screw compressor is determined by the combination of the axial discharge
port of the rotors on the bearing head and the radial discharge port of the shaft (radial discharge port
on the unloader slide valve). In the case of a conventional model, the axial and radial elements are
combined to exhibit particular characteristics at partial load. In the case of V-Series compressors, the
Vi can be changed by altering the size of the radial port while maintaining the axial port at Vi 5.10.
Supersedes all previous version. This information is for reference use only and subject to change without notice
As shown in Fig. 10A, the radial port of a conventional model becomes larger as Vi becomes smaller.
In the case of V-Series compressors, the stop position of the variable Vi unloader slide valve moves to
the discharge side and changes Vi by reducing the size of the radial port at full load operation.
As Fig. 11 shows, the refrigeration capacity changes only slightly under various Vi and other
conditions. Refrigeration capacity is influenced considerably by shaft power but changes little in
response to slight changes in operating conditions, as the diagram shows, consequently, once Vi is
adjusted to the operating conditions, it is not necessary to alter it in response to slight changes in
operating conditions.
Bowman Refrigeration
206-706-3033
Fig. 10-A Difference between Conventional Fig. 11 Conventional Screw Capacity Curve
Discharge Port and V-Series Discharge Port
The Vi must be adjusted only when there are major changes in operating conditions such as a change
in the application of the compressor. For instance, when the operating conditions of the compressor
are changed from cooling at approx. 0qC evaporative temperature to refrigeration at -40q C
evaporative temperatures with the compressor Vi set to the L port configuration, shaft power must be
double. In such a case it is advisable to change the Vi to the H port configuration. Similarly, if the
compressor is to be used for refrigeration at an evaporative temperature of 0qCa-30qC, it is advisable
to set the Vi to the M port configuration.
Temperature drops and the compression ratio “Vi” increases as refrigeration progresses but Vi should
not be changed according to the varying conditions. The Vi should be fixed during operation (when Vi
must be changed according to operating conditions, a Maximizer Screw Compressor, namely a new
V-Series unit, should be used).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
1.5 External Adjustment of Vi
a) Determine Pd/Ps during operation based on the anticipated operating conditions of the system.
Pd/Ps = Absolute value of discharge pressure = Discharge gauge pressure + 1.033 kgf/cm2
Absolute value of suction pressure Suction gauge pressure + 1.033 kgf/cm2
b) Find Vi from the compression ratio
Vi = (Pd/Ps)1/k or Vik = Pd/Ps
Vi can be found directly from the graph. (Working pressure is, however, absolute pressure)(Fig. 12)
206-706-3033
c) After determining the port, set the capacity control mechanism to the unload position.
d) Determine the number of turns needed on the Vi changing rod for the particular compressor as
given in Fig. 13.
e) Remove the cap seal on the Vi changing rod and loosen the lock nut.
Turn the Vi changing rod clockwise (CW) and confirm that the variable Vi slide valve is at the
maximum Vi position and that the Vi changing rod does not rotate (unreasonable force should
be avoided when turning the Vi changing rod). (Adjusted to H port configuration before
shipment). In case of medium port (M port), turn the Vi changing rod clockwise (CW) until it
stops and set the variable Vi slide valve to the H port position.
Supersedes all previous version. This information is for reference use only and subject to change without notice
f) Next, record the position of operation start (confirm the position of the stamp on the screw
head).
Turn the Vi changing rod counterclockwise the number of rotations indicated for the particular
compressor as given in Fig. 13.
After adjusting, secure the lock nut (approx. 1/12 of a turn after contact with the casing). When
securing the lock nut, be sure that the Vi changing rod does not rotate out of position.
g) Set the capacity control mechanism to the full load position.
If the needle pointer of the capacity control indicator indicates the specified porti range on the
Bowman Refrigeration
dial, proper adjustment is confirmed.
An amplitude is provided between the M and H graduations on the indicator dial because the
M and H positions shift depending on whether the compressor is a 160SML, 200 SML or 250
SML model as well as on the rotor length, of which there are nine. Since the graduations on
the dial are common to all models, an amplitude is provided. When the Vi changing rod is
adjusted the correct number of turns and the needle pointer position is within the specified
range, adjustment can be considered correct.
206-706-3033
Fig. 12 Graphs for determining Vi from Operating Suction and Discharge Pressure (R22, NH3)
h) Secure the hex head cap nut (453) for the Vi changing rod securely (rotate approx. 1/12 turn
after contacting casing).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Hĺ M 250VS* 250VM* 250VL* Hĺ L 250VS* 250VM* 250VL*
Distance 29mm 36.5mm 43mm Distance 58mm 72.5mm 87mm
No. of Turns 7.3 9.1 10.8 No. of Turns 14 18 21
Hĺ M 320VS* 320VM* 320VL* Hĺ L 320VS* 320VM* 320VL*
Distance 59mm 50mm 47mm Distance 98mm 98mm 105mm
No. of Turns 13 11 10 No. of Turns 21.5 21.5 23
Fig. 13 Vi Changing Rod Adjustment By Model
Reference:
Dimensions of screw used to change Vi.
Accordingly:
Number of turns x pitch = Variable Vi slide valve distance change
206-706-3033
mechanism is set to the no-load position.
2. Unreasonable force should not be applied to the mechanism provided on L port and M port
compressors.
3. If the Vi needs to be positioned midway between two different ports, select the best port
referring to the capacity chart. Do not use variable Vi except for L, M and H ports.
4. The Vi should not be changed frequently in an attempt to adjust to small changes in the
compression ratio, which may arise during normal operations. If no substantial change in
operating conditions (e.g., a change in evaporative temperature) is required, the Vi should be
changed only in the autumn and spring following the respective summer and winter seasons.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
The mechanical seal utilizes O-ring packing to allow service with various different refrigerants.
A combination of carbon and metal is used to assure the durability of the frictional parts and
the sealing effect.
c) A cam is provided to indicate the position of the variable Vi slide valve and unloader slide
valve. The capacity control ratio is shown on the dial indicator. Capacity control indication can
be output to a remote indicator using the electric circuit provided.
d) Compressor oil flow
Oil for lubrication and for injection is supplied from a high pressure side oil tank by the
pressure difference with the low pressure side or by an additional pump. Regarding oil
injection, conventional compressors have oil injected into the triangular blow hole in the mating
portion of the unloader slide valve but V-Series compressors utilize a system whereby oil is
supplied from a fixed position on the M rotor side rotor casing.
e) Unlike with conventional screw compressors, oil is also supplied to the F rotor side bearing
directly from the suction cover.
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Oil Flow
Bowman Refrigeration
Fig. 15 Schematic Diagram of Lubrication System
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
9 "O"Ring 53 Hexagon Socket Head Cap Screw
10-A Plug 54 Unloader Slide Valve
10-B Plug 58 Hexagon Socket Head Cap Screw
10-C Plug 60 Unloader Cylinder
10-D Plug 61 Hexagon Socket Head Cap Screw
11 Bearing Head 62 Hexagon Socket Head Cap Screw
12 Gasket, Bearing Head 63 "O"Ring
13 Hanger Bolt 64 Unloader Piston
14 Spring Pin 65 "O"Ring
16 Bearing Cover 66 Cap Seal
17 Gasket, Bearing Cover 67 Push Rod, Unloader Slide Valve
18-1 Hexagon Socket Head Cap Screw 68 Guide Pin
18-2 Hexagon Socket Head Cap Screw 69 Lock Nut
19 Alignment Pin 70 Lock Washer
20 Spring Pin 73 "O"Ring
21 Plug 74 Unloader Cover
22 Balance Piston Cover 75 "O"Ring
23 Gasket, Balance Piston Cover 76 Hexagon Socket Head Cap Screw
24 Hexagon Socket Head Cap Screw 77 Unloader Indicator Cam
206-706-3033
25 Male Rotor 78 Ball Bearing
26 Female Rotor 81 Hexagon Socket Head Cap Screw
27 Main Bearing 82 "V"Ring
28 Side Bearing 83 Spring
29 Stop Ring 84 Retainer
30 Balance Piston 91 Shaft Key
31 Key, Balance Piston 100 Assembly, Mechanical Seal
32 Stop Ring 120 Assembly, Unloader Indicator
33 Sleeve, Balance Piston 137 Unloader Indicator
34 Set Screw 237 Torsional Slip Washer
35 "O"Ring No. Parts Name
36 Spacer 250 Washer, Thrust Bearing
37 Stop Ring 267 Spring Washer
38 Thrust Bearing Assembly 289 Vi Slide Stop
No. Parts Name 325 "O"Ring
39 Lock Nut 326 Gland, "O"Ring
40 Lock Washer 420 Unloader Spacer
41 Spacer, Thrust Bearing Outer Race 421 "O"Ring
42 Spacer, Thrust Bearing Alignment 432 "O"Ring
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
452 Hexagon Socket Head Cap Screw 605 Plug
453 Hexagon Nut No Parts Name
454 Hexagon Socket Head Cap Screw 607 Plug
455 Spring Washer
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
3. Disassembly of V-Series
3.1 Preparations for Disassembly
Disassembly work on a base-mounted compressor unit is limited to the shaft seal; thrust bearing,
unloader cylinder and balance piston section. Disassembly and inspection work on other parts of the
compressor should be done with the unit removed from the base and positioned for maximum access
and ease of disassembly.
Disassembly and inspection work as well as handling of compressor parts should only be undertaken
after carefully reading the instructions given in this manual.
Bowman Refrigeration
3.2 Hand Tool Kit (ref. last page)
Common hand tools such as a hammer, monkey wrench, file, scraper, sandpaper (fine grain) as well
as the hand tool kit supplied with the compressor should be prepared prior to commencing
disassembly work. In addition cleaning fluid, fresh lubricating oil, and waste cloth should be available.
Work is best performed on a large surface plate positioned on a suitably large workbench.
If a surface plate is unavailable, a steel plate having dimensions of at least 800 mm x 1,000 mm and
supported on a low stand is a good substitute.
Needless to say, work should be performed in a location that is well lit, dry and free from sand and
dust.
3.3 Removing Compressor
3.3.1 Recovering Refrigerant
Refrigerant under high pressure is sealed up to the check valve of the screw compressor unit. Before
the compressor is removed from the base, internal pressure should be reduced to atmospheric or
slightly lower pressure.
The methods for reducing pressure inside the compressor vary according to the type of compressor.
In the case of a Freon refrigerant system, the following method should be used in order to prevent
206-706-3033
refrigerant gas from being discharged into the atmosphere.
a) Transfer the refrigerant to the low-pressure side of the system using a bypass valve.
b) If the system incorporates two or more compressors, draw out the refrigerant from one
compressor to another (while operating the other compressor).
c) Recover the refrigerant using a small, portable compressor.
Whatever the method, the compressor should be disconnected with a slight positive pressure and the
temperature the same or slightly higher than ambient air temperature. If it is disconnected with the
inside under vacuum and the temperature lower than the ambient air temperature, air and moisture
readily enter and may condense, leading to freezing at low temperature.
3.3.2 Disconnecting Auxiliary Equipment
Disconnect parts such as the drive coupling, suction/discharge piping, lubrication piping and other
pipes such as those for liquid injection and the economizer as well as all control wiring and mounting
bolts.
When removing piping, a drain pan should be positioned under the joint being loosened to catch oil drips.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 18 Lifting the Compressor Fig. 19 Lower cover Bolt
Lift the compressor and remove the 6a8 bolts (2) that secure the bearing head, suction cover and
rotor casing before placing the compressor on the workbench. These bolts cannot be accessed once
the compressor is sitting on the workbench.
Since the compressor and its component parts are heavy, the disconnection and lifting work involves
some danger. Take all necessary safety measures and arrange to support the compressor on
matching steel stands or square timbers (100 mm x 100 mm).
3.4 Disassembly Sequence
Disassembly and inspection of V-Series compressors should be carried out according to the following
work sequence.
For model D, the discharge flange portion extends from the leg of the compressor. Place a square
timber or piece of lumber under the compressor or position so that the flange extends beyond the
206-706-3033
surface plate (see Fig. 20).
Fig. 20
Disassembly Sequence
1) Mechanical shaft seal (100)
2) Unloader indicator (139)
3) Unloader cover (74)
4) Unloader piston (64) and cylinder (60)
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
12) Bearing head (11) and main bearing (27)
3.4.1 Mechanical Seal (100)
3.4.1.1 Disassembly
A new balance type single seal (100) is incorporated into V-Series compressors. A combination hard
metal and carbon alloy is used for the frictional surface of the seal and an O-ring is provided for
packing.
As shown in Fig. 22, the balance type mechanical seal functions well under a wide range of
conditions.
An oil seal (50) is fitted to the inside of the seal to act as an oil retainer. Because the frictional portion
of the seal is subject to wear due to the rapid rotation of the shaft, a collar (109) is provided for the
friction portion on models 200~250 so that the friction portion can be replaced.
Supersedes all previous version. This information is for reference use only and subject to change without notice
a) Remove four of the six hex-head socket cap screws (53) securing the seal cover (51), leaving
two screws symmetrically positioned. Now loosen the remaining two screws alternately,
allowing the shaft seal spring (110) to push off the cover slightly. If the cover adheres to the
gasket, free it manually after the screws have been loosened.
Bowman Refrigeration
Fig. 23 Seal Cover Portion Fig. 24 Removing Seal Cover (51)
b) Remove the seal cover. The carbon insert (101) is fitted inside the cover. Draw the cover out
over the end of the shaft being careful to prevent the carbon from hitting against the shaft.
Next, remove the O-ring (49) between the seal cover (51) and the seal retainer (48).
c) After the seal cover has been removed, wipe the shaft off and inspect it closely.
If any scratches are observed on the shaft surface, finish with fine emery paper in order to
prevent damaging the O-ring when it is pulled out of the seal.
206-706-3033
Fig. 25 Shaft Seal Cover (51) Fig. 26 Loosening Seal Collar Set Screws
d) Loosen the setscrews (111) securing the shaft seal collar (109). In the case of Model 160, the
plugs must first be removed from the bearing cover before a hex wrench can be inserted.
In the case of model 200 and above, start from the seal cover disassembly procedure.
Loosen the setscrews 3a4 turns (do not remove completely) until the end clears the shaft and
enters the seal collar.
e) Grasp the seal collar (109) with your fingertips and withdraw carefully, making sure that the
setscrew points do not catch on the shaft and scratch it.
f) Insert two eye bolts into the screw holes in the seal retainer (48) and draw it off parallel to the
shaft. Be careful not to slant the retainer when withdrawing.
g) Remove the sleeve of the oil seal (528) after loosening the two setscrews (529).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 27A Oil Seal Sleeve Fig. 27B Shaft Seal Assembly
3.4.1.2 Inspection
a) Inspect the frictional surfaces of the carbon and seal ring (104). A carbon with a smooth,
unblemished face can be reused but if there are any signs of damage or peeling, replace the
carbon, otherwise oil leakage may result.
b) Inspect the O-rings. With Freon refrigerant systems, the O-rings may suffer from swelling or
deformation. If any abnormality is observed in an O-ring, replace it. A total of four O-rings are
used for the seal cover, seal carbon and seal collar.
c) Inspect the frictional surface of the oil seal sleeve (528). If any wear is found, replace the oil
seal and the sleeve with new parts. Since the oil seal is specially designed for the compressor,
only genuine parts should be used.
d) If the seal cover gasket (527) proves difficult to remove when the seal is being disassembled,
replace with a new one.
3.4.2 Unloader Indicator
206-706-3033
The unloader indicator shows the position of the unloader slide valve (54) based on conversion of the
angle of rotation of the cylinder cam (77) to an electric signal. Two types of unloader indicator are
available. One is a contact resistance potentiometer type and the other is a non-contact electronic
type. Both are used for the same purpose as a rule. An explosion-proof indicator is also available as
an option for special applications.
3.4.2.1 Removing Unloader Indicator Assembly
When disassembling the compressor, the unloader indicator should be removed as an assembly.
a) Detach the wiring to the unloader indicator and remove the three hex-head (147) securing the
indicator cover (146)
b) The indicator cover, glass (141) and glass spacer (142) can now be removed. Be careful not to
drop the glass or glass spacer.
c) The micro-switch cam (127) or coupling which connects the potentiometer or magnetic
turntable and cylinder cam is located on the unloader cover side. Loosen the fixing screws
(128) to free the cylinder cam.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 28 Removing Indicator Cover Fig. 29 Micro-switch Cam (127) and Coupling fixing
screws (128)
d) Remove all of the hex socket head cap screws (122) securing the micro-switch base plate
(121) to the unloader cover.
Fig. 30 Loosening Micro-switch set plate screws Fig. 31 Removing Micro-switch Assembly
e) Draw out the unloader indicator parallel to the cylinder cam.
3.4.3 Unloader Cover (74)
The cylinder cam (77), shaft bearing (78) and seal are mounted in the unloader cover (74) provided at
206-706-3033
the end of the unloader cylinder (60). It is not necessary to disassemble these parts unless there is
some abnormality (e.g., seal leakage or cylinder cam groove wear).
3.4.3.1 Disassembly
a) Remove the hex-head cap screws (76) securing the unloader cover (174) to the cylinder (60).
b) The cylinder cam (77) fixed to the cover is fitted in the bore of the unloader push rod (67) and
the cam groove mates with the push rod pin. Pull of the cover parallel to the cylinder center.
Fig. 32 Removing Unloader Cover Bolts Fig. 33 Unloader Cover (74) and Cylinder Cam (77)
Supersedes all previous version. This information is for reference use only and subject to change without notice
3.4.3.2 Inspection
a) If the indicator is not actuating normally, check the cylinder cam groove, bearing and slotted
pin (unloader push set side) for abnormality.
b) If there is refrigerant or oil leakage, replace the Teflon V-ring (82).
In such a case, the shaft seal portion of the cylinder cam (77) should be disassembled
according to the following procedures.
Bowman Refrigeration
Fig. 34 Cylinder Cam Mounting Portion Fig. 35 Unloader Indicator Cam Shaft Portion
1) A bearing gland (80) provided at the unloader cover cylinder side secures the cylinder cam
(77). Remove the bearing gland (80) by loosening and removing the hex-head cap screws
(81).
2) The cylinder cam (77), ball bearing (78) and stop ring (79) can now be removed together. If the
cylinder cam and ball bearing are to be replaced, remove the stop ring first and replace the
cylinder cam and ball bearing.
3) A spring retainer (84), spring (83) and Teflon V-ring assembly (82) are fitted inside the cover.
4) Check the packing and the groove in the cylinder cam for damage or abnormal wear and
replace if necessary.
206-706-3033
3.4.4 Unloader Piston (64) and Unloader Cylinder (60)
3.4.4.1 Disassembly
a) Pull out the unloader piston to the full load position. If the Vi is adjusted to the H port, the
unloader piston will stop a bit closer than otherwise.
Straighten the claws of the lock washer (70) on the lock nut (69) securing the piston (64) to the
push rod (67).
Fig. 36 Piston Lock Nut (69) Fig. 37 Pulling out Unloader Piston (64)
Supersedes all previous version. This information is for reference use only and subject to change without notice
b) Loosen the lock nut (69) using the lock nut wrench provided in the tool kit.
If the wrench does not reach the nut, turn the Vi changing rod counterclockwise to shift the
variable Vi slide valve (289) to the L port position and then pull the piston out further.
c) Pull out the unloader piston using two eyebolt screws secured in the two screw holes located
in the unloader piston.
d) The unloader cylinder is fitted to the blind cover (22) by two short hex-head socket cap screws
(61) and to the suction cover by six long hex-head socket cap screws (62).
Remove the bolts and pull out the cylinder.
Bowman Refrigeration
Fig. 38 Checking Unloader Piston Cap Seal (66) Fig. 39 Push Rod (67) and O-Ring
And O-Ring (65)
e) Alternately, the blind cover and cylinder can be removed together as an assembly from the
suction cover by removing the six long hex-head socket cap screws (62) securing the cylinder
to the suction cover and the blind cover fitting screws (24). In this case, the cylinder will not
drop off even if the bolts are removed because the cylinder remains fixed to the suction cover.
Draw out the cylinder from the suction cover and disassemble.
3.4.4.2 Inspection
206-706-3033
a) Inspect the cap seal (66) and O-ring (65) on the unloader piston (64) and replace if any
damage or abnormality is found.
These parts should be replaced at least once every two years.
b) The inner surface of the cylinder may sometimes be coated with oil residue or scored.
Finish the inner surface with fine emery paper after cleaning.
c) Inspect the push rod (67) and O-ring (65) on the unloader piston and the O-ring (63) on the
cylinder. If the O-rings show signs of deformation, or have become hardened, replace with
new ones.
3.4.5 Blind Cover (22)
Remove the bolts (24) that secure the blind cover (22) to the suction cover (5), leaving one bolt in
place at the top to prevent the cover from falling suddenly.
The blind cover is fitted to a flat flange (92) on the suction cover and is held in place with the bolts
only. When the gasket has come free, support the cover firmly and remove the last bolt. If the gasket
adheres to the cover and flange, tap the side of the blind cover lightly with a hammer to separate the
gasket.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 40 Exploded View of Balance Piston
A piston (30) is provided on the end of the drive shaft of the male rotor to offset thrust load
hydraulically. This piston is commonly called the balance piston.
The clearance between the balance piston and the sleeve is extremely small (smaller than the
clearance between the bearing and the shaft) in order to prevent oil leakage.
3.4.6.1 Disassembly
a) Remove the stop ring (32), which secures the balance piston (30) to the shaft using a pair of
pliers. Screw an eyebolt into the hole in the balance piston and pull out parallel to the shaft.
The balance piston key (31) will remain in the keyway. Leave the key as is.
b) Hex-head socket set screws (34) are screwed into both sides to prevent rotation of the
206-706-3033
balance piston sleeve (33).
Loosen the F side screw and remove the M side screw or screw in until the head is recessed
in the suction cover.
Fig. 41 Removing Stop Ring Fig. 42 Pulling out Balance Piston (30)
c) Remove the balance piston sleeve stop ring (37).
Since the O-ring (35) pushes on the stop ring (37), it can easily be removed by pushing on the
sleeve (33).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 43 Loosening Balance Piston Sleeve Detent Fig. 44 Balance Piston Sleeve Set Screw Portion
Screws (74)
Fig. 45 Screwing in Position Detent Pin (34) Fig. 46 After Screwing in Positioning Detent Pin (34)
d) Pull out the balance piston sleeve. This is easily accomplished as the sleeve is fitted with
some clearance.
Now remove the O-ring (35) and O-ring retainer (36).
206-706-3033
e) If you plan to remove the side bearing (28) also, at this time remove the inside stop ring (29).
Supersedes all previous version. This information is for reference use only and subject to change without notice
the peripheral clearance and elasticity of the O-ring but sleeve wear is not unusual. Inspect the O-ring
(35) and replace if any deformation is found.
3.4.7 Bearing Cover (16)
The structure of this portion of the compressor differs between Model D and Model G units.
Model D is provided with a discharge flange (95). For this reason the weight of Model D units is
unbalanced, so particular care should be taken when working with it.
3.4.7.1 Disassembly
Bowman Refrigeration
a) Remove all bearing cover fixing bolts (18-1, 18-2, 18-3) and insert one or two headless stud
bolts into holes in the top of the cover.
206-706-3033
1, -2, -3) in evenly to press off the bearing cover.
When sufficient clearance is established, separate the gasket (17) from the flange face using a
spatula. Take care not to damage the gasket when removing.
Fig. 49 Vi Changing Rod Section Fig. 50 O-Ring for Vi Changing Rod (450)
d) The cover will come free of the parallel pin as clearance is increased. On Models 200a250, a
hanger bolt is provided on the top edge of the cover. Suspend the cover from a block before it
comes fully free.
Supersedes all previous version. This information is for reference use only and subject to change without notice
3.4.7.2 Inspection
Inspect the parallel pin to be sure it is not bent. Also inspect the gasket, Vi changing rod O-rings (450,
451) and thrust washer (449) and replace if any abnormality is found.
3.4.8 Thrust Bearing (38)
The thrust bearing is one of the most important components of the screw compressor. Maximum
compressor performance depends on proper installation and adjustment of the thrust bearing
otherwise operation problems may result. For this reason, maximum care should be taken when
disassembling and reassembling the bearing.
Bowman Refrigeration
The thrust bearing used on V-Series compressors is an angular type face-to-face duplex bearing with
special retainer of high accuracy. This bearing receives thrust load only as the outer race is clearance
fitted.
The bearing plays an important role in determining the clearance between the discharge end face of
the rotor and the bearing head.
3.4.8.1 Disassembly
a) Straighten the lock washer (46) claws on the bolts (45) securing the thrust bearing washer (43)
and remove the bolts. Support the bearing gland (41) by hand when removing the last bolt so
that it does not fall down.
b) Straighten the claws on the lock washer (40) for the lock nut (39) that secures the inner race of
the thrust bearing to the shaft then loosen and remove the nut.
A thin steel lining plate (237) is provided between the lock nut (39) and the washer (40).
Handle the lining plate carefully and store in a safe place. A thrust washer is also provided
between the lock washer and the inner race.
206-706-3033
Fig. 51 Bearing Gland Bolt (45) and Lock Washer (46) Fig. 52 After Thrust Bearing Gland Removed
c) The thrust bearing inner race and the shaft are clearance fitted.
Insert a 1a2 mm wire with a flat bent point into the clearance between the outer race and the
bearing step (41), hook the bearing step and remove the bearing.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 53 Drawing out Thrust Bearing Fig. 54 Set of Thrust Bearing (L side lies on R side)
Fig. 55 Stamps on Thrust Bearing Gland Fig. 56 Thrust Bearing Portion of models 160V**~200V**
(step) (41) and Thrust Adjusting Washer (42)
d) The thrust adjusting washer (42) and thrust bearing step (41) are provided behind the thrust
bearing (some models do not have this arrangement for structural reasons).
206-706-3033
Parts are stamped to indicate those for the Male (M) rotor and those for the Female (F) rotor.
Keep related parts together and do not mix. Improper assembly will cause dimensional errors
and compressor seizure (refer to Fig. 55).
Supersedes all previous version. This information is for reference use only and subject to change without notice
3.4.8.2 Inspection
a) Clean the thrust bearing thoroughly and blow dry.
Inspect the ball bearings and races. The ball bearings should be shiny bright and the ball
cages free of burrs. Also, check the clearance between the balls and cages for the bearing
step (41).
b) Holding the inner race horizontally, spin the outer race rapidly. If any abnormal vibration is felt
through your fingers, further careful inspection is needed. The vibration may be caused by fine
dust particles or be a fault in the bearing.
Bowman Refrigeration
c) Though the actual service life of a bearing depends on operating conditions, in principle the
bearing should be replaced after 30,000 hours of operation. This period is shortened
somewhat by oil fouling and by changes in temperature and load conditions, however.
If any abnormality, even of the slightest nature, is found in a bearing, replace it with a new one.
206-706-3033
a) Remove all bolts securing the suction cover (5) to the rotor casing (1). Remember that several
of the lower bolts were removed when the compressor was lifted off the base and positioned
on the workbench.
b) Screw several of the bolts into the threaded blind holes provided on the rotor casing side to
press the suction cover off evenly. The bolts should be alternately tightened little by little in
order to press the cover off evenly.
When clearance between the cover and the casing flange is sufficient, separate the gasket (6)
from one side.
c) After removing the parallel pin (3), the rotor shafts and the unloader push rod (67) remain
connected to the suction cover (5). Slide the suction cover away from the rotor casing in line
with the rotor shaft. Be sure to keep the rotors in the casing (there is a possibility that they may
come free with the suction cover due to friction).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 58 O-Ring Gland (326)
d) Remove the O-ring gland fixing screw (456) and remove the O-ring gland (326).
e) To remove the side bearing (28), first remove the stop ring (29), and then push the side
bearing out from the rotor side. If a hammer must be used to free the bearing, cushion with a
wooden block or the like to prevent damage.
3.4.9.2 Inspection
a) Inspect the unloader push rod (67), O-ring (73) and suction cover side O-ring (9) for
deformation or other damage and replace with new ones if necessary.
b) Inspect the inner face of the side bearing (28) for foreign matter imbedded in the bearing
metal. Also, measure the dimensions of the bearing (ref. Service limits provided at the end of
this manual).
3.4.10 Rotors (25,26), Casing (1) and Variable Vi Slide Valve (289)
The variable Vi slide valve and the unloader slide valve are mounted together in the rotor casing.
3.4.10.1Disassembly
a) As the screw compressor rotors are very heavy, a hemp rope or nylon belt should be made
available for use when the rotors are being removed. Suspend the rotor from the rope or belt
206-706-3033
as it is clears the casing. Either the male or the female rotor may be removed first. When
removing the female rotor, rotate the rotor counterclockwise as you pull out. When the rotor is
approx. two-thirds of the way out, lift it slightly and pull it all out the way, suspended from the
rope or belt.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 61 Pulling out M rotor (25) Fig. 62 Removing Lock Washer Bolt
b) Remove the remaining rotor in the same manner, taking care not to damage the main bearing
in the bearing head as you pull the rotor free.
c) Do not lay the rotors directly on the floor or the edges of the lobes may be damaged. Rest the
rotor shaft ends on V-blocks.
d) Remove the hex-head socket cap screw (454) securing the lock washer (445) on the end of
the Vi changing rod of the variable Vi slide valve (289) and remove the lock washer (445).
e) Turn the bearing side rod counterclockwise and draw the rod out. When the threaded portion
comes free, pull it out of the bearing head. Place the thrust washers (449) together to prevent
them from becoming lost.
206-706-3033
Fig. 63 Pulling out Variable Vi Slide Valve Fig. 64 Pulling out Unloader Slide Valve (54)
Changing Rod (444) and Variable Vi Slide Valve (289)
f) Pull the unloader slide valve (54) and the variable Vi slide valve (289) out of the casing while
holding the unloader push rod.
By pulling on the variable Vi slide valve changing rod (444), the unloader slide valve (54) can
be separated.
3.4.10.2Inspection
a) Inspect the rotor journals for damage.
The shaft seal and bearing mounting portions must be inspected.
b) Inspect the rotor lobes, especially the edges, for damage or abnormal wear. If the compressor
has been operating normally, there should be no damage found. If, however, scoring or
scratches, etc. are found, it points to a problem with the suction strainer as such damage can
only be made by foreign matter entering the system.
Supersedes all previous version. This information is for reference use only and subject to change without notice
c) Inspect the unloader slide valve (54) and the frictional surfaces and clearance between the
variable Vi slide valve (289) and the casing (1).
Also, check if the Vi changing rod (444) and the unloader slide valve bushing (448) are fitted
together. If any wear or abnormal fitting is found, replace the parts.
d) Inspect the inner surface of the rotor casing.
If no rotor damage is found, there should be no damage or abnormality of the casing inner
surface either. If rotation traces are visible on the inner surface of the rotor casing, a problem
with the journals is the most probable cause. Performance will remain unchanged despite
Bowman Refrigeration
wear of up to 0.3% of the rotor diameter; excessive wear of the leading edges of the rotors will
result in a drop in performance.
e) With some special applications, the bearing journal and the shaft seal portions are finished
with chrome plating. If any damage is found, contact the nearest MYCOM subsidiary for repair
or replacement.
3.4.11 Bearing Head (11) and Main Bearing (27)
Normally, further disassembly of this portion of the compressor is not required as there is nothing to
be gained from separation of the bearing head and rotor casing. Leave the two joined together.
To draw out the main bearing, remove the stop ring (29) from the bearing cover side using a pair of
pliers and push the main bearing out from the rotor casing side. If the bearing fit is tight, tap out using
a hammer cushioned with a plastic or wooden block. Do not strike the bearing directly with the
hammer.
Inspect the rotor shaft and the inner diameter of the bearing.
Also, examine the inner diameter of the bearing and the outer diameter of the rotor shaft to determine
if any foreign matter is imbedded in the bearing metal.
Inspect the O-ring (451) of the Vi changing rod (444) for damage or other abnormality.
4. Reassembly
206-706-3033
When disassembly, inspection and any necessary repair work are completed, the compressor must
be correctly reassembled. Before commencing reassembly, confirm that all parts are available.
Reassembly work is essentially carried out in the reverse order of disassembly. All tools and parts
should be cleaned thoroughly before beginning reassembly and parts should be coated with
compressor oil before being mounted.
4.1 Bearing (11) Head and Main Bearing (27)
a) The main bearing is clearance fitted in some cases while it is lightly press fitted in others.
Arrange a simple jig (washer and bolt) to fit the main bearing.
A positioning spring pin (14) is provided on the bearing head. Align the pin with the notch in
the main bearing (11). If the bearing must be tapped in, cushion with a plastic or wooden
block.
If the bearing gets out of position as it is being inserted, remove and carefully insert again.
Be sure to fit the O-ring oil retainer (432) provided on the outer diameter.
b) Mount the stop ring (29) to secure the bearing.
c) Confirm that the O-ring (451) is properly fitted in the hole for the Vi changing rod.
Supersedes all previous version. This information is for reference use only and subject to change without notice
d) Apply oil to both sides of the gasket before fitting it between the bearing head and rotor
casing. Since the positions of the holes in the gasket are unsymmetrical, care should be taken
to position the gasket correctly.
Bowman Refrigeration
Fig. 65 Bearing Positioning Spring Pin (14) Fig. 66 Fitting Bearing
Fig. 67 Applying Oil to Gasket Fig. 68 O-Ring for Vi Changing Rod (451)
4.2 Rotor Casing (1), Unloader Slide Valve (54), Variable Vi Slide Valve (289) and Bearing Head (11)
206-706-3033
a) Unloader slide valve (54)
Confirm that the Vi changing rod (444) moves properly. Mount the unloader push rod (67) and
fit the gasket to the hole for the Vi changing rod shaft.
b) Rotor casing (1)
Clean the oil injection holes thoroughly, fit the plug (10) and mount the unloader slide valve
(54). Confirm smooth movement of the unloader slide valve.
c) If the rotor casing (1) and bearing head (11) have been separated, assemble them now
(normally, these two parts are not disassembled). Tighten the bolts (2) to the specified torque
in a symmetrical crisscross pattern. A number of the bolts on the bottom cannot be accessed
at this time and must be tightened later when the compressor is raised.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 69 View of Unloader Slide Valve (54), Fig. 70 Unloader Slide Valve (54) and portion
Variable Vi Slide Valve (289) and Vi changing
Rod (444) Removed from Rotor Casing (1)
d) Mount the Vi changing rod (444) from the bearing head side. Be careful not to forget to install
the thrust washer (449).
Push the unloader slide valve (54) to the discharge side and fit the female screw of the
variable Vi slide valve on the Vi changing rod.
When the end of the Vi changing rod extends from the Vi slide valve, secure the lock washer.
206-706-3033
Fig. 71 O-Ring for Vi Changing Rod (451) of Fig. 72 Mounting Unloader Slide Valve (54)
Unloader Slide Valve (54)
e) If the gasket on the bearing head protrudes into the rotor casing, trim the excess gasket
material away. If the gasket is caught between the end face of the rotor and the bearing head,
thrust clearance cannot be adjusted properly.
Fig. 73 Mounting Variable Vi Slide Valve (289) Fig. 74 Mounting Bearing Head (11) and Rotor Casing
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 75 Overall View of Unloader Slide Valve (54) Fig. 76 Fitting Vi Slide Valve Lock washer
(round) (445)
And Variable Vi Slide Valve
4.3 Rotor Casing (1) and Rotors (25,26)
a) Coat the main bearing and the shaft portion of the male rotor with compressor oil and install
first. Suspend the rotor from a rope or strap at its mid point and insert into the casing half way.
Release the rope or strap and push the rotor in fully.
b) The suction side leading edges of the female rotor stamped with the numbers “1” and “2”
should be oriented toward the male rotor side.
206-706-3033
Fig. 77 Stamp Marks on Lobe Edges Fig. 78 Installing the Rotors
c) Lift the male rotor with the rope or strap. The number “1” stamped on the leading edge of one
lobe should be oriented toward the female rotor side.
d) Mate the rotors so that the leading edge of the male rotor lobe stamped with the number “1”
fits between the leading edges of the female rotor lobes stamped “1” and “2” and push the
female rotor in to half its length. Remove the belt suspending the female rotor and push it the
remainder of the way in. Proper orientation of the male and female rotor lobes is essential,
otherwise irregular lobe meshing will occur and the compressor will generate abnormal noise.
4.4. Suction Cover (5)
a) Fit the side bearing into the casing in the same manner as for the main bearing.
An O-ring (433) for the oil retainer is provided on the outer diameter. Be sure to install the O-
ring (433). If the cover must be tapped in, cushion with a plastic or wooden block and tap
around the positioning pin (8).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 79 Positioning Side Bearing (28) Fig. 80 Mounting
b) Secure the stop ring.
c) Mount the O-ring retainer (326) for the unloader push rod. The suction cover side also requires
an O-ring so do not forget to mount during the assembly work.
d) Mount the balance piston sleeve in the order of stop ring (32), O-ring retainer (36), O-ring (35),
balance piston sleeve (33) and stop ring (32).
When installing the stop ring, tap the side face slightly to ensure that it fits snugly in the
groove.
206-706-3033
Fig. 81 O-Ring Retainer (36)
e) Secure the balance piston sleeve (33) with the hex-head socket detent set screw (34) from the
female rotor side.
f) Turn the Vi changing rod (444) in the rotor casing/bearing head assembly in the
counterclockwise direction to set the Vi to the L port position. Set the unloader slide valve (54)
at the full load position.
g) Slide the suction cover across the surface plate and align the suction cover O-ring retainer
with the push rod (67)
h) Mate the side bearing (28) and rotor shafts and push the cover and casing together parallel
with the shaft.
i) Drive the positioning parallel pin (19) in from the rotor casing side and secure the bolts (94).
j) Confirm that the unloader slide valve (54) and variable Vi slide valve (289) move normally.
Rotate the male rotor shaft to confirm smooth movement.
Bowman Refrigeration
4.5 Thrust Bearing (38)
a) Confirm the M and F stamps on the thrust adjusting washers (42) and mount the thrust
bearings in the casing in the same direction as before disassembly.
Fig. 84 Thrust Bearing Mounting Side Fig. 85 Mounting Order of Thrust Bearing (38)
206-706-3033
Fig. 86 Mounting Direction Fig. 87 Thrust Washer Fig. 88 Spacer
b) Care should be taken to exclude any foreign matter or dust particles from the space between
the thrust bearing gland (41) and the adjusting washer (42).
c) The thrust bearing should be installed with the point of the “V” mark inscribed on the bearing
pointed in toward the rotor side (refer to Fig. 86). If the thrust bearing is inserted with the “V”
pointing in the opposite direction, end clearance will differ from that before disassembly
because of the different sizes of the outer and inner race side surfaces.
d) Be sure that the mounting order is correct.
If the lock washer claw is bent at the same point as before, the claw may break. For this
reason it is best to replace the lock washer (40) with a new one. If new washers are not
available, exchange the washers of the male and female rotors.
e) Fix the inner race of the thrust bearing to the rotor using the lock nut.
Supersedes all previous version. This information is for reference use only and subject to change without notice
f) If the thrust bearing is being replaced with a new one, confirm that the end clearance of the
bearing is secured while loosening the bolt little by little. Since the difference in the side faces
of the inner and outer bearing races vary even if the bearing is within specifications, no
clearance is secured in some cases. If the nuts are tightly fastened from the beginning, in this
case the bearing balls will be pressed against the rolling contact surface and damaged.
If no clearance is secured, grind the thrust bearing gland (41) or replace the thrust adjusting
washer (42) with one or greater thickness.
If only a slight clearance is required, a thing plate may be affixed to the thrust adjusting
washer.
Bowman Refrigeration
g) Press the rotor against the discharge end face with the inner race fixed to the rotor shaft.
h) The dial indicator mounted on the suction side rotor end must be set to the 0 position.
i) Fasten the thrust bearing-tightening washer (43) with the hex-head socket cap screw (45) and
hex-head bolt lock washer (46) and torque to the value given in the table below.
Compressor Fastening
Model Torque
160V** 400 kgf•cm
200V** 500 kgf•cm
250V** 600 kgf•cm
320V** 1200 kgf•cm
206-706-3033
according to one of the methods explained later.
End Clearance (Discharge Side) (Unit: mm)
Single-Stage Booster (Low-Stage)
High-Stage
VS* VL* VM*
160V** 0.04~0.06 0.20~0.22 0.24~0.26 0.22~0.24
200V** 0.05~0.07 0.26~0.30 0.31~0.35 0.28~0.32
250V** 0.06~0.08 0.40~0.44 0.50~0.54 0.45~0.49
320V** 0.23~0.27 0.70~0.76 0.73~0.79 0.77~0.83
Bowman Refrigeration
Fig. 90B Adjusting End Clearance
i. First method:
Since the dimension at “A” shown in Fig. 90B is too large because the thrust adjusting washer
is too thick, the face of the washer must be ground down by the amount of the difference
between the measured value and the specified value.
To accomplish this, a high precision surface grind must be used to ensure that both sides of
the washer are parallel. After machining, measure the thickness around the entire
circumference of the washer using a micrometer.
This method can be used for all models.
ii. Second Method
206-706-3033
Insert a shim of the required thickness between the bearing gland (41) and the outer race of
the bearing. The thickness of the shim is determined by the difference between the measured
value and the specified value.
A shim of brass or copper should not be used if the system refrigerant is ammonia because
these materials are easily corroded by the gas. An iron shim should be used instead.
2) When the end clearance is smaller than the specified value.
In this case, the rotor will not rotate when the lock nuts are tightened. The reason is that the
thrust adjusting washer (42) is not thick enough or the bearing gland (41) is too thick.
Accordingly, a shim of the required thickness must be inserted between the thrust adjusting
washer and the inner race of the thrust bearing. Using a new thrust adjusting washer with the
correct thickness is much better than adjusting the thickness with shims.
If the gland is too thick, it should be ground to the necessary dimensions (since no gland is
proved on the 250V** and larger compressor models, adjustment must be accomplished with
the adjusting washer (42)).
After adjusting the clearance, measure several times and confirm that the proper end
clearance is achieved.
k) Rotate the male rotor manually to confirm smooth rotation.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 91 Determining Axial Deflection
l) Next, check the axial deflection of shaft rotation with the dial indicator positioned on the oil
seal fitting portion.
Maximum deflection of the 0.015 mm is acceptable.
Deflection may be cause by no uniformity of the thrust adjusting washer or mismatching of the
stamped bearing parts. Even if the end clearance is within the specified value, disassembly
and adjustment by changing the relative positions of the gland, thrust adjusting washer and
bearing will be necessary. Accurate assembly of the bearing parts is vital for the long life and
maximum performance of the compressor. If dust is caught between the parts, the deflection
value will increase.
m) After completing end clearance adjustment, tighten the thrust bearing securely.
Notes:
1) Always use new lock nuts (39) and lock washers (40).
2) Be sure to position the shim between the lock nut (39) and the lock washer (40).
3) Tighten the lock nuts securely.
Specified torque values are shown in the table in paragraph i)-(1) above. At the plant site, however, it
206-706-3033
may be necessary to use a hammer to tighten the nuts if a torque meter is not available. Take the
utmost care to ensure that neither the lock nut nor lock washers are damaged.
4) When tightening the lock nut, mesh the lock nut and the claw of the lock washer and tighten the nut
carefully to the specified torque value. Do not turn the nut counter-clockwise. After the necessary
tightening torque is confirmed, bend the claw of the lock washer. The corners of the thrust bearing hex-
head bolt lock washer (46) should also be bent back to lock.
4.6 Bearing Cover (16)
a) Fit the thrust washer (446) on the Vi changing rod (444).
Supersedes all previous version. This information is for reference use only and subject to change without notice
b) Screw a long stud bolt into the bearing head and fit the gasket and the bearing cover, taking
care not to damage the shaft seal portion.
First mount the Vi changing rod (444), then align the parallel pin (3) and push the bearing
cover onto the bearing head, being careful to maintain even alignment.
Screw two bolts in at diagonal positions to assure the bearing cover is parallel.
Secure the remaining bolts after the full face of the bearing cover contacts the bearing head.
Bowman Refrigeration
Fig. 93 Vi Changing Rod (444) After Bearing Fig. 94 Full View of Bearing Cover
Cover Fitted
4.7 Blind Cover (22), Unloader Cylinder (60) and Unloader Piston (64)
a) Fit the O-ring (65) on the unloader piston (64) and cover the cap seal (66).
Mount the piston in the unloader cylinder (60) from the beveled (rotor) side.
Adjust the position so that the threaded blind hole for the piston faces the unloader cover side.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 97A Unloader Cylinder and Blind Cover Fig. 97B
d) Tighten the bolts securing the blind cover and unloader cylinder to the suction cover (5).
206-706-3033
a) Fit the ball bearing (78) on the cylinder cam shaft. When pushing the bearing onto the shaft,
apply pressure on the inner race of the bearing only, otherwise the bearing may be damaged.
Push the bearing onto the stepped portion of the cylinder cam and fix with the stop ring (79).
b) Apply a generous coating of oil to the V-ring (82) and fit the V-ring on the cover side,
positioning the top of the “V” of the ring to face the inside and the bottom of the “V” to face the
outside.
c) Fit the spring (83) and the spring retainer (84) and mount the shaft of the cylinder cam
assembled in a) above on the V-ring (82). Fasten the bearing (78) with the bearing gland (80).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 99 Mounting Unloader Cover Fig. 100 Exploded View of Unloader Cover (74)
d) Rotate the cylinder cam (77) manually to confirm smooth rotation.
Fit the O-ring (75) on the unloader cover (74).
e) Position the unloader slide valve (54) in the no-load position (piston at the innermost point)
and push in the cover while mating the groove on the cylinder cam with the pin on the push
rod (67).
Fasten the screws (76) with the outlet of the unloader piston hydraulic piping facing up (ref.
Fig.100).
4.9 Mechanical Shaft Seal
a) Clean the contact surface of the shaft seal thoroughly before assembling.
b) Carefully inspect the seal contact surface on the stepped portion of the shaft for flaws and
scratches before assembling.
206-706-3033
c) When mounting the seal retainer (48), confirm that it is positioned in the correct direction.
Position the seal retainer so that the oil induction hole is located above the shaft. Be sure that
the seal retainer detent screw (529) and the notch in the retainer are correctly mated and turn
the seal retainer to the left and right using an eye bolt to confirm that it is securely fixed.
Fig. 101 Seal Retainer (48) and Oil Seal Fig. 102 O-Ring (49)
d) Next, insert the seal cover O-ring (49). Note that this part is sometimes forgotten during
assembly.
Supersedes all previous version. This information is for reference use only and subject to change without notice
e) Fit the oil seal sleeve (528) and secure the two set screws (529).
f) Mount the shaft seal assembly (100).
Push the O-ring (49) in carefully so that it is not damaged. Two screws are provided for the
seal collar (109). Secure the screws (111) making sure that they mate with the countersunk
holes in the shaft. After mounting, push on the seal ring (104) manually to confirm axial
movement.
g) Fit the O-ring (103) for the carbon and the carbon insert (101) in the seal cover (50).
Fit the gasket (52) on the seal cover (50) and position it correctly to match the oil holes in the
Bowman Refrigeration
bearing cover and then fit the seal cover by sliding it onto the shaft. When fastening the seal
cover, the carbon should first contact the seal ring (104).
Fig. 103 Mechanical Shaft Seal (100) Fig. 104 Mounting Carbon Insert (101)
Hold the seal cover securely against the bearing cover and secure it first with two diagonally
positioned bolts (53), then mount and tighten all of the other bolts (53).
Fig. 105 Seal Cover (50) Fig. 106 Plug for Model 160V** Seal Collar 206-706-3033
h) Model 160V
has holes for the seal collar set screws in the bearing cover. These holes must
be plugged with blind plugs after mounting the seal cover (ref. Fig. 106).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 107 106V**~250V** Standard Indicator
5.1 Disassembly and Adjustment of Unloader Indicator (120)
a) Remove the machine screw (140) securing the indicator pointer (139).
b) Remove the machine screw (138) securing the dial plate (137).
c) The potentiometer mounting plate (130) is fitted between the dial plate support (1) (134) and
dial support (2) (135).
Loosen and remove support (2) by turning counterclockwise while holding support (1)
securely.
d) When the right and left supports are removed, the potentiometer (129) can be removed
together with the mounting plate (130).
206-706-3033
(1) (2)
Potential for slide
valve position c c c
feedback
Micro-switch for slide
valve no-load position c c
signal
Micro-switch for slide
valve full-load position c
signal
Micro-switch for slide
valve special position d
signal
Micro-switch cam for
standard actuation c c
Micro-switch cam for
standard actuation c
Fig. 108 System with Two Micro-Switches
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
e) The potentiometer is secured to the mounting plate with three machine screws (131).
f) The micro-switch (125) is secured with two long machine screws (126).
Loosen these screws to remove the micro-switch.
The micro-switch component on the right side is for the no-load position signal and the one on
the left side is for the full-load position signal.
206-706-3033
The micro-switch set plate (123), secured by other screws (124), is mounted under the left
side micro-switch component. The micro-switch component on the right side is for the no-load
position signal while the one on the left side is for the full-load position signal.
The micro-switch set plate (123), secured by other screws (124) is mounted under the left side
micro-switch component. Adjustment of the micro-switch is accomplished using with micro-
switch cam (127).
g) The terminal block (132) and other parts can be removed by removing the screws (133)
securing them.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
5.2 Inspection
a) Only actuation of the electrical components needs to be inspected.
Since a full rotation type potentiometer is used, test to confirm smooth resistance throughout
the full rotation of the device.
Operation in an atmosphere containing moisture or corrosive gas will lead to rusting of the
components and resistance may change, resulting in faulty operation indication.
b) Check the actuation of the contact points of the micro-switch components using a tester (for
details contact the Electric Department of Mycom).
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
mounted on the unloader cover (74).
206-706-3033
c) Correct positioning of the potentiometer is established by the work indicated in the above
paragraph b).
d) Fit the dial plate and mount the indicator pointer (139), aligning it to the no-load position.
If a full load micro-switch is provided, adjust the micro-switch setting screw (126) so that it is
actuated by the cam.
Actuation of the micro-switch (125) is confirmed by moving the unloader slide valve (54) to the
full load position with oil pressure when the hydraulic pump can be operated or by supplying
low-pressure air to the unloader piston (64).
If the machine screws (126) of the micro-switch are loose, the micro-switch may slip out of
position, resulting in irregular or faulty actuation. Secure the micro-switch tightly after
confirming actuation.
e) After confirming proper actuation, connect the control wiring as before and mount the unloader
indicator cover (146). Be careful not to pinch the wires with the cover.
Disassembly, inspection and reassembly of the V-Series compressor unit are now completed.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
Fig. 112 Adjustment of Potentiometer at Fig. 113 Groove in Micro-Switch Cam
No-Load Position
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
6. Standards of Components
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Compressor Oil
The quality of lubricating oil significantly affects the performance and life of the compressor. Important
requirements of refrigeration system lubricating oil include suitable viscosity over a wide temperature
range, low fluidity and high flash point.
Taking the above-mentioned characteristics of lubricating oil into consideration, oil used should satisfy
the following requirements:
1) Proper viscosity should be maintained within the potential working temperature range.
Bowman Refrigeration
2) Low fluidity should be maintained at low temperature.
3) The oil should be chemically stable, with no corrosion effect on metal and no effects on system
parts made of rubber.
4) The oil should not experience wax separation at low temperature.
5) The oil should not generate sludge or carbon under high temperature conditions.
6) The oil should be free from moisture and foreign matter.
7) The oil should be able to provide the necessary lubricating effect for a long period of time.
Selection of Compressor Oil
a) First, consider the lubrication requirements of the compressor. Obviously, oil of proper
viscosity must be supplied to the moving parts at all times.
b) Next, consider oil circulation throughout the system. Contradictory factors such as high oil
viscosity in the evaporator and low oil viscosity in the compressor must be reconciled.
c) When using Halocarbon refrigerant, even though the proper initial viscosity was secured, a
considerable change in viscosity is inevitable because under certain operating conditions the
refrigerant will dissolve in the oil. For this ISO-VG46 (JIS K2211) grade oil is recommended.
Changing Compressor Oil Brands
206-706-3033
When changing from a brand of oil normally used to a new brand, unexpected problems may
be encountered due to incompatibility of the old and new oils when they are mixed. Exercise
care when changing oil brands.
a) If the new oil is produced by a different manufacturer, consult with both makers to determine if
the change will cause any problem.
b) Changing the viscosity grade of the same maker’s oil is acceptable, e.g., SUNISO 4GS Æ
SUNISO 5GS.
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice
Bowman Refrigeration
206-706-3033
Supersedes all previous version. This information is for reference use only and subject to change without notice